Permit: T22CM08126
Permit Details
Apply Date:
10/20/2022
Applicant:
Description:
Renovation to existing Funeral Home, interiors only. No additional SF added. Updates to systems with
Permit Reviews
Permit Number - T22CM08126
Permit Status: Complete
Permit Description: Renovation to existing Funeral Home, interiors only. No additional SF added. Updates to systems with
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 10/20/2022 | COMMERCIAL - BLDG/FIRE/ZONING/ENG | 10/20/2022 | ACTIVE |
| 01/24/2023 | COMMERCIAL REVIEW - FULL v.2 | 02/15/2023 | REQUIRES RESUBMIT |
| 08/09/2023 | COMMERCIAL REVIEW - FULL v.1 | 08/31/2023 | REQUIRES RESUBMIT |
| 08/08/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 08/13/2024 | APPROVED |
| 10/28/2022 | COMMERCIAL REVIEW - FULL v.1 | 12/01/2022 | REQUIRES RESUBMIT |
| 03/29/2023 | RESTAMP - COMMERCIAL v.1 | 04/03/2023 | APPROVED |
| 09/12/2023 | COMMERCIAL REVIEW - FULL v.2 | 09/13/2023 | APPROVED |
| 09/13/2023 | RESTAMP - COMMERCIAL v.1 | 09/14/2023 | APPROVED |
| 06/26/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 06/27/2024 | APPROVED |
| 03/01/2023 | COMMERCIAL REVIEW - FULL v.3 | 03/29/2023 | APPROVED |
| 06/11/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 06/13/2024 | APPROVED |
Conditions
Permit Number - T22CM08126
Permit Status: Complete
Permit Description: Renovation to existing Funeral Home, interiors only. No additional SF added. Updates to systems with
| Date | Description | Comments |
|---|---|---|
| 06/11/2024 | AIR BALANCING REPORT IS REQUIRED. | |
| 03/29/2023 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. | |
| 08/15/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. |
Outstanding Inspections
Permit Status: Complete
Permit Number: T22CM08126
Permite Description: Renovation to existing Funeral Home, interiors only. No additional SF added. Updates to systems with
Total Outstanding Inspections - 3
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/13/2023 | COT - HCBU - Framing | N/A | Partial Pass | 12/13/2023 Venue room #1. North and west wall. Okay to proceed progress areas. |
| 12/20/2023 | COT - HCPL - Rough Soil | N/A | Partial Pass | Partial pass. Women’s bathroom, flower room, prep room. Powder room, janitors closet. Mens room (pending urinals in men’s room and drinking fountain.) okay to backfill progress areas. Shading is required. 12/20/2023 |
| 06/28/2024 | SITE - Zoning Final | N/A | Not Ready | I have looked at this site and I’m not able to make a favorable inspection at this time because there are too many things that are missing from the approved set of plans. I will turn this inspection as is not ready and advise the contractor to have the engineer record work on submitting documents that reflect the current on-site conditions so that they can be approved and we can perform this inspection again at a later date. During this process, they will need to revise the landscape drawings for the site and show what type of landscape is to be installed prior to the final. Also the compliancy of the ADA parking space and access. I’ll appears to be non-compliant at this time and will need to be either change to a different location or work will have to be done to correct all the current issues. A reinspection of this site will not be performed until the new set of plans have been provided and approved for this site by this department. |
Completed Inspections
Permit Status: Complete
Permit Number: T22CM08126
Permit Description: Renovation to existing Funeral Home, interiors only. No additional SF added. Updates to systems with
Total Completed Inspections - 21
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/13/2023 | COT - HCBU - Firewall/Fire Barrier/Firestop | Passed | ||
| 01/23/2024 | COT - HCEL - Electrical Progress | Passed | ||
| 02/23/2024 | COT - HCBU - Framing | Passed | 2/23/24: Rough framing is complete throughout building. Okay to proceed with drywall installation on walls and ceilings. | |
| 02/23/2024 | COT - HCEL - Electrical Intermediate | Passed | Electrical rough-in complete. Okay to proceed with drywall installation throughout building. | |
| 02/23/2024 | COT - HCME - Mechanical Intermediate | Passed | Rough-in of New mechanical ductwork is installed in ceilings and soffits. Okay to proceed with drywall work. | |
| 02/23/2024 | COT - HCEL - Electrical Above Ceiling | Passed | Electrical rough-in complete. Okay to proceed with drywall installation throughout building. | |
| 02/23/2024 | COT - HCBU - Building Progress | Passed | 2/23/24: Framing, mechanical, electrical, and plumbing rough-in is complete. Okay to proceed with drywall installation throughout building. | |
| 02/23/2024 | COT - HCME - Mechanical Above Ceiling | Passed | Rough-in of New mechanical ductwork is installed in ceilings and soffits. Okay to proceed with drywall work. | |
| 02/23/2024 | COT - HCPL - Plumbing Above Ceiling | Passed | Plumbing rough-in is complete. Okay to proceed with drywall installation throughout building. | |
| 02/23/2024 | COT - HCPL - Plumbing Intermediate | Passed | Plumbing rough-in is complete. Okay to proceed with drywall installation throughout building. | |
| 02/23/2024 | COT - HCME - Mechanical Progress | Passed | Rough-in of New mechanical ductwork is installed in ceilings and soffits. Okay to proceed with drywall work. | |
| 02/23/2024 | COT - HCBU - Building Above Ceiling | Passed | 2/23/24: Framing, mechanical, electrical, and plumbing rough-in is complete. Okay to proceed with drywall installation throughout building. | |
| 02/23/2024 | COT - HCBU - Interior Shear Bracing | Passed | ||
| 06/10/2024 | COT - BULD - SWG Clearance | Passed | Completed gas pressure test | |
| 06/20/2024 | COT - HCPL - Rough Soil | Passed | ||
| 06/27/2024 | COT - HCPL - Plumbing Final | Passed | ||
| 06/27/2024 | COT - HCME - Mechanical Final | Passed | ||
| 06/27/2024 | COT - HCEL - Electrical Final | Passed | ||
| 06/28/2024 | COT - HCBU - Building Final | Passed | ||
| 07/03/2024 | ENGR Engineering Final | Passed | TI only. No exterior changes or DP. | |
| 07/23/2024 | COT - FCON - Fire - Final | Passed |