Permit Details

Status:
Complete
Type:
Commercial Building
Address:
3435 N 1ST AV
Address NEW:
3435 N 1ST AV
Apply Date:
10/20/2022
Applicant:
Description:
Renovation to existing Funeral Home, interiors only. No additional SF added. Updates to systems with

Permit Reviews

Permit Number - T22CM08126
Permit Status: Complete
Permit Description: Renovation to existing Funeral Home, interiors only. No additional SF added. Updates to systems with
Start Date Submittal Complete Date Status  
10/20/2022 COMMERCIAL - BLDG/FIRE/ZONING/ENG 10/20/2022 ACTIVE Review Details
01/24/2023 COMMERCIAL REVIEW - FULL v.2 02/15/2023 REQUIRES RESUBMIT Review Details
08/09/2023 COMMERCIAL REVIEW - FULL v.1 08/31/2023 REQUIRES RESUBMIT Review Details
08/08/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 08/13/2024 APPROVED Review Details
10/28/2022 COMMERCIAL REVIEW - FULL v.1 12/01/2022 REQUIRES RESUBMIT Review Details
03/29/2023 RESTAMP - COMMERCIAL v.1 04/03/2023 APPROVED Review Details
09/12/2023 COMMERCIAL REVIEW - FULL v.2 09/13/2023 APPROVED Review Details
09/13/2023 RESTAMP - COMMERCIAL v.1 09/14/2023 APPROVED Review Details
06/26/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 06/27/2024 APPROVED Review Details
03/01/2023 COMMERCIAL REVIEW - FULL v.3 03/29/2023 APPROVED Review Details
06/11/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 06/13/2024 APPROVED Review Details

Conditions

Permit Number - T22CM08126
Permit Status: Complete
Permit Description: Renovation to existing Funeral Home, interiors only. No additional SF added. Updates to systems with
Date Description Comments
06/11/2024 AIR BALANCING REPORT IS REQUIRED.
03/29/2023 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit.
08/15/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.

Outstanding Inspections

Permit Status: Complete
Permit Number: T22CM08126
Permite Description: Renovation to existing Funeral Home, interiors only. No additional SF added. Updates to systems with
Total Outstanding Inspections - 3
Last Inspection Date Description Inspector Results Comments
12/13/2023 COT - HCBU - Framing N/A Partial Pass 12/13/2023 Venue room #1. North and west wall. Okay to proceed progress areas.
12/20/2023 COT - HCPL - Rough Soil N/A Partial Pass Partial pass. Women’s bathroom, flower room, prep room. Powder room, janitors closet. Mens room (pending urinals in men’s room and drinking fountain.) okay to backfill progress areas. Shading is required. 12/20/2023
06/28/2024 SITE - Zoning Final N/A Not Ready I have looked at this site and I’m not able to make a favorable inspection at this time because there are too many things that are missing from the approved set of plans. I will turn this inspection as is not ready and advise the contractor to have the engineer record work on submitting documents that reflect the current on-site conditions so that they can be approved and we can perform this inspection again at a later date. During this process, they will need to revise the landscape drawings for the site and show what type of landscape is to be installed prior to the final. Also the compliancy of the ADA parking space and access. I’ll appears to be non-compliant at this time and will need to be either change to a different location or work will have to be done to correct all the current issues. A reinspection of this site will not be performed until the new set of plans have been provided and approved for this site by this department.

Completed Inspections

Permit Status: Complete
Permit Number: T22CM08126
Permit Description: Renovation to existing Funeral Home, interiors only. No additional SF added. Updates to systems with
Total Completed Inspections - 21
Date Description Inspector Results Comments
12/13/2023 COT - HCBU - Firewall/Fire Barrier/Firestop Passed
01/23/2024 COT - HCEL - Electrical Progress Passed
02/23/2024 COT - HCBU - Framing Passed 2/23/24: Rough framing is complete throughout building. Okay to proceed with drywall installation on walls and ceilings.
02/23/2024 COT - HCEL - Electrical Intermediate Passed Electrical rough-in complete. Okay to proceed with drywall installation throughout building.
02/23/2024 COT - HCME - Mechanical Intermediate Passed Rough-in of New mechanical ductwork is installed in ceilings and soffits. Okay to proceed with drywall work.
02/23/2024 COT - HCEL - Electrical Above Ceiling Passed Electrical rough-in complete. Okay to proceed with drywall installation throughout building.
02/23/2024 COT - HCBU - Building Progress Passed 2/23/24: Framing, mechanical, electrical, and plumbing rough-in is complete. Okay to proceed with drywall installation throughout building.
02/23/2024 COT - HCME - Mechanical Above Ceiling Passed Rough-in of New mechanical ductwork is installed in ceilings and soffits. Okay to proceed with drywall work.
02/23/2024 COT - HCPL - Plumbing Above Ceiling Passed Plumbing rough-in is complete. Okay to proceed with drywall installation throughout building.
02/23/2024 COT - HCPL - Plumbing Intermediate Passed Plumbing rough-in is complete. Okay to proceed with drywall installation throughout building.
02/23/2024 COT - HCME - Mechanical Progress Passed Rough-in of New mechanical ductwork is installed in ceilings and soffits. Okay to proceed with drywall work.
02/23/2024 COT - HCBU - Building Above Ceiling Passed 2/23/24: Framing, mechanical, electrical, and plumbing rough-in is complete. Okay to proceed with drywall installation throughout building.
02/23/2024 COT - HCBU - Interior Shear Bracing Passed
06/10/2024 COT - BULD - SWG Clearance Passed Completed gas pressure test
06/20/2024 COT - HCPL - Rough Soil Passed
06/27/2024 COT - HCPL - Plumbing Final Passed
06/27/2024 COT - HCME - Mechanical Final Passed
06/27/2024 COT - HCEL - Electrical Final Passed
06/28/2024 COT - HCBU - Building Final Passed
07/03/2024 ENGR Engineering Final Passed TI only. No exterior changes or DP.
07/23/2024 COT - FCON - Fire - Final Passed

Documents

File Name Document Type  
COFO_FINALCOFO_COMMERCIAL.PDF DOCUMENTS VIEW
ABBEY SPECIAL INSPECTION MEMO ON DOWELS (2)_V1.PDF DOCUMENTS VIEW
24F0618 TURNERRES FINAL 06 25 2024 1711-2024-06-26_V1.PDF DOCUMENTS VIEW
DURAZO CONSTRUCTION CORPORATION MAIL - RAH ARCHITECTS_ ABBEY FUNERAL HOME T22CM08126_V1.PDF DOCUMENTS VIEW
ABBEY TI TEST AND BALANCE_V1.PDF DOCUMENTS VIEW
ABBEY TI TEST AND BALANCE_V1.PDF DOCUMENTS VIEW
4_RAH VE ABBEY TI PLANS_V2.PDF DOCUMENTS VIEW
1_CALC PACKAGE_V1.PDF DOCUMENTS VIEW
2_ABBEY PERMIT REVIEW RESPONSE_V1.PDF DOCUMENTS VIEW
3_ABBEY REVISION NARRATIVE_V1.PDF DOCUMENTS VIEW
CONS-1_PLAN SET_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
1_CALC PACKAGE_V1.PDF DOCUMENTS VIEW
2_ABBEY PERMIT REVIEW RESPONSE_V1.PDF DOCUMENTS VIEW
CONS-1_PLAN SET_V1.PDF DOCUMENTS VIEW
CONS-2_RAH ABBEY TI_V1.PDF DOCUMENTS VIEW
CONS-2_RAH ABBEY TI_V1.PDF DOCUMENTS VIEW
1_APPLICATION_V1.PDF DOCUMENTS VIEW
1_CALC PACKAGE_V1.PDF DOCUMENTS VIEW
1_SYSTEM DESIGN REPORT_V1.PDF DOCUMENTS VIEW
2_CALC PACKAGE_V2_V1.PDF DOCUMENTS VIEW
22232 MECH CHECK_V1.PDF DOCUMENTS VIEW
CONS-1_PLAN SET_V1.PDF DOCUMENTS VIEW
CONS-2_RAH ABBEY TI_V1.PDF DOCUMENTS VIEW
1_CALC PACKAGE_V1.PDF DOCUMENTS VIEW
2_ABBEY PERMIT REVIEW RESPONSE_V2_V1.PDF DOCUMENTS VIEW
22232 MECH CHECK_V2.PDF DOCUMENTS VIEW
CONS-1_PLAN SET_V1.PDF DOCUMENTS VIEW