Permit Review Detail
Review Status: Approved
Review Details: COMMERCIAL REVIEW - FULL v.3
Permit Number - T22CM08126
Review Name: COMMERCIAL REVIEW - FULL v.3
Review Status: Approved
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 03/29/2023 | External Reviewers - SAFEBuilt | APPROVED | Activity Number: T22CM08126 GENERAL: Provide written responses to all review comments. Provide a complete plan set. Provide additional documents as requested by review staff. STRUCTURAL REVIEW COMMENTS: Conditinally Approved NOTE: Every effort has been made to identify the code violations. Any oversight by the review team shall not be considered an authority to violate, set aside, cancel or alter applicable codes or ordinances. The plan review and permit issuance shall not be considered a warranty or guarantee. The Structural Engineer is responsible for following ALL applicable Federal, State and local Municipal Codes and Ordinances. BUILDING REVIEW COMMENTS: Conditinally Approved Approval limited to the architectural submittal reflected within "2_Calc Package_v2_v1.pdf". Every effort has been made to identify the code violations. Any oversight by the review team shall not be considered an authority to violate, set aside, cancel, or alter applicable codes or ordinances. The plan review and permit issuance shall not be considered a warranty or guarantee. The registered design professional is responsible for following ALL applicable Federal, State, and local Municipal Codes and Ordinances. MECHANICAL REVIEW COMMENTS: Conditinally Approved Approved/subject to field approval ELECTRICAL REVIEW COMMENTS Approved PLUMBING REVIEW COMMENTS: Conditinally Approved Third Plumbing Review: = OK Subject To Field Inspections 1). Subject To Field Inspections- Plan page A1.04 needs to show restroom fixture spacing - side wall or partition to fixture center all restroom fixtures, fixture to fixture center separations for lavs & urinals. IPC 404.2, 405.3.1 **Plan pages need to show the clearance from lav to lav centers and same with the urinals. Also show the sidewall to fixture center distances- IPC 403.1** 2). OK 3). OK If you require additional clarification regarding these comments, please contact Doris Benoit at doris.benoit@tucsonaz.gov |
||
| 03/29/2023 | Bldg Permits - Post Review Express | REVIEW COMPLETED | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. | ||
| 03/01/2023 | PDSD Application Completeness Express | REVIEW COMPLETED |