Permit: T22CM05810
Permit Details
Status:
Complete
Type:
Residential Building - One or Two Family
Address:
722 N TUCSON BL
Address NEW:
722 N TUCSON BL
Apply Date:
07/29/2022
Applicant:
Description:
REV2: Updated plans for Final REV1: Change Floor Plan Layout and Delete Roof Deck R-SFR Remodel and Addition
Permit Reviews
Permit Number - T22CM05810
Permit Status: Complete
Permit Description: REV2: Updated plans for Final
REV1: Change Floor Plan Layout and Delete Roof Deck
R-SFR Remodel and Addition
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 07/29/2022 | RESIDENTIAL - BLDG/ZONING/ENGINE/NPPO | 08/26/2022 | COMPLETED |
| 09/22/2022 | RESUBMITTAL | 10/07/2022 | COMPLETED |
| 10/17/2022 | RESUBMITTAL | 10/17/2022 | ACTIVE |
| 11/26/2025 | RESIDENTIAL NEW DWELLING REVISION v.1 | 12/12/2025 | REQUIRES RESUBMIT |
| 12/18/2025 | RESIDENTIAL NEW DWELLING REVISION v.2 | 12/23/2025 | APPROVED |
| 10/28/2022 | RESIDENTIAL NEW DWELLING v.1 | 11/22/2022 | APPROVED |
| 10/16/2025 | RESIDENTIAL NEW DWELLING v.1 | 11/26/2025 | REQUIRES RESUBMIT |
Conditions
Permit Number - T22CM05810
Permit Status: Complete
Permit Description: REV2: Updated plans for Final
REV1: Change Floor Plan Layout and Delete Roof Deck
R-SFR Remodel and Addition
| Date | Description | Comments |
|---|---|---|
| 11/24/2025 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. |
Outstanding Inspections
Permit Status: Complete
Permit Number: T22CM05810
Permite Description: REV2: Updated plans for Final
REV1: Change Floor Plan Layout and Delete Roof Deck
R-SFR Remodel and Addition
Total Outstanding Inspections - 9
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/07/2023 | COT - RSPL - Yard Water Line | N/A | Not Applicable | |
| 03/14/2023 | COT - RSBU - Excavation/Rebar/Zoning | N/A | Canceled | |
| 08/17/2023 | COT - RSEL - Grounding/Bonding | N/A | Not Applicable | |
| 04/29/2025 | COT - RSBU - Interior Shear Bracing | N/A | Not Applicable | Duplicate inspection. 4/25/2025 |
| 04/29/2025 | COT - RSBU - Preslab | N/A | Not Applicable | Duplicate inspection. 4/25/2025 |
| 12/12/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | N/A | Re-inspection required | 12/12/23: fire foam all top plate penetrations. Stud shoe needed for over size notches in studs. Receptacles for wall mount tvs need to have boxes installed. All shower pans need to be under test. |
| 04/29/2025 | COT - RSPL - Gas Pressure Test | N/A | Not Applicable | |
| 04/29/2025 | COT - RSPL - Rough Soil | N/A | Not Applicable | Duplicate inspection. 4/25/2025 |
| 11/07/2023 | COT - RSEL - Electrical Final | N/A | Not Ready |
Completed Inspections
Permit Status: Complete
Permit Number: T22CM05810
Permit Description: REV2: Updated plans for Final
REV1: Change Floor Plan Layout and Delete Roof Deck
R-SFR Remodel and Addition
Total Completed Inspections - 10
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/07/2023 | COT - RSPL - Sewer | Passed | ||
| 04/03/2023 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
| 12/05/2023 | COT - RSPL - Plumbing Final | Passed | ||
| 01/09/2024 | BULD - Electrical Clearance | Passed | ||
| 01/02/2024 | COT - RSEL - Temporary Service | Passed | Approved service panel upgrade, INCR Clearance to TEP is required for the construction power | |
| 01/13/2026 | ENGR Engineering Final | Passed | ||
| 01/15/2026 | COT - RSME - Mechanical Final | Passed | 1.15.26 Changes have all been made as requested per previous notes. Approved |
|
| 01/15/2026 | COT - RSEL - Outdoor Lighting | Passed | 1.15.26 Changes have all been made as requested per previous notes. Approved |
|
| 01/15/2026 | COT - RSEL - Electrical Final | Passed | 1.15.26 Changes have all been made as requested per previous notes. Approved |
|
| 02/20/2026 | RSBU - Building Final | Passed |