Inspection Status: Not Applicable
Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
| Date |
Description |
Inspector |
Results |
Comments |
| 04/29/2025 |
COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. |
|
Not Applicable |
Duplicate inspection. 4/25/2025 |
| 11/07/2023 |
COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. |
|
Re-inspection required |
Not ready. Provide DWV TEST. Pex not under pressure and completed. Electrical not per plan. In brick wall electrical lines need to be in conduit. Too many issues stopped inspection. 11/7/2023 |
| 12/08/2023 |
COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. |
|
Re-inspection required |
Not ready minimum 4 receptacles per bedroom. Provide the proper size wire for electrical. All metal boxes do not have ground screws. Add smoke detector in the hallway east of living room. Per future island needs to receptacles per plan. Missing under ground conduit. Bedrooms missing windows. Revise plans as built. DWV lines are dry. 12/8/2023 |
| 12/12/2023 |
COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. |
|
Re-inspection required |
12/12/23: fire foam all top plate penetrations. Stud shoe needed for over size notches in studs. Receptacles for wall mount tvs need to have boxes installed. All shower pans need to be under test. |
| 12/13/2023 |
COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. |
|
Passed |
12/13/2023 revision in process. Proceeding at your own risk. |