Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Commercial Building
Address:
2130 N ORACLE RD
Address NEW:
2130 N ORACLE RD
Apply Date:
07/26/2022
Applicant:
Carlos Flores
Description:
TI: Night Club

Permit Reviews

Permit Number - T22CM05678
Permit Status: Complete
Permit Description: TI: Night Club
Start Date Submittal Complete Date Status  
07/26/2022 COMMERCIAL - BLDG/FIRE/ZONING/ENG 09/08/2022 COMPLETED Review Details
05/09/2024 RESTAMP - COMMERCIAL v.1 05/09/2024 APPROVED Review Details
01/29/2025 COMMERCIAL REVIEW - FULL v.1 01/30/2025 APPROVED Review Details
05/29/2025 COMMERCIAL REVIEW - FULL REVISION v.1 06/06/2025 APPROVED Review Details
04/01/2024 COMMERCIAL REVIEW - FULL v.3 05/09/2024 APPROVED Review Details
07/30/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 07/30/2025 REQUIRES RESUBMIT Review Details
08/18/2023 COMMERCIAL REVIEW - FULL v.1 08/18/2023 REQUIRES RESUBMIT Review Details
04/24/2025 COMMERCIAL REVIEW - FULL REVISION v.1 05/13/2025 APPROVED Review Details
01/15/2026 BUILDING DEFERRED SUBMITTAL REVIEW v.1 01/15/2026 REQUIRES RESUBMIT Review Details
02/16/2024 COMMERCIAL REVIEW - FULL v.2 03/19/2024 REQUIRES RESUBMIT Review Details
01/06/2026 BUILDING DEFERRED SUBMITTAL REVIEW v.1 01/09/2026 APPROVED Review Details
01/16/2026 BUILDING DEFERRED SUBMITTAL REVIEW v.2 01/16/2026 APPROVED Review Details
09/02/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.2 09/03/2025 APPROVED Review Details

Conditions

Permit Number - T22CM05678
Permit Status: Complete
Permit Description: TI: Night Club
Date Description Comments
04/03/2024 AIR BALANCING REPORT IS REQUIRED.
04/03/2024 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.
05/09/2024 Prior to Issuance: This project requires issuance of a Development Package (DP) TD-DEV-0224-00051 permit prior to issuance of this permit. Prior to TCO/Final: This project requires full completion of a Development Package (DP) permit prior to Temporary C of O and/or final completion this permit.
04/03/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
04/03/2024 SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED.
04/03/2024 SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED.
04/03/2024 WATER STERILIZATION REPORT IS REQUIRED.

Outstanding Inspections

Permit Status: Complete
Permit Number: T22CM05678
Permite Description: TI: Night Club
Total Outstanding Inspections - 6
Last Inspection Date Description Inspector Results Comments
06/23/2025 COT - HCBU - Interior Shear Bracing N/A Not Applicable
06/23/2025 COT - BULD - SWG Clearance N/A Not Applicable
04/16/2025 COT - HCBU - Building Progress N/A Partial Pass Partial pass. Footings and reinforcement per plan for new mechanical unit support structure. Okay for concrete placement. 4/16/2025
08/22/2025 BULD - Electrical Clearance N/A Not Applicable
08/22/2025 COT - HCEL - Electrical Progress N/A Not Applicable
09/02/2025 ENGR Engineering Final N/A Not Ready Contractor’s intended scope of site-work is 2 concrete ADA 9’ parking spaces with a 9’ access aisle in the middle at the SW entrance and a concrete 6’ x 11.5’ slab at N exit at Rillito west of mechanical area. Screen wall at mechanical area is now expanded metal cage over existing pony wall.
This is in conflict with the approved plans. Should a scope of work change be requested, a revision will need to be submitted, or an As-Built with the approval of Site Zoning, Engineering, ROW, and landscaping.
Call in final inspections when ready.

Completed Inspections

Permit Status: Complete
Permit Number: T22CM05678
Permit Description: TI: Night Club
Total Completed Inspections - 19
Date Description Inspector Results Comments
05/29/2025 COT - HCBU - Framing Passed
05/29/2025 COT - HCPL - Plumbing Intermediate Passed
07/08/2025 COT - HCEL - Electrical Intermediate Passed
07/08/2025 COT - HCME - Mechanical Intermediate Passed
07/08/2025 COT - HCPL - Plumbing Progress Passed
07/08/2025 COT - HCPL - Rough Soil Passed
07/08/2025 COT - HCME - Mechanical Progress Passed
07/08/2025 COT - HCPL - Plumbing Above Ceiling Passed
07/08/2025 COT - HCBU - Building Progress Passed Framing is complete; Ok to,insulate and sheet rock throughout.
09/02/2025 TRSP - ROW - Final/Close-Out Passed
09/17/2025 COT - FCON - Sprinkler - Final Passed
09/18/2025 COT - HCBU - Building Final Passed
09/18/2025 COT - HCEL - Electrical Above Ceiling Passed
09/18/2025 COT - HCEL - Electrical Final Passed
09/18/2025 COT - HCME - Mechanical Above Ceiling Passed
09/18/2025 COT - HCME - Mechanical Final Passed
09/18/2025 COT - HCPL - Plumbing Final Passed
12/30/2025 COT - FCON - Alarm - Final Passed
12/30/2025 COT - FCON - Fire - Final Passed

Documents

File Name Document Type  
COFO_FINALCOFO_COMMERCIAL (SSRS).PDF DOCUMENTS VIEW
CURVES CABARET - TAB REPORT_V1.PDF DOCUMENTS VIEW
INNOVATIVE TECHNOLOGY - CURVES CABARET LAB RESULTS-2026-01-05_V1.PDF DOCUMENTS VIEW
250902_SPECIAL INSPECTION CERTIFICATE_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-250528_2130 N. ORACLE_TI_DELTA 7_V1.PDF DOCUMENTS VIEW
250421_RESPONSE LETTER_DELTA 5_V1.PDF DOCUMENTS VIEW
CONS-2130 N. ORACLE_TI_DELTA 5_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-REV PLANS_V1.PDF DOCUMENTS VIEW
EDG WEST NARRATIVE-REV4_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CONS-3_PLAN SET_V2.PDF DOCUMENTS VIEW
CONS-3_PLAN SET_V2.PDF DOCUMENTS VIEW