Inspection History Details
Inspection Status: Not Ready
Inspection History: ENGR Engineering Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/02/2025 | ENGR Engineering Final | Not Ready | Contractor’s intended scope of site-work is 2 concrete ADA 9’ parking spaces with a 9’ access aisle in the middle at the SW entrance and a concrete 6’ x 11.5’ slab at N exit at Rillito west of mechanical area. Screen wall at mechanical area is now expanded metal cage over existing pony wall. This is in conflict with the approved plans. Should a scope of work change be requested, a revision will need to be submitted, or an As-Built with the approval of Site Zoning, Engineering, ROW, and landscaping. Call in final inspections when ready. |
|
| 09/18/2025 | ENGR Engineering Final | Partial Pass | The handicap parking sign is at the wrong height. You need to raise it so the bottom is at 7 foot. There’s a change order out on the Rillito rd.side that needs to be approved | |
| 09/19/2025 | ENGR Engineering Final | Passed |