Permit Review Detail
Review Status: Requires Resubmit
Review Details: BUILDING DEFERRED SUBMITTAL REVIEW v.1
Permit Number - T22CM05678
Review Name: BUILDING DEFERRED SUBMITTAL REVIEW v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 01/15/2026 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 01/15/2026 | Special Inspection Certificate Review (Deferred Submittal) Express | REQUIRES RESUBMIT | The memo from Grenier Engineering on the removal or epoxy anchor condition must be stamped/sealed by the engineer. Please resubmit with the registrant's stamp. | ||
| 01/15/2026 | PDSD Application Completeness Express | REVIEW COMPLETED |