Permit: T22CM03945
Permit Details
Status:
Complete
Type:
Commercial Building
Address:
4785 E VALENCIA RD
Address NEW:
4785 E VALENCIA RD
Apply Date:
05/24/2022
Applicant:
Description:
New Retail & Warehouse building
Permit Reviews
Permit Number - T22CM03945
Permit Status: Complete
Permit Description: New Retail & Warehouse building
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 05/24/2022 | COMMERCIAL - BLDG/FIRE/ZONING/ENG | 07/07/2022 | COMPLETED |
| 08/21/2023 | COMMERCIAL REVIEW - FULL v.4 | 08/31/2023 | APPROVED |
| 12/18/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 12/19/2024 | REQUIRES RESUBMIT |
| 08/31/2023 | RESTAMP - COMMERCIAL v.1 | 09/07/2023 | APPROVED |
| 12/26/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.3 | 12/30/2024 | APPROVED |
| 12/23/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 12/23/2024 | REQUIRES RESUBMIT |
| 11/07/2022 | COMMERCIAL REVIEW - FULL v.1 | 12/14/2022 | REQUIRES RESUBMIT |
| 04/20/2023 | COMMERCIAL REVIEW - FULL v.2 | 05/16/2023 | REQUIRES RESUBMIT |
| 06/24/2023 | COMMERCIAL REVIEW - FULL v.3 | 07/07/2023 | REQUIRES RESUBMIT |
| 03/11/2024 | COMMERCIAL REVIEW - FULL v.1 | 03/14/2024 | APPROVED |
Conditions
Permit Number - T22CM03945
Permit Status: Complete
Permit Description: New Retail & Warehouse building
| Date | Description | Comments |
|---|---|---|
| 05/07/2024 | AIR BALANCING REPORT IS REQUIRED. | |
| 05/07/2024 | SPECIAL INSPECTION FOR BOLTS INSTALLED IN CONCRETE IS REQUIRED. | |
| 05/07/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
| 05/07/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
| 05/07/2024 | SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED. | |
| 05/07/2024 | SPECIAL INSPECTION FOR HIGH STRENGTH BOLTING IS REQUIRED. | |
| 12/18/2024 | Masonry Inspection Report submittal review is required. | |
| 12/18/2024 | SPECIAL INSPECTION FOR REINFORCING STEEL AND/OR PRE-STRESSING TENDONS IS REQUIRED. | |
| 03/18/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 03/18/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. | |
| 05/07/2024 | SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED. | |
| 05/07/2024 | SPECIAL INSPECTION FOR STRUCTURAL WELDING IS REQUIRED. | |
| 05/07/2024 | WATER STERILIZATION REPORT IS REQUIRED. |
Outstanding Inspections
Permit Status: Complete
Permit Number: T22CM03945
Permite Description: New Retail & Warehouse building
Total Outstanding Inspections - 16
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/18/2024 | COT - HCBU - Excavation/Rebar/Zoning | N/A | Partial Pass | 3/5/24 partial approval or site fence wall southside approximately 500 feet from south east corner, OK to place concrete for footer 3/7/24 next 500' to entry road 3/18/24: north 6' screen wall 500' approved by special inspector. |
| 05/03/2024 | COT - HCPL - Plumbing Progress | N/A | Partial Pass | 2/6/24: plumbing underground per plan and under test ok to backfill. 5/3/24: sewer tap passed. Ok to backfill. shading required |
| 02/20/2024 | BULD - Electrical Clearance | N/A | Partial Pass | 2/20/24: passed by Ricky on 2/19/24. 2/23/24 TMPP CLEARANCE RESENT TO TEP |
| 08/16/2024 | COT - HCBU - Building Above Ceiling | N/A | Partial Pass | Corrections were made for room #110. Okay to proceed progress areas. 8/16/2024 |
| 05/30/2024 | COT - HCBU - Building Progress | N/A | Partial Pass | 4/12/24: 500' of CMU Stem wall, screen wall on south side of project approved by third party inspector. 0-2' AFF. 4/16/24: 446' of CMU Screen wall south side of project. 0-3' AFF. Approved by third party inspector. 4/17/24: 216' of CMU Screen wall south side of project reinforcement per plan ok to grout and cap. 216' of CMU Stem wall west side of project reinforcement per plan ok to grout. Partial approval from HCS to approximately 60% of distance to building OK to cover 4/22/24: partial approval from HCS to 75% of distance to building ok to cover. 4/25/24: west site wall 0'-84' south and 0'-108' north of sw opening, 108'-240' North of opening. 4/30/24: Partial approval for underground fiber to 2 1/2 inch conduit from pole box to front of building and 4 inch to from same location to first curb to the west 4/30/24: south side wall east of job entrance 0-4' AFF. CMU wall 5/2/24: north east wall at site entrance 0-4' AFF ok to grout, south east wall at site entrance ok to top out. 5/13/24: no inspection needed. 5/30/24: 2" pvc main from south west corner of building to 180' west of building pending point of connection at backflow preventer. Ok to backfill. Shading required |
| 05/03/2024 | COT - HCBU - Roof Nailing | N/A | Partial Pass | 4/24/24: roof nailing on east and west sides of office sheathing fastened per plan ok to proceed. 5/3/24: roof nailing on southside of office sheathing passed. Ok to proceed |
| 12/02/2024 | COT - HCEL - Electrical Final | N/A | Partial Pass | 12/2/24: exterior receptacles must be WR GFCI, exhaust fan in office bathroom no power, GFCI required at break room outlets, dishwasher must be properly installed/supported, overflow switch required at air handlers, supports at water heater copper pipes must be coated, Bathroom signage must be installed at time of inspection, condenser unit tripped breaker multiple times during inspection. OK FOR LEVEL 2 TCO. |
| 07/22/2024 | COT - HCEL - Electrical Underground | N/A | Not Ready | 7/22/24: not ready |
| 12/02/2024 | COT - HCME - Mechanical Final | N/A | Partial Pass | 12/2/24: exterior receptacles must be WR GFCI, exhaust fan in office bathroom no power, GFCI required at break room outlets, dishwasher must be properly installed/supported, overflow switch required at air handlers, supports at water heater copper pipes must be coated, Bathroom signage must be installed at time of inspection, condenser unit tripped breaker multiple times during inspection. OK FOR LEVEL 2 TCO. |
| 05/03/2024 | COT - HCME - Mechanical Intermediate | N/A | Partial Pass | 5/3/24: mechanical intermediate passed. Pending drops to registers. |
| 12/02/2024 | COT - HCPL - Plumbing Final | N/A | Partial Pass | 12/2/24: exterior receptacles must be WR GFCI, exhaust fan in office bathroom no power, GFCI required at break room outlets, dishwasher must be properly installed/supported, overflow switch required at air handlers, supports at water heater copper pipes must be coated, Bathroom signage must be installed at time of inspection, condenser unit tripped breaker multiple times during inspection. OK FOR LEVEL 2 TCO. |
| 05/01/2024 | COT - HCPL - Plumbing Intermediate | N/A | Partial Pass | 5/1/24: plumbing in wall at office area passed. Ok to proceed. |
| 02/06/2024 | COT - HCPL - Rough Soil | N/A | Partial Pass | 2/6/24: plumbing underground per plan and under test ok to backfill. Sewer connection pending |
| 11/27/2024 | COT - FCON - Fire - Final | N/A | Partial Pass | Approved for TCO level 2. Shall provide Knox gate key switch. Magnetic doors shall be tied into alarm. FDC locking caps and Knoxbox. |
| 06/17/2024 | COT - HCEL - Electrical Intermediate | N/A | Partial Pass | 6/17/24: Ufer ground good to go. Partial-pass. Ok to proceed. |
| 12/02/2024 | COT - HCBU - Building Final | N/A | Partial Pass | 12/2/24: exterior receptacles must be WR GFCI, exhaust fan in office bathroom no power, GFCI required at break room outlets, dishwasher must be properly installed/supported, overflow switch required at air handlers, supports at water heater copper pipes must be coated, Bathroom signage must be installed at time of inspection, condenser unit tripped breaker multiple times during inspection. OK FOR LEVEL 2 TCO. |
Completed Inspections
Permit Status: Complete
Permit Number: T22CM03945
Permit Description: New Retail & Warehouse building
Total Completed Inspections - 32
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/16/2024 | COT - HCEL - Electrical Progress | Passed | ||
| 02/26/2024 | COT - HCBU - Preslab | Passed | ||
| 04/26/2024 | COT - HCPL - Sewer | Passed | Partial approval from HCS to approximately 60% of distance to building OK to cover 4/22/24: partial approval from HCS to 75% of distance to building ok to cover. 4/26/24: Sewer connection complete and under test ok to backfill. |
|
| 05/09/2024 | COT - HCBU - Framing | Passed | ||
| 05/22/2024 | COT - HCBU - Firewall/Fire Barrier/Firestop | Passed | 5/9/24: not ready 5/16/24: fire wall passed on north exterior wall on demising wall between office area and warehouse. Pending north interior wall of office demising wall. 5/22/24: fire wall passed ok to tape and mud. |
|
| 11/12/2024 | BULD - Electrical Clearance | Passed | 2/20/24: passed by Ricky on 2/19/24. 11/12/24: ECO TEP CLEARANCE AT 4758 E VALENCIA RD. |
|
| 11/27/2024 | COT - FCON - Sprinkler - Final | Passed | ||
| 12/13/2024 | COT - HCBU - Building Above Ceiling | Passed | ||
| 12/13/2024 | COT - HCBU - Building Progress | Passed | ||
| 12/13/2024 | COT - HCBU - Exterior Clips/Sheathing | Passed | ||
| 12/13/2024 | COT - HCBU - Interior Shear Bracing | Passed | ||
| 12/13/2024 | COT - HCBU - Roof Nailing | Passed | ||
| 12/13/2024 | COT - HCEL - Electrical Above Ceiling | Passed | ||
| 12/13/2024 | COT - HCEL - Electrical Final | Passed | ||
| 12/13/2024 | COT - HCEL - Electrical Underground | Passed | ||
| 12/13/2024 | COT - HCEL - Outdoor Lighting | Passed | ||
| 12/13/2024 | COT - HCME - Mechanical Above Ceiling | Passed | ||
| 12/13/2024 | COT - HCME - Mechanical Final | Passed | ||
| 12/13/2024 | COT - HCME - Mechanical Intermediate | Passed | ||
| 12/13/2024 | COT - HCME - Mechanical Underground | Passed | ||
| 12/13/2024 | COT - HCPL - Backwater Valve | Passed | ||
| 12/13/2024 | COT - HCPL - Plumbing Above Ceiling | Passed | ||
| 12/13/2024 | COT - HCPL - Plumbing Final | Passed | ||
| 12/13/2024 | COT - HCPL - Plumbing Intermediate | Passed | ||
| 12/13/2024 | COT - HCPL - Rough Soil | Passed | ||
| 12/13/2024 | COT - FCON - Fire - Final | Passed | ||
| 12/13/2024 | COT - FCON - Alarm - Final | Passed | ||
| 12/19/2024 | COT - HCEL - Electrical Intermediate | Passed | ||
| 12/19/2024 | COT - HCME - Mechanical Progress | Passed | ||
| 01/08/2025 | ENGR Engineering Final | Passed | Building complete. Development Package still open and needs final inspections. | |
| 01/08/2025 | COT - HCBU - Building Final | Passed | 12/2/24: exterior receptacles must be WR GFCI, exhaust fan in office bathroom no power, GFCI required at break room outlets, dishwasher must be properly installed/supported, overflow switch required at air handlers, supports at water heater copper pipes must be coated, Bathroom signage must be installed at time of inspection, condenser unit tripped breaker multiple times during inspection. OK FOR LEVEL 2 TCO. 12/13/24: corrections have been made. Pending conditions. 12/20/24: ok for level 4 TCO 1/8/25:Building complete. Development Package still open and needs final inspections. |
|
| 01/29/2025 | SITE - Zoning Final | Passed |