Inspection Status: Passed
Inspection History: COT - HCEL - Electrical Underground
Permit Number - T22CM03945
Inspection Description - COT - HCEL - Electrical Underground
Inspection Status - Passed
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
02/01/2024 | COT - HCEL - Electrical Underground | Passed | ||
02/27/2024 | COT - HCEL - Electrical Underground | Partial Pass | Partial for underground electrical conduits from the rear of building to the warehouse entry gate and the 2 front parking lot light poles | |
03/05/2024 | COT - HCEL - Electrical Underground | Partial Pass | ||
03/13/2024 | COT - HCEL - Electrical Underground | Partial Pass | ||
COT - HCEL - Electrical Underground | Partial Pass | 2/27/24 - Partial for underground electrical conduits from the rear of building to the warehouse entry gate and the 2 front parking lot light poles 3/5/24 partial for secondaries, approximately 20 feet from proposed transformer site to building risers OK the shade and cover two conduits 3/13/24 partial approval for underground for monument sign to first light pole to the east OK to cover 3/18/24: partial approval for underground electrical for west end monument sign. Pending 400' stretch to building. |
||
COT - HCEL - Electrical Underground | Partial Pass | 2/27/24 - Partial for underground electrical conduits from the rear of building to the warehouse entry gate and the 2 front parking lot light poles 3/5/24 partial for secondaries, approximately 20 feet from proposed transformer site to building risers OK the shade and cover two conduits 3/13/24 partial approval for underground for monument sign to first light pole to the east OK to cover 3/18/24: partial approval for underground electrical for west end monument sign. Pending 400' stretch to building. 4/25/24:secondaries complete to transformer location ok to backfill. Primary conduit ok to backfill from transformer to south west corner of job site. |
||
05/01/2024 | COT - HCEL - Electrical Underground | Partial Pass | 2/27/24 - Partial for underground electrical conduits from the rear of building to the warehouse entry gate and the 2 front parking lot light poles 3/5/24 partial for secondaries, approximately 20 feet from proposed transformer site to building risers OK the shade and cover two conduits 3/13/24 partial approval for underground for monument sign to first light pole to the east OK to cover 3/18/24: partial approval for underground electrical for west end monument sign. Pending 400' stretch to building. 4/25/24:secondaries complete to transformer location ok to backfill. Primary conduit ok to backfill from transformer to south west corner of job site. 5/1/24: Partial approval for underground fiber to 2 1/2 inch conduit from pole box to front of building and 4 inch to from same location to first curb to the west |
|
05/03/2024 | COT - HCEL - Electrical Underground | Partial Pass | 2/27/24 - Partial for underground electrical conduits from the rear of building to the warehouse entry gate and the 2 front parking lot light poles 3/5/24 partial for secondaries, approximately 20 feet from proposed transformer site to building risers OK the shade and cover two conduits 3/13/24 partial approval for underground for monument sign to first light pole to the east OK to cover 3/18/24: partial approval for underground electrical for west end monument sign. Pending 400' stretch to building. 4/25/24:secondaries complete to transformer location ok to backfill. Primary conduit ok to backfill from transformer to south west corner of job site. 5/1/24: Partial approval for underground fiber to 2 1/2 inch conduit from pole box to front of building and 4 inch to from same location to first curb to the west 5/3/24: underground electrical to monument sign complete ok to backfill. |
|
05/28/2024 | COT - HCEL - Electrical Underground | Partial Pass | 2/27/24 - Partial for underground electrical conduits from the rear of building to the warehouse entry gate and the 2 front parking lot light poles 3/5/24 partial for secondaries, approximately 20 feet from proposed transformer site to building risers OK the shade and cover two conduits 3/13/24 partial approval for underground for monument sign to first light pole to the east OK to cover 3/18/24: partial approval for underground electrical for west end monument sign. Pending 400' stretch to building. 4/25/24:secondaries complete to transformer location ok to backfill. Primary conduit ok to backfill from transformer to south west corner of job site. 5/1/24: Partial approval for underground fiber to 2 1/2 inch conduit from pole box to front of building and 4 inch to from same location to first curb to the west 5/3/24: underground electrical to monument sign complete ok to backfill. 5/28/24: electrical underground for communication (1)4" from building south west corner to north west corner of construction site. Ok to backfill. |
|
05/30/2024 | COT - HCEL - Electrical Underground | Partial Pass | 2/27/24 - Partial for underground electrical conduits from the rear of building to the warehouse entry gate and the 2 front parking lot light poles 3/5/24 partial for secondaries, approximately 20 feet from proposed transformer site to building risers OK the shade and cover two conduits 3/13/24 partial approval for underground for monument sign to first light pole to the east OK to cover 3/18/24: partial approval for underground electrical for west end monument sign. Pending 400' stretch to building. 4/25/24:secondaries complete to transformer location ok to backfill. Primary conduit ok to backfill from transformer to south west corner of job site. 5/1/24: Partial approval for underground fiber to 2 1/2 inch conduit from pole box to front of building and 4 inch to from same location to first curb to the west 5/3/24: underground electrical to monument sign complete ok to backfill. 5/28/24: electrical underground for communication (1)4" from building south west corner to north west corner of construction site. Ok to backfill. 5/30/24: electrical underground for communication (1)4" from north west corner of construction site to first column at CMU wall at north west side of project site ok to backfill progress areas. Shading required |
|
06/04/2024 | COT - HCEL - Electrical Underground | Partial Pass | 2/27/24 - Partial for underground electrical conduits from the rear of building to the warehouse entry gate and the 2 front parking lot light poles 3/5/24 partial for secondaries, approximately 20 feet from proposed transformer site to building risers OK the shade and cover two conduits 3/13/24 partial approval for underground for monument sign to first light pole to the east OK to cover 3/18/24: partial approval for underground electrical for west end monument sign. Pending 400' stretch to building. 4/25/24:secondaries complete to transformer location ok to backfill. Primary conduit ok to backfill from transformer to south west corner of job site. 5/1/24: Partial approval for underground fiber to 2 1/2 inch conduit from pole box to front of building and 4 inch to from same location to first curb to the west 5/3/24: underground electrical to monument sign complete ok to backfill. 5/28/24: electrical underground for communication (1)4" from building south west corner to north west corner of construction site. Ok to backfill. 5/30/24: electrical underground for communication (1)4" from north west corner of construction site to first column at CMU wall at north west side of project site ok to backfill progress areas. Shading required 6/4/24: (1)4" from southwest corner of CMU wall to north west corner of CMU wall. Ok to backfill progress areas. Ok to continue to exact communication box |
|
06/18/2024 | COT - HCEL - Electrical Underground | Partial Pass | 6/18/2024. Looked at G.E.C at southeast corner. | |
07/22/2024 | COT - HCEL - Electrical Underground | Not Ready | 7/22/24: not ready | |
07/23/2024 | COT - HCEL - Electrical Underground | Not Ready | 7/23/2024 provide 48" to the top of pipe. | |
07/25/2024 | COT - HCEL - Electrical Underground | Partial Pass | X1 4” conduit schedule 40. At 48” depth. Spare primary (J2) for TEP approximately 250’ stubbed out of site wall and just passed the property line on the north end. Okay to backfill progress areas. Shading required. 7/25/2024 | |
07/30/2024 | COT - HCEL - Electrical Underground | Partial Pass | Stubbed out from site wall approximately 50’ to J2 Box. From J2 to entry of property pipe was moved 10’ east from steak. Out of easement. Per TEP requirements. Okay to backfill progress areas. Shading required. 7/30/2024 | |
08/27/2024 | COT - HCEL - Electrical Underground | Partial Pass | From J2 box about 420’ to transformer (VBC 3 ) across trash enclosure at circle K. All bored at 55”. 8/27/2024 | |
12/13/2024 | COT - HCEL - Electrical Underground | Passed |