Permit Details

Status:
Complete
Type:
Commercial Building
Apply Date:
01/26/2022
Applicant:
James Ericksen
Description:
Shell & superstructure package for hospital

Permit Reviews

Permit Number - T22CM00621
Permit Status: Complete
Permit Description: Shell & superstructure package for hospital
Start Date Submittal Complete Date Status  
01/26/2022 COMMERCIAL - BLDG/FIRE/ZONING/ENG 03/16/2022 COMPLETED Review Details
04/11/2022 RESUBMITTAL 05/24/2022 COMPLETED Review Details
05/31/2022 RESUBMITTAL 06/20/2022 COMPLETED Review Details
06/28/2022 RESUBMITTAL 07/05/2022 COMPLETED Review Details
08/24/2022 REVISION - - 1ST 09/23/2022 COMPLETED Review Details
11/22/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.1 11/28/2023 APPROVED Review Details

Conditions

Permit Number - T22CM00621
Permit Status: Complete
Permit Description: Shell & superstructure package for hospital
Date Description Comments
06/06/2022 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.
06/06/2022 SPECIAL INSPECTION FOR CONCRETE IS REQUIRED..
06/06/2022 SPECIAL INSPECTION FOR BOLTS INSTALLED IN CONCRETE IS REQUIRED.
06/06/2022 SPECIAL INSPECTION FOR SPECIAL MOMENT-RESISTING CONCRETE FRAME IS REQUIRED.
06/06/2022 SPECIAL INSPECTION FOR REINFORCING STEEL AND/OR PRE-STRESSING TENDONS IS REQUIRED.
06/06/2022 SPECIAL INSPECTION FOR STRUCTURAL WELDING IS REQUIRED.
06/06/2022 SPECIAL INSPECTION FOR HIGH STRENGTH BOLTING IS REQUIRED.
06/06/2022 SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED.
06/06/2022 SPECIAL INSPECTION FOR FOUNDATION/EXCAVATION IS REQUIRED.
06/06/2022 SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED.
06/06/2022 SPECIAL INSPECTION FOR SHOTCRETE IS REQUIRED.
06/06/2022 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
06/06/2022 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
06/06/2022 SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED.
06/29/2022 This building permit approval is without public sewer connection review or approval. It is strictly the responsibility of the owner and/or person doing the work to ensure that the appropriate review and approval to connect is obtained from Regional Wastewater Reclamation Department (RWRD) wastewater provider or Pima County DEQ approval of/and alternative disposal system. It is required that owner and/or person doing the work solicit all requisite approvals from the wastewater provider prior to obtaining this building construction permit. RWRD connection information is available at www.pima.gov/wwm/developer.htm
06/29/2022 PIMA COUNTY WASTEWATER SIGN OFF REQUIRED PRIOR TO ISSUANCE OF FINAL STATUS.

Outstanding Inspections

Permit Status: Complete
Permit Number: T22CM00621
Permite Description: Shell & superstructure package for hospital
Total Outstanding Inspections - 8
Last Inspection Date Description Inspector Results Comments
10/26/2022 COT - HCEL - Electrical Final N/A Not Ready
02/08/2023 COT - HCEL - Electrical Progress N/A Partial Pass Level #3, grounding system from transformers to level #3.
10/26/2022 COT - HCPL - Plumbing Final N/A Not Ready
COT - FCON - Underground Flush N/A Not Ready
10/26/2022 FCON – OH Piping & Hydro N/A Not Ready
10/26/2022 COT - FCON - Hood System - Final N/A Not Ready
10/26/2022 COT - FCON - Sprinkler - Final N/A Not Ready
10/26/2022 COT - FCON - Alarm - Final N/A Not Ready

Completed Inspections

Permit Status: Complete
Permit Number: T22CM00621
Permit Description: Shell & superstructure package for hospital
Total Completed Inspections - 24
Date Description Inspector Results Comments
10/26/2022 COT - HCBU - Sustainability Passed N/A
10/26/2022 COT - HCEL - Electrical Intermediate Passed See permit number T22CM02751
10/26/2022 COT - HCBU - Exterior Clips/Sheathing Passed See permit number T22CM02751
10/26/2022 COT - HCBU - Building Final Passed See permit number T22CM02751
10/26/2022 COT - HCBU - Roof Nailing Passed See permit number T22CM02751
11/17/2022 COT - HCPL - Rough Soil Passed Level #2, metal decking; puddle welded and pinned. Ok to place concrete in progress areas. See permit number T22CM02751
12/01/2022 BULD - Electrical Clearance Passed temporary power. The TEP clearance code is TMPP
01/30/2023 COT - FCON - Underground Pressure Passed
02/16/2023 COT - HCEL - Outdoor Lighting Passed See permit number T22CM02751
03/20/2023 COT - HCPL - Plumbing Roof Drains Passed Waste and vent lines (1 1/2” - 4”) in area C North and South; Area D South. See permit number T22CM02751
03/22/2023 COT - HCEL - Electrical Underground Passed Four each 4” conduits and 1 each 1 1/4” conduit (camera line) from main building area to vault at West side (75’). Ok to cover progress areas. See permit number T22CM02751
04/24/2023 COT - HCBU - Framing Passed Exterior walls from Levels 2 through Level #4 on East esterior side of building. Ok to cover progress areas. See permit number T22CM02751
04/26/2023 COT - HCBU - Preslab Passed West stairwell, treads and landings at Level #4 - Level #3. Ok to place concrete in progress areas. See permit number T22CM02751
05/19/2023 COT - HCBU - Stem Wall/Retaining Wall Passed Retaining/site wall footing at Southwest area and West area: approximately 180 feet. Ok to place concrete in progress areas.
08/08/2023 COT - HCBU - Excavation/Rebar/Zoning Passed Retaining wall footing for 2’ - 4’ high wall at Southwest portion of building (approximately 40’). Ok to place concrete in progress areas. Monument sign footing at Southwest corner of sight(underground electric conduits are in place). Ok to place concrete in progress area.
09/19/2023 COT - HCBU - Building Above Ceiling Passed See permit number T22CM02751
09/19/2023 COT - HCBU - Building Progress Passed See permit number T22CM02751
01/02/2024 COT - HCPL - Plumbing Final Passed
01/03/2024 COT - FCON - Underground Flush Passed
01/10/2024 FCON – OH Piping & Hydro Passed
01/10/2024 COT - FCON - Fire - Final Passed
01/10/2024 COT - FCON - Hood System - Final Passed
01/10/2024 COT - FCON - Sprinkler - Final Passed
01/10/2024 COT - FCON - Alarm - Final Passed

Documents

File Name Document Type  
LOFC_LETTEROFCOMPLETION.PDF DOCUMENTS VIEW
FINAL SIC-2023-11-22_V1.PDF DOCUMENTS VIEW
STRUCTURAL CALCS.PDF DOCUMENTS VIEW
PLAN SET_PART1.PDF CONSTRPLANS VIEW
PLAN SET_PART2.PDF CONSTRPLANS VIEW
STRUCTURAL PACKAGE.PDF DOCUMENTS VIEW
REV1_CALCULATIONS.PDF DOCUMENTS VIEW
REV1_STRUCTURAL CALCULATIONS.PDF DOCUMENTS VIEW
REV1_PLAN SET.PDF CONSTRPLANS VIEW
ENERGY FORM.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
JOB CARD.PDF DOCUMENTS VIEW