Inspection History Details
Inspection Status: Not Ready
Inspection History: COT - HCEL - Electrical Underground
Permit Number - T22CM00621
Inspection Description - COT - HCEL - Electrical Underground
Inspection Status - Not Ready
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/26/2022 | COT - HCEL - Electrical Underground | Not Ready | ||
03/16/2023 | COT - HCEL - Electrical Underground | Partial Pass | One inch conduit for three pole lights: approximately 300’, Ok to cover progress area. | |
03/22/2023 | COT - HCEL - Electrical Underground | Passed | Four each 4” conduits and 1 each 1 1/4” conduit (camera line) from main building area to vault at West side (75’). Ok to cover progress areas. See permit number T22CM02751 | |
11/01/2022 | COT - HCEL - Electrical Underground | Partial Pass | Electric conduits from Solar canopy to building electric room. Conduits: 11 @ 1”; 2 @ 2”; 1 @ 1 1/4”. Ok to cover progress areas. | |
11/15/2022 | COT - HCEL - Electrical Underground | Partial Pass | Footing and mechanical equipment pads. Ok to place concrete in progress areas |