Inspection Status: Not Ready
Inspection History: COT - HCEL - Electrical Underground
| Date |
Description |
Inspector |
Results |
Comments |
| 10/26/2022 |
COT - HCEL - Electrical Underground |
|
Not Ready |
|
| 03/16/2023 |
COT - HCEL - Electrical Underground |
|
Partial Pass |
One inch conduit for three pole lights: approximately 300’, Ok to cover progress area. |
| 03/22/2023 |
COT - HCEL - Electrical Underground |
|
Passed |
Four each 4” conduits and 1 each 1 1/4” conduit (camera line) from main building area to vault at West side (75’). Ok to cover progress areas. See permit number T22CM02751 |
| 11/01/2022 |
COT - HCEL - Electrical Underground |
|
Partial Pass |
Electric conduits from Solar canopy to building electric room. Conduits: 11 @ 1”; 2 @ 2”; 1 @ 1 1/4”. Ok to cover progress areas. |
| 11/15/2022 |
COT - HCEL - Electrical Underground |
|
Partial Pass |
Footing and mechanical equipment pads. Ok to place concrete in progress areas |