Permit Details

Status:
Expired
Type:
Residential Building - One or Two Family
Address NEW:
2075 W DREXEL RD 2
Apply Date:
08/26/2021
Applicant:
Armando Armijo
Description:
ADU

Permit Reviews

Permit Number - T21CM06973
Permit Status: Expired
Permit Description: ADU
Start Date Submittal Complete Date Status  
02/23/2022 RESUBMITTAL 03/11/2022 COMPLETED Review Details
04/27/2022 RESUBMITTAL 04/28/2022 COMPLETED Review Details
05/19/2022 RESUBMITTAL 05/24/2022 COMPLETED Review Details
05/31/2022 RESUBMITTAL 06/01/2022 COMPLETED Review Details
07/07/2022 RESUBMITTAL 07/08/2022 COMPLETED Review Details
07/13/2022 RESUBMITTAL 07/21/2022 COMPLETED Review Details
07/22/2022 RESUBMITTAL 07/26/2022 COMPLETED Review Details
08/16/2022 RESUBMITTAL 09/07/2022 COMPLETED Review Details
08/26/2021 RESIDENTIAL - BLDG/ZONING/ENGINE/NPPO 09/27/2021 COMPLETED Review Details
03/20/2023 RESIDENTIAL NEW DWELLING v.1 04/14/2023 APPROVED Review Details
11/07/2022 RESIDENTIAL NEW DWELLING v.1 11/07/2022 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - T21CM06973
Permit Status: Expired
Permit Description: ADU
Total Outstanding Activity Conditions - 2
Date Name
03/05/2026 Submission of the final Elevation Certificate and completion of the Floodplain Use Permit is required PRIOR TO FINALING this permit.
11/18/2021 FINAL ELEVATION CERTIFICATE REQUIRED: AN ORIGINAL FINAL ELEVATION CERTIFICATE SEALED BY A REGISTERED LAND SURVEYOR IS REQ'D. MAIL ELEVATION CERTIFICATE TO: CITY OF TUCSON, PLANNING & DEVELOPMENT SERVICES DEPT, ATTN: LOREN MAKUS, P.O. BOX 27210, TUCSON, AZ 85726-7210 OR DELIVER IT TO THE 1ST FL NORTH SIDE OF 201 N. STONE AVE. THIS CONDITION APPLIES TO ALL FINAL INSPECTIONS (1090, 2090, 3090, 4090) AND SHOULD NOT BE SCHEDULED UNTIL THE ELEVATION CERTIFICATE AND THE CONDITION HAVE BEEN APPROVED. LOREN'S IS 837-4927.

Conditions

Permit Number - T21CM06973
Permit Status: Expired
Permit Description: ADU
Date Description Comments
11/18/2021 SPECIAL INSPECTION IS REQ'D FOR AN ELEVATION CERTIFICATE.THE ELEVATION OF THE FORMED PRE-SLAB MUST BE SUBMITTED ON AN ELEVATION CERTIFICATE AND SEALED BY A REGISTERED LAND SURVEYOR. FAX OR EMAIL ELEVATION CERTIFICATE TO: ATTENTION LOREN MAKUS. FAX: 879-8010, EMAIL: LOREN.MAKUS@TUCSONAZ.GOV. THIS CONDITION APPLIES TO INSPECTION 1015 AND SHOULD NOT BE SCHEDULED UNTIL THE ELEVATION CERTIFICATE AND THE CONDITION HAVE BEEN APPROVED. LOREN'S IS 837-4927.
11/18/2021 FUP T21OT00821 MUST BE PAID BEFORE FINAL INSPECTIONS.
09/07/2022 PIMA COUNTY WASTEWATER SIGN OFF REQUIRED PRIOR TO ISSUANCE

Outstanding Inspections

Permit Status: Expired
Permit Number: T21CM06973
Permite Description: ADU
Total Outstanding Inspections - 7
Last Inspection Date Description Inspector Results Comments
08/17/2022 COT - LCPL - Plumbing Intermediate N/A Canceled {Activity date: 08/17/2022; Status: Not Applicable; Inspector: KEN; Comment: Entered by KKARSEN1 - }
08/17/2022 RSME - Mechanical Progress N/A Canceled {Activity date: 08/17/2022; Status: Not Applicable; Inspector: KEN; Comment: Entered by KKARSEN1 - }
10/27/2022 COT - RSME - Mechanical Final N/A Not Ready
10/27/2022 RSBU - Building Final N/A Not Ready
10/27/2022 COT - RSEL - Outdoor Lighting N/A Not Ready
10/27/2022 COT - RSPL - Plumbing Final N/A Not Ready
10/27/2022 COT - RSEL - Electrical Final N/A Not Ready

Completed Inspections

Permit Status: Expired
Permit Number: T21CM06973
Permit Description: ADU
Total Completed Inspections - 10
Date Description Inspector Results Comments
11/15/2022 COT - RSPL - Rough Soil Passed Approved for unit #2, okay to backfill progress areas
11/30/2022 COT - RSBU - Preslab Passed Approved for ADU, okay for concrete placement
03/07/2023 COT - RSBU - Roof Nailing Passed
05/09/2023 COT - RSPL - Yard Water Line Passed
07/26/2023 COT - LCBU - Framing Passed Rough framing is completed. Okay to insulate and drywall walls.
07/26/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed Mechanical, electrical, and plumbing rough-in is complete. Okay to insulate, drywall, tape, and texture walls.
07/26/2023 COT - RSBU - Excavation/Rebar/Zoning Passed Footings and slabs were poured at the same time. Tony G approved preslab on 11/30/22.
07/26/2023 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed Exterior walls are properly nailed off. Okay to prep for stucco finish.
07/26/2023 COT - RSEL - Electrical Underground Passed Electrical conduit has been ran from power pole to electrical panel on building. TRICO has inspected and approved conduit.
07/26/2023 BULD - Electrical Clearance Passed Electrical conduit has been ran from power pole to electrical panel on building. TRICO has inspected and approved conduit. Okay to energize system.

Documents

File Name Document Type  
200 AMP METER AND PANEL REVISION_V1.PDF DOCUMENTS VIEW
DOC110422-11042022103947_V1.PDF DOCUMENTS VIEW
CANCEL REVISION_V1.PDF DOCUMENTS VIEW
MANUAL J_V1.PDF DOCUMENTS VIEW
MECHANICAL PLAN_V1.PDF DOCUMENTS VIEW
MANUAL D_V1.PDF DOCUMENTS VIEW
CONS-PLAN SET_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW