Permit Details

Status:
Complete
Type:
Commercial Building
Apply Date:
06/17/2021
Applicant:
Description:
HANGAR BAY FACILITY WITH OFFICES AND SHOP SPACE. SINGLE STORY PRE-FABRICATED BUILDING, INSULATED ST

Permit Reviews

Permit Number - T21CM05081
Permit Status: Complete
Permit Description: HANGAR BAY FACILITY WITH OFFICES AND SHOP SPACE. SINGLE STORY PRE-FABRICATED BUILDING, INSULATED ST
Start Date Submittal Complete Date Status  
02/24/2022 REVISION - - 1ST 03/08/2022 COMPLETED Review Details
06/17/2021 COMMERCIAL - BLDG/FIRE/ZONING/ENG 07/29/2021 COMPLETED Review Details
10/07/2021 RESUBMITTAL 10/22/2021 COMPLETED Review Details
11/10/2021 RESUBMITTAL 11/29/2021 COMPLETED Review Details

Outstanding Inspections

Permit Status: Complete
Permit Number: T21CM05081
Permite Description: HANGAR BAY FACILITY WITH OFFICES AND SHOP SPACE. SINGLE STORY PRE-FABRICATED BUILDING, INSULATED ST
Total Outstanding Inspections - 11
Last Inspection Date Description Inspector Results Comments
10/27/2022 COT - LCPL - Plumbing Intermediate N/A Not Ready
10/26/2022 COT - FCON - Sprinkler - Final N/A Not Ready
10/26/2022 COT - FCON - Alarm - Final N/A Not Ready
10/26/2022 COT - LCPL - Plumbing Final N/A Not Ready
10/26/2022 COT - FCON - Fire - Final N/A Not Ready
03/16/2023 COT - LCME - Mechanical Final N/A Partial Pass awaiting air balance report
10/27/2022 COT - LCBU - Framing N/A Not Ready
10/26/2022 COT - LCBU - Excavation/Rebar/Zoning N/A Not Ready
10/26/2022 COT - LCPL - Sewer N/A Not Ready
04/27/2023 COT - LCPL - Plumbing Roof Drains N/A Not Applicable
10/26/2022 COT - LCEL - Outdoor Lighting N/A Not Ready

Completed Inspections

Permit Status: Complete
Permit Number: T21CM05081
Permit Description: HANGAR BAY FACILITY WITH OFFICES AND SHOP SPACE. SINGLE STORY PRE-FABRICATED BUILDING, INSULATED ST
Total Completed Inspections - 35
Date Description Inspector Results Comments
12/27/2021 PDSD Building Division - TEP PM Clearance Passed {Activity date: 12/27/2021; Status: Approved; Inspector: DMUNIZ; Comment: Entered by VVERA1 - CODE TMPP}
03/17/2022 COT - LCBU - Preslab Passed {Activity date: 03/17/2022; Status: Approved; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Approved}
03/18/2022 COT - LCEL - Grounding/Bonding Passed {Activity date: 03/18/2022; Status: Approved; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Approved, Grounding conductor installed and attached to rebar footing.}
04/27/2022 COT - LCPL - Rough Soil Passed {Activity date: 04/27/2022; Status: Approved; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Approved, Oil Interceptor and waste line installed and tested. Ok to backfill.} ; {Activity date: 03/03/2022; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - PARTIAL, Drain, waste, vent & Oil lines under foundation installed and tested ok to backfill progress areas.

} ; {Activity date: 03/01/2022; Status: Partial Approval; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - Partial, rough soil for mens and woman’s restrooms and floor sink at janitors room, okay to backfill progress areas.} ; {Activity date: 02/23/2022; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Partial, rough soil for Uni sex bathroom ok to backfill progress areas.} ; {Activity date: 02/09/2022; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Partial, 4” grease main line installed and tested under foundation for future trench drains ok to backfill progress areas.

} ; {Activity date: 02/08/2022; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Partial, 4” wasteline installed & tested under foundation heading East to West. Inspection required for branch lines at a further time.}
06/13/2022 COT - LCPL - Backwater Valve Passed {Activity date: 06/13/2022; Status: Approved; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Approved}
07/12/2022 COT - LCEL - Electrical Underground Passed {Activity date: 07/12/2022; Status: Approved; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Approved} ; {Activity date: 06/30/2022; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Partial, no inspection required today see previous notes.} ; {Activity date: 04/05/2022; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Partial, underground conduit raceways for future evaporate coolers ok to backfill progress areas.} ; {Activity date: 03/31/2022; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Partial, underground conduits installed for site lighting ok to backfill progress areas.

} ; {Activity date: 03/25/2022; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Partial, underground conduits installed for site lighting ok to backfill progress areas} ; {Activity date: 03/18/2022; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Partial, conduit raceways for site lighting ok to backfill progress areas.} ; {Activity date: 03/14/2022; Status: Partial Approval; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - Partial for exterior communication lines from Gridline 6 heading south toward communication vault, okay to backfill} ; {Activity date: 03/01/2022; Status: Partial Approval; Inspector: TGAUSP; Comment: Entered by NGARCIA3 - Partial, branch lines from electric room to floor box, and from panel H3,L2 to aircraft receptacle, okay to backfill progress areas} ; {Activity date: 02/11/2022; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Partial, branch raceways under foundation ok to proceed with backfill.} ; {Activity date: 02/10/2022; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - PARTIAL, Branch raceways installed under foundation ok to backfill progress area @ Electrical room location.} ; {Activity date: 01/28/2022; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Partial,
2-2 1/2” Raceways installed under foundation from Electrical room location to panels L3, H2 ok to backfill progress areas.} ; {Activity date: 01/26/2022; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Partial, 2-4” Conduits under foundation from SES location to Electrical distribution room ok to backfill progress areas.

}
07/12/2022 COT - HCBU - Interior Shear Bracing Passed {Activity date: 07/12/2022; Status: Approved; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Approved} ; {Activity date: 06/29/2022; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Partial, progress areas ok to proceed.} ; {Activity date: 06/24/2022; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Partial the following rooms ok to tape progress areas (112,120,117,121,116,113).} ; {Activity date: 06/03/2022; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Partial, interior screw inspection for one side top out ok to proceed.
} ; {Activity date: 06/02/2022; Status: Correction Required; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - correction required, install more Sheetrock screws in the field & edges.}
08/12/2022 COT - LCEL - Electrical Progress Passed {Activity date: 08/12/2022; Status: Approved; Inspector: ESTEVENS; Comment: Entered by NGARCIA3 - Approved} ; {Activity date: 06/13/2022; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by VVERA1 - PARTIAL, Electrical in wall inspection from GL 1-4,A-E ok to proceed}
08/12/2022 COT - LCPL - Plumbing Progress Passed {Activity date: 08/12/2022; Status: Approved; Inspector: ESTEVENS; Comment: Entered by NGARCIA3 - Approved}
08/12/2022 COT - LCME - Mechanical Progress Passed {Activity date: 08/12/2022; Status: Approved; Inspector: ESTEVENS; Comment: Entered by NGARCIA3 - Approved}
08/12/2022 COT - LCBU - Building Progress Passed {Activity date: 08/12/2022; Status: Approved; Inspector: ESTEVENS; Comment: Entered by NGARCIA3 - Approved} ; {Activity date: 05/20/2022; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Partial, Structural steel and bolt inspection complete. Ok to proceed with exterior sheathing.}
08/19/2022 COT - BULD - SWG Clearance Passed {Activity date: 08/19/2022; Status: Approved; Inspector: ESTEVENS; Comment: Entered by VVERA1 - CODE}
09/06/2022 COT - LCBU - Building Above Ceiling Passed {Activity date: 09/06/2022; Status: Approved; Inspector: ESTEVENS; Comment: Entered by NGARCIA3 - Approved} ; {Activity date: 07/27/2022; Status: Not ready for Inspection; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Not Ready} ; {Activity date: 07/26/2022; Status: Not ready for Inspection; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Not Ready} ; {Activity date: 07/13/2022; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Partial, hard lid locations ok to proceed with Sheetrock. Mechanical ducts are all sealed and ok to insulate.

}
09/06/2022 COT - LCME - Mechanical Above Ceiling Passed {Activity date: 09/06/2022; Status: Approved; Inspector: ESTEVENS; Comment: Entered by NGARCIA3 - Approved} ; {Activity date: 07/27/2022; Status: Not ready for Inspection; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Not Ready} ; {Activity date: 07/26/2022; Status: Not ready for Inspection; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Not Ready}
09/06/2022 COT - LCPL - Plumbing Above Ceiling Passed {Activity date: 09/06/2022; Status: Approved; Inspector: ESTEVENS; Comment: Entered by NGARCIA3 - Approved} ; {Activity date: 08/19/2022; Status: Denied; Inspector: ESTEVENS; Comment: Entered by VVERA1 - Denied. Not under test.} ; {Activity date: 07/27/2022; Status: Not ready for Inspection; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Not Ready} ; {Activity date: 07/26/2022; Status: Not ready for Inspection; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Not Ready}
09/06/2022 COT - LCEL - Electrical Above Ceiling Passed {Activity date: 09/06/2022; Status: Approved; Inspector: ESTEVENS; Comment: Entered by NGARCIA3 - Approved}
10/18/2022 COT - LCPL - Gas Pressure Test Passed {Activity date: 10/18/2022; Status: Approved; Inspector: ESTEVENS; Comment: Entered by NGARCIA3 - Approved}
10/18/2022 COT - LCBU - Exterior Clips/Sheathing Passed {Activity date: 10/18/2022; Status: Approved; Inspector: ESTEVENS; Comment: Entered by NGARCIA3 - Approved}
10/18/2022 COT - LCBU - Sustainability Passed {Activity date: 10/18/2022; Status: Approved; Inspector: ESTEVENS; Comment: Entered by NGARCIA3 - Approved}
02/10/2023 COT - LCEL - Electrical Intermediate Passed
02/10/2023 BULD - Electrical Clearance Passed
03/08/2023 COT - LCPL - Plumbing Intermediate Passed
03/16/2023 COT - LCEL - Electrical Final Passed
03/24/2023 COT - FCON - Sprinkler - Final Passed
03/24/2023 COT - FCON - Alarm - Final Passed
03/30/2023 COT - LCPL - Plumbing Final Passed
03/30/2023 COT - LCBU - Building Final Passed
04/20/2023 COT - FCON - Fire - Final Passed
04/27/2023 COT - LCME - Mechanical Final Passed
04/27/2023 COT - LCBU - Framing Passed
04/27/2023 COT - LCBU - Excavation/Rebar/Zoning Passed
04/27/2023 COT - LCPL - Sewer Passed
04/27/2023 COT - LCME - Mechanical Intermediate Passed
04/27/2023 COT - LCBU - Roof Nailing Passed
04/27/2023 COT - LCEL - Outdoor Lighting Passed

Documents

File Name Document Type  
COFO_FINALCOFO_COMMERCIAL.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
CHECKLIST.PDF DOCUMENTS VIEW
CONTRACTOR BOND EXCEPTION.PDF DOCUMENTS VIEW
ENERGY COMPLIANCE CERTIFICATES (COMCHECK).PDF DOCUMENTS VIEW
GCL.PDF DOCUMENTS VIEW
GEOTECHNICAL REPORTS.PDF DOCUMENTS VIEW
HVAC LOAD CALCULATIONS.PDF DOCUMENTS VIEW
JOB CARD.PDF DOCUMENTS VIEW
LETTER OF INTENT.PDF DOCUMENTS VIEW
METAL BUILDING LETTER OF CERTIFICATION.PDF DOCUMENTS VIEW
METAL BUILDING PLAN SET.PDF DOCUMENTS VIEW
METAL BUILDING STRUCTURAL CALCULATIONS.PDF DOCUMENTS VIEW
ONE TIME EXEMPT CERT.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
PLAN SET.PDF DOCUMENTS VIEW
SPEC SHEETS VOL 1.PDF DOCUMENTS VIEW
SPEC SHEETS VOL 2.PDF DOCUMENTS VIEW
STRUCTURAL CALCULATIONS.PDF DOCUMENTS VIEW