Permit: T20CM09215
Permit Details
Apply Date:
12/29/2020
Applicant:
Description:
Proposed construction of 229,320 sf shell building and associated site work
Permit Reviews
Permit Number - T20CM09215
Permit Status: Complete
Permit Description: Proposed construction of 229,320 sf shell building and associated site work
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
01/18/2022 | REVISION - - 1ST | 01/31/2022 | COMPLETED |
02/22/2021 | RESUBMITTAL | 03/22/2021 | COMPLETED |
03/30/2021 | RESUBMITTAL | 04/15/2021 | COMPLETED |
04/23/2022 | REVISION - - 2ND | 05/26/2022 | COMPLETED |
06/03/2022 | REVISION - - 2ND | 06/21/2022 | COMPLETED |
09/01/2022 | REVISION - - 2ND | 09/05/2022 | COMPLETED |
12/29/2020 | COMMERCIAL - NEW | 02/04/2021 | COMPLETED |
03/07/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 03/09/2023 | APPROVED |
Conditions
Permit Number - T20CM09215
Permit Status: Complete
Permit Description: Proposed construction of 229,320 sf shell building and associated site work
Date | Description | Comments |
---|---|---|
01/21/2021 | ROOF TRUSSES MUST BE APPROVED PRIOR TO FRAMING INSPECTION (P2I) | |
01/21/2021 | SPECIAL INSPECTION FORMS AND REPORTS REQUIRED PRIOR TO ISSUANCE OF A CERTIFICATE OF OCCUPANCY. | |
01/21/2021 | SPECIAL INSPECTION FOR CONCRETE IS REQUIRED.. | |
01/21/2021 | SPECIAL INSPECTION FOR BOLTS INSTALLED IN CONCRETE IS REQUIRED. | |
01/21/2021 | SPECIAL INSPECTION FOR REINFORCING STEEL AND/OR PRE-STRESSING TENDONS IS REQUIRED. | |
01/21/2021 | SPECIAL INSPECTION FOR HIGH STRENGTH BOLTING IS REQUIRED. | |
01/21/2021 | SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED. | |
01/21/2021 | SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED. | |
01/21/2021 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
01/21/2021 | SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED. |
Outstanding Inspections
Permit Status: Complete
Permit Number: T20CM09215
Permite Description: Proposed construction of 229,320 sf shell building and associated site work
Total Outstanding Inspections - 13
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/26/2022 | COT - HCBU - Preslab | N/A | Not Ready | |
10/26/2022 | COT - HCEL - Electrical Intermediate | N/A | Not Ready | |
10/26/2022 | COT - HCBU - Excavation/Rebar/Zoning | N/A | Not Ready | |
10/26/2022 | COT - HCBU - Framing | N/A | Not Ready | |
10/26/2022 | COT - HCEL - Grounding/Bonding | N/A | Not Ready | |
10/26/2022 | COT - HCBU - Interior Shear Bracing | N/A | Not Ready | |
10/26/2022 | COT - HCEL - Electrical Underground | N/A | Not Ready | |
10/26/2022 | COT - HCBU - Building Progress | N/A | Not Ready | |
10/26/2022 | COT - FCON - Alarm - Final | N/A | Not Ready | |
10/26/2022 | COT - HCPL - Plumbing Final | N/A | Not Ready | |
10/26/2022 | COT - FCON - Underground Flush | N/A | Not Ready | |
01/13/2023 | COT - FCON - Sprinkler - Final | N/A | Partial Pass | CG: The north two risers and the south two risers flow switches need to activate the water flow bell. |
01/20/2023 | COT - FCON - Fire - Final | N/A | Partial Pass | Exit lighting on east side of building (4) lights. FDC caps, sprinkler coverage under mezzanine in electrical room. OK to obtain TCO |
Completed Inspections
Permit Status: Complete
Permit Number: T20CM09215
Permit Description: Proposed construction of 229,320 sf shell building and associated site work
Total Completed Inspections - 36
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
03/18/2022 | COT - HCPL - Sewer | Passed | {Activity date: 03/18/2022; Status: Approved; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Approved Negative vacuum test for Manhole 4 PASS. Negative vacuum test for Manhole 5 PASS} ; {Activity date: 03/16/2022; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by VVERA1 - partial, Air test for main line from Manhole 4-5 PASS, Mandril PASS} ; {Activity date: 03/15/2022; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Partial, Correction for mainline from manhole 4-5 complete and ok to backfill. } ; {Activity date: 03/10/2022; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Partial, no inspection today see previous notes } ; {Activity date: 03/09/2022; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Partial ,Air pressure test and Mandril results For Private Sewer Main. (Manhole 5 to public manhole, air test PASS, Mandril PASS) (Manhole 5-4 air test PASS, Mandril FAIL correction required), (Manhole 4-3 Air test PASS, Mandril PASS),(Manhole 3-2 Air test PASS, Mandril PASS),( Manhole 2-1 air test PASS, Mandril PASS)} ; {Activity date: 03/07/2022; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - partial, Sewer main from public manhole to private manhole ok to backfill progress areas.} ; {Activity date: 03/02/2022; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Partial, sewer main from MH1-MH2 ok to backfill progress areas. } ; {Activity date: 02/25/2022; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Partial, 8” main from man hole 2-3 ok to backfill progress areas. } ; {Activity date: 02/18/2022; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Partial, Inspection of 8” main line from manhole 4-5 ok to backfill progress areas} |
|
07/01/2022 | COT - HCPL - Rough Soil | Passed | {Activity date: 07/01/2022; Status: Approved; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Approved} ; {Activity date: 03/07/2022; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - partial, Sewer main from public manhole to private manhole ok to backfill progress areas. } ; {Activity date: 03/02/2022; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Partial, sewer main from MH1-MH2 ok to backfill progress areas.} ; {Activity date: 02/25/2022; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Partial, 8” main from man hole 2-3 ok to backfill progress areas.} ; {Activity date: 02/23/2022; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Partial, Main line installed from MH3-MH4 ok to backfill progress areas.} ; {Activity date: 02/18/2022; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Partial, see previous notes} ; {Activity date: 11/24/2021; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Partial, South building Waste lines under slab to exterior two way clean outs installed and tested. Ok to backfill progress areas.} ; {Activity date: 11/10/2021; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Partial, 4”-6” SANITARY WASTE line under slab Approved from (GL 1-12. A-E) ok to backfill progress. } |
|
07/01/2022 | COT - HCPL - Yard Water Line | Passed | {Activity date: 07/01/2022; Status: Approved; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Approved} ; {Activity date: 06/30/2022; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - PARTIAL, 3" main line installed with tracer line, test required.} | |
08/08/2022 | COT - HCBU - Roof Nailing | Passed | {Activity date: 08/08/2022; Status: Approved; Inspector: WGALLAGHER; Comment: Entered by VVERA1 - Approved} ; {Activity date: 08/01/2022; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Partial, ROOF deck nail inspection to GL 16 ok to proceed. } ; {Activity date: 07/21/2022; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Partial, Deck nail inspection for progress @ North end ok to proceed. } |
|
09/19/2022 | PDSD Building Division - TEP PM Clearance | Passed | {Activity date: 09/19/2022; Status: Approved; Inspector: ESTEVENS; Comment: Entered by VVERA1 - CODE ECO} | |
09/19/2022 | COT - HCEL - Construction Power | Passed | {Activity date: 09/19/2022; Status: Approved; Inspector: ESTEVENS; Comment: Entered by VVERA1 - Approved. The TEP clearance code ECO..} | |
09/29/2022 | COT - HCPL - Gas Pressure Test | Passed | {Activity date: 09/29/2022; Status: Approved; Inspector: ESTEVENS; Comment: Entered by NGARCIA3 - Approved} | |
09/29/2022 | COT - HCPL - Plumbing Intermediate | Passed | {Activity date: 09/29/2022; Status: Approved; Inspector: ESTEVENS; Comment: Entered by NGARCIA3 - Approved} ; {Activity date: 06/30/2022; Status: Not ready for Inspection; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Not Ready.} | |
12/20/2022 | COT - HCBU - Preslab | Passed | ||
12/20/2022 | COT - HCEL - Electrical Intermediate | Passed | ||
12/20/2022 | COT - HCBU - Excavation/Rebar/Zoning | Passed | ||
12/20/2022 | COT - HCBU - Framing | Passed | ||
12/20/2022 | COT - HCEL - Grounding/Bonding | Passed | ||
12/20/2022 | COT - HCBU - Interior Shear Bracing | Passed | ||
12/20/2022 | COT - HCEL - Electrical Underground | Passed | ||
12/20/2022 | COT - HCBU - Building Progress | Passed | ||
12/20/2022 | COT - HCEL - Electrical Above Ceiling | Passed | ||
12/20/2022 | COT - HCBU - Building Above Ceiling | Passed | ||
12/20/2022 | COT - HCEL - Temporary Service | Passed | ||
12/20/2022 | COT - HCME - Mechanical Intermediate | Passed | ||
12/20/2022 | COT - HCBU - Stem Wall/Retaining Wall | Passed | ||
12/23/2022 | COT - HCME - Mechanical Final | Passed | ||
12/23/2022 | COT - HCBU - Firewall/Fire Barrier/Firestop | Passed | ||
12/23/2022 | COT - HCBU - Sustainability | Passed | ||
12/23/2022 | COT - HCEL - Outdoor Lighting | Passed | ||
12/23/2022 | COT - HCPL - Plumbing Roof Drains | Passed | ||
01/13/2023 | COT - FCON - Alarm - Final | Passed | ||
01/20/2023 | COT - HCPL - Plumbing Final | Passed | Exterior shell of building is complete. Ready for future tenant improvement work to begin. | |
01/20/2023 | COT - HCEL - Electrical Final | Passed | Exterior shell of building is complete. Ready for future tenant improvement work to begin. | |
01/20/2023 | COT - FCON - Underground Flush | Passed | Approved on premit T22FC00062 11/9/22 | |
01/20/2023 | FCON – OH Piping & Hydro | Passed | ||
01/25/2023 | COT - FCON - Pump - Final | Passed | ||
01/25/2023 | COT - FCON - Sprinkler - Final | Passed | ||
01/25/2023 | COT - HCBU - Building Final | Passed | contractor is waiting on final approval from fire dept and site inspections. | |
11/21/2023 | COT - FCON - Fire - Final | Passed | ||
03/08/2023 | COT - FCON - Underground Pressure | Passed | Permit t22FC00062 passed on 01/25/2022 |