Address Search: 6818 S COUNTRY CLUB RD
Search
Permits
Address: 6818 S COUNTRY CLUB RD
Date - 11/25/2024 5:41 a.m.
Total Number Of Permits - (40)
Permit | Status | Apply Date | Expired Date | Unit | Type | Description |
---|---|---|---|---|---|---|
T20CM09215 | Complete | 12/29/2020 | 05/19/2024 | Commercial Building | Proposed construction of 229,320 sf shell building and associated site work | |
DS20-18 | Approved | 12/16/2020 | N/A | Zoning Compliance | Tucson Airport Center (TAC 2), TSMR - TSMR - Tucson Airport Center. Standard number 8-01.5.0, garbage enclosures. | |
TC-COM-1122-00184 | Complete | 11/28/2022 | 09/10/2024 | Commercial Building | Full build out of suites 100 thru 160 for United Parcel Service and their sorting/distribution operations. | |
TF-FCP-1123-01337 | Void | 11/21/2023 | N/A | UNIT 120 | Fire Construction Permit | VOID-Submit under Permit#TF-FCP-0623-00821 - installing sprinkler heads below conveyors in all areas where more than 48 inches wide |
TC-COM-1122-00068 | Void | 11/08/2022 | N/A | Commercial Building | Void-VF-Wrong Permit Category was submitted. Please resubmit under Commercial Addition/Alteration Permit Proposed build out of suites 100 thru 160 for United Parcel Services and their sorting/distribution operations. | |
T21RW04930 | Complete | 11/04/2021 | 03/16/2023 | Right-of-Way (ROW) | NEW CURB AND SIDEWALK ON E MEDINA RD, S COUNTRY CLUB RD AND E ELVIRA RD. ALL WORK IS SHOULDER WORK. | |
TC-COM-1123-02588 | Complete | 11/03/2023 | 10/09/2024 | UNIT 170 | Commercial Building | Tenant improvement, Manufacturing use, adding 2 toilet rooms, and expanding the existing office area. Adding one new mechanical unit, and related lighting and power |
T22CM06960 | Complete | 09/12/2022 | 12/20/2023 | UNIT 170 | Commercial Building | TI: TUCSON AIRPORT CENTER |
T22CM06963 | Complete | 09/12/2022 | 05/19/2024 | UNIT 190 | Commercial Building | TI: TUCSON AIRPORT CENTER |
TR-UTL-0923-02414 | Issued | 09/04/2023 | 12/24/2023 | Right-of-Way (ROW) - Utility | PRJ256520-1 COX TO OVERLASH 144F ON 2 POLES, & PLACE NEW ATTACHMENT/PLANT 144CT ON 8 POLES FOR 1,764' | |
DP20-0173 | Complete | 09/02/2020 | 03/22/2027 | Development Package | RESTRICTED RECORDS: SITE/GRADING/SWPPP - Tucson Airport Center (TAC 2), new shell building, phases one and two. | |
T21FC00611 | Complete | 08/04/2021 | 03/13/2023 | Fire Construction Permit | Automatic Fire Extingshing Sys - Install (7) wet pipe ESFR systems.; Commercial Fire Pumps and Related Equipment - New Pumps: 1 | |
T21CM06073 | Needs Resubmittal | 07/27/2021 | N/A | Commercial Building | 200 Amp Temporary Service in pole | |
TF-FCP-0723-00854 | Complete | 07/12/2023 | N/A | Fire Construction Permit | Fuel tank submittal | |
TF-FCP-0723-00855 | Void | 07/12/2023 | N/A | Fire Construction Permit | VOID-SUBMIT A FIRE GENERAL OPERATIONAL PERMIT AND ADD OWNER TO CONTACTS-GENERAL OPERATIONAL PERMIT | |
TF-FCP-0723-00827 | Complete | 07/05/2023 | 07/05/2024 | Fire Construction Permit | New Fire Alarm System | |
TF-FCP-0623-00821 | Complete | 06/29/2023 | 06/07/2024 | Fire Construction Permit | ups ti adding 55 new sprinkler heads below ceiling for new offices and restrooms | |
TR-UTL-0623-01865 | Complete | 06/23/2023 | 09/02/2023 | Right-of-Way (ROW) - Utility | P.129913 : ACCESS OF EX MH 15520 FOR SPLICING, REPLACE (1) PED AND BORE 179' | |
T22FC00399 | Complete | 06/08/2022 | 08/09/2023 | Fire Construction Permit | Fire Alarm & Detection Systems - BLDG A - SHELL ONLY. DEDICATED FUNCTION FIRE SPRINKLER AND FIRE PUMP MONITORING SYSTEM.; Fire Alarm Systems - New Sq Ft: 500 | |
TD-DEV-0523-00233 | Void | 05/08/2023 | 05/07/2024 | Development Package | VOID - Duplicate to DP20-0173. Revision to DP20-0173 to add fueling station for use of UPS Delivery Trucks. UPS Fuel Storage Tank Permit - TC-COM-0123-00463. Main UPS TI Permit - TC-COM-1122-00184 | |
TC-CFO-0423-00058 | Issued | 04/27/2023 | 07/05/2023 | 190 | Certificate of Occupancy | This project will need the okay for TCO from an inspector in fire and the level of TCO. Please re-request once you get the okay for TCO from the fire inspector- TI: TUCSON AIRPORT CENTER |
TC-CFO-0423-00059 | Needs Resubmittal | 04/27/2023 | N/A | UNIT 170 | Certificate of Occupancy | This project will need the okay for TCO from an inspector in fire and building and the level of TCO. Please re-request once you get the okay for TCO TI: TUCSON AIRPORT CENTER |
TC-CFO-0423-00059 | Needs Resubmittal | 04/27/2023 | N/A | UNIT 180 | Certificate of Occupancy | This project will need the okay for TCO from an inspector in fire and building and the level of TCO. Please re-request once you get the okay for TCO TI: TUCSON AIRPORT CENTER |
TC-COM-0424-00682 | Issued | 04/16/2024 | 12/29/2024 | UNIT 110 | Commercial Building | Installation of new SWS |
T22FC00282 | Issued | 04/15/2022 | 05/03/2023 | Fire Construction Permit | Flammable & Combustible Liquid - NEW FUEL TANK FOR NEW PUP IN PREVIOUS SUBMITTAL T21FC00611; Other Construction Permit | |
TC-COM-0423-01020 | Complete | 04/11/2023 | 09/10/2024 | Commercial Building | Engineering, Manufacturing, Conveyor Electrical Design, and complete Turnkey Installation of a Package Handling Automated System in a leased warehouse. Work shall include, but not limited to, conveyor and conveyor electrical installation design to include a 30%, 80%, and 100% Owners review. | |
TS-PRM-0324-00142 | Complete | 03/29/2024 | 11/10/2024 | UNIT 170 | Sign - Permanent | Install one non-lighted wall sign. |
TF-FOP-0323-00720 | Complete | 03/22/2023 | 07/06/2024 | Fire Operational Permit | High Pile Storage Permit Solid Pile Storage Only ESFR K-16.8 @52psi Top of Storage 32'-0" High Pile Are: 30,225 SQ.FT Solid Pile Area: 17,157 SQ.FT. Solid Pile Volume: <400,000 V. | |
TC-CFO-0324-00064 | Complete | 03/14/2024 | 04/13/2024 | Certificate of Occupancy | Full build out of suites 100 thru 160 for United Parcel Service and their sorting/distribution operations. | |
TC-CFO-0324-00063 | Denied | 03/13/2024 | N/A | Certificate of Occupancy | L of C issued Engineering, Manufacturing, Conveyor Electrical Design, and complete Turnkey Installation of a Package Handling Automated System in a leased warehouse. Work shall include, but not limited to, conveyor and conveyor electrical installation design to include a 30%, 80%, and 100% Owners review. | |
TF-FCP-0323-00455 | Complete | 03/08/2023 | N/A | Fire Construction Permit | In response to UPS needs at existing facility, install new above ground fuel storage tank skid with dispensers and new concrete pad to be connected to existing infrastructure. | |
TF-FOP-0323-00649 | Complete | 03/08/2023 | 06/13/2024 | Fire Operational Permit | In response to UPS needs at existing facility, install new above ground fuel storage tank skid with dispensers and new concrete pad to be connected to existing infrastructure | |
TC-CFO-0324-00058 | Denied | 03/04/2024 | N/A | Certificate of Occupancy | This project needs the okay for a Temporary Certificate of Occupancy from a Building Inspector and Fire Inspector and the level of Temporary Certificate of Occupancy (TCO) for the building. Please re-request on the inspector has given the okay for TCO Full build out of suites 100 thru 160 for United Parcel Service and their sorting/distribution operations. | |
TF-FCP-0323-00432 | Complete | 03/02/2023 | 12/04/2023 | Fire Construction Permit | Adding 27 Heads in new offices. | |
TS-PRM-0223-00212 | Inspections Complete | 02/28/2023 | 09/03/2024 | Sign - Permanent | 3 WALL SIGNS, 1 MONUMENT SIGN, 1 DIRECTIONAL SIGN | |
T22FC00062 | Expired | 01/25/2022 | 10/08/2022 | Fire Construction Permit | Automatic Fire Extingshing Sys - Tucson Airport Center 2 Building A - Underground fire line permit.Paid on Permit T22FC00087; Commercial Fire Sprinkler Systems - Underground Fire Line Supply | |
TF-FCP-0124-00044 | Complete | 01/18/2024 | 07/24/2024 | UNIT 170 | Fire Construction Permit | Modify existing fire sprinkler system to accommodate new interior buildout. |
TC-COM-0123-00463 | Complete | 01/12/2023 | 09/22/2024 | Commercial Building | In response to UPS needs at existing facility, install new above ground fuel storage tank skid with dispensers and new concrete pad to be connected to existing infrastructure | |
TC-COM-0123-00464 | Void | 01/12/2023 | 07/11/2023 | Commercial Building | Void-VF-Duplicate Application. In review under TC-COM-0123-00463 In response to UPS needs at existing facility, install new above ground fuel storage tank skid with dispensers and new concrete pad to be connected to existing infrastructure | |
TF-FCP-0123-00277 | Complete | 01/10/2023 | N/A | Fire Construction Permit | MONITORING ONLY |
Plans
Address: 6818 S COUNTRY CLUB RD
Date - 11/25/2024 5:41 a.m.
Total Number Of Plans - (4)
Plan Number | Status | Application Date | Exp Date | Unit | Type | Description |
---|---|---|---|---|---|---|
S22-019 | Complete | 04/05/2022 | N/A | -- Land Split/Lot Split | Restricted Access -Tucson Airport Center,LotSplit | |
T21BA00043 | Submitted | 09/22/2021 | N/A | -- Stormwater Basin | Retention Basin | |
TE-BAS-0923-00174 | Approved | 09/03/2023 | N/A | -- Commercial Water Harvesting Ordinance | SITE/GRADING/SWPPP - Tucson Airport Center (TAC 2), new shell building, phases one and two. | |
TP-PRE-0623-00249 | Complete | 06/22/2023 | N/A | -- Pre-Application Conference | We are working with Patrick Haugen (VLMK) to obtain permitting for TAC2 - New Shell Building DP20-0173 and additionally Alteration Permit TC-COM-0123-00463. We are working through the design and received feedback from your office regarding the tank size. The City advised that the tank is limited to 10,000 gallons. (The current designed tank is 12,000 gallons) and advised that A Board of Adjustment for Variance is required. Iman Monshizadeh advised me to apply for a pre-application conference first to begin the variance process. |
Record Requests
Address: 6818 S COUNTRY CLUB RD
Date - 11/25/2024 5:41 a.m.
Total Number Of Requests - (15)
Request Number | Status | Request Date | Completed Date | Type | Description |
---|---|---|---|---|---|
REQ-0323-01498 | Complete | 03/08/2023 | 03/15/2023 | Requests | Proposed construction of 229,320 sf shell building and associated site work |
REQ-0324-01956 | Denied | 03/08/2024 | N/A | Requests | This project needs related permits DP20-0173 and TC-COM-0423-01020 to be in completed status. Please schedule inspections and re-request L of C/ C of O once inspections are approved on both activities. Full build out of suites 100 thru 160 for United Parcel Service and their sorting/distribution operations. |
REQ-0324-02075 | Complete | 03/14/2024 | 03/14/2024 | Requests | Engineering, Manufacturing, Conveyor Electrical Design, and complete Turnkey Installation of a Package Handling Automated System in a leased warehouse. Work shall include, but not limited to, conveyor and conveyor electrical installation design to include a 30%, 80%, and 100% Owners review. |
REQ-0324-02114 | Denied | 03/15/2024 | N/A | Requests | This project (TC-COM-1122-00184) Is not complete. 1. This project needs related permit DP20-0173 to be in completed status. Please complete this project. Re-request for L of C/ C of O once DP20-0173 is approved. If you have any questions, please contact building_official@tucsonaz.gov Full build out of suites 100 thru 160 for United Parcel Service and their sorting/distribution operations. |
REQ-0424-02636 | Complete | 04/03/2024 | 04/05/2024 | Requests | TC-CMO-1122-00184 DP is now in Complete status Full build out of suites 100 thru 160 for United Parcel Service and their sorting/distribution operations. |
REQ-0424-02875 | Complete | 04/16/2024 | 04/17/2024 | Requests | Tenant improvement, Manufacturing use, adding 2 toilet rooms, and expanding the existing office area. Adding one new mechanical unit, and related lighting and power |
REQ-0524-03835 | Complete | 05/22/2024 | 06/28/2024 | Requests | Per addressing new assignment for this space is 110 |
REQ-0623-03207 | Denied | 06/08/2023 | N/A | Requests | This Project is not complete related permit TF-FCP-0323-00432 needs to be in completed status and all conditions need to be satisfied. Please submit chlorination and air balance report. Please re-request L of C/C of O once the inspection is completed for TF-FCP-0323-00432 and chlorination report and air balance report are approved -TI: TUCSON AIRPORT CENTER Suite 190 |
REQ-0623-03304 | Withdrawn | 06/13/2023 | N/A | Requests | Duplicate REQ-0623-03361- TI: TUCSON AIRPORT CENTER |
REQ-0623-03360 | Denied | 06/16/2023 | N/A | Requests | This project is not complete all conditions need to be satisfied, and all inspections need to be approved please request all open inspections on your Tucson Development Center account. Please re-request L of C/C of O once all inspections are approved and all condition are satisfied. - TI: TUCSON AIRPORT CENTER |
REQ-0623-03361 | Complete | 06/16/2023 | 06/21/2023 | Requests | TI: TUCSON AIRPORT CENTER |
REQ-0623-03589 | Complete | 06/29/2023 | 07/01/2023 | Requests | TI: TUCSON AIRPORT CENTER Suite 170 TI |
REQ-0723-03844 | Complete | 07/13/2023 | 07/13/2023 | Requests | We are working with Patrick Haugen (VLMK) to obtain permitting for TAC2 - New Shell Building DP20-0173 and additionally Alteration Permit TC-COM-0123-00463. We are working through the design and received feedback from your office regarding the tank size. The City advised that the tank is limited to 10,000 gallons. (The current designed tank is 12,000 gallons) and advised that A Board of Adjustment for Variance is required. Iman Monshizadeh advised me to apply for a pre-application conference first to begin the variance process. |
REQ-1023-05480 | Complete | 10/09/2023 | 10/09/2023 | Requests | We are requesting an extension for TC-COM-0123-00463 so that post review step to be completed, and to ultimately move forward with the issuance process per email with Wyatt Berger on 10/9. |
REQ-1222-00543 | Approved | 12/28/2022 | 12/28/2022 | Requests | Automatic Fire Extingshing Sys - Install (7) wet pipe ESFR systems.; Commercial Fire Pumps and Related Equipment - New Pumps: 1 |