Permit: T20CM08395
Permit Details
Apply Date:
12/01/2020
Applicant:
Lisa Bowers
Description:
TCO for entire building, excluding kitchen area
Permit Reviews
Permit Number - T20CM08395
Permit Status: Expired
Permit Description: TCO for entire building, excluding kitchen area
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
10/28/2021 | REVISION - - 1ST | 10/28/2021 | COMPLETED |
12/01/2020 | COMMERCIAL - NEW | 02/12/2021 | COMPLETED |
12/07/2021 | REVISION - - 1ST | 01/13/2022 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T20CM08395
Permit Status: Expired
Permit Description: TCO for entire building, excluding kitchen area
Total Outstanding Activity Conditions - 2
Date | Name |
---|---|
01/13/2022 | This building permit approval is without public sewer connection review or approval. It is strictly the responsibility of the owner and/or person doing the work to ensure that the appropriate review and approval to connect is obtained from Regional Wastewater Reclamation Department (RWRD) wastewater provider or Pima County DEQ approval of/and alternative disposal system. It is required that owner and/or person doing the work solicit all requisite approvals from the wastewater provider prior to obtaining this building construction permit. RWRD connection information is available at www.pima.gov/wwm/developer.htm |
01/13/2022 | PIMA COUNTY WASTEWATER SIGN OFF REQUIRED PRIOR TO ISSUANCE OF FINAL STATUS. |
Outstanding Inspections
Permit Status: Expired
Permit Number: T20CM08395
Permite Description: TCO for entire building, excluding kitchen area
Total Outstanding Inspections - 4
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
12/10/2021 | COT - LCEL - Construction Power | N/A | Canceled | {Activity date: 12/10/2021; Status: Not Applicable; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Not Applicable. } |
12/10/2021 | COT - LCPL - Medical Gas Preconstruction Mtg | N/A | Canceled | {Activity date: 12/10/2021; Status: Not Applicable; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Not Applicable. } |
12/10/2021 | COT - LCBU - Sustainability | N/A | Canceled | {Activity date: 12/10/2021; Status: Not Applicable; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Not Applicable. } |
11/07/2022 | COT - LCBU - Building Final | N/A | Canceled | Inspection Canceled |
Completed Inspections
Permit Status: Expired
Permit Number: T20CM08395
Permit Description: TCO for entire building, excluding kitchen area
Total Completed Inspections - 32
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
12/01/2021 | COT - LCEL - Electrical Above Ceiling | Passed | {Activity date: 12/01/2021; Status: Approved; Inspector: DMUNIZ; Comment: Entered by RSALDAT1 - Approved} ; {Activity date: 10/21/2021; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - ) Partial, 1st floor corridor 3104, 3110, dining 3117, training room 3114, 3108-3112, 3106, 3126, 3105. All Ok to start dropping ceiling tiles.} ; {Activity date: 10/04/2021; Status: Cancelled; Inspector: TGAUSP; Comment: Entered by VVERA1 - Unable to perform inspection, cancelled by Contractor} ; {Activity date: 09/15/2021; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by RSALDAT1 - Partial, second floor Connection building ok to drop ceiling tiles in inspected areas} ; {Activity date: 09/10/2021; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Partial, see previous notes} ; {Activity date: 09/09/2021; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Partial, Inspection for 3110, 3104 ok to install ceiling.} ; {Activity date: 09/07/2021; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by RSALDAT1 - partial, 1st floor training room and galley soffits ok to Sheetrock. } ; {Activity date: 08/31/2021; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Partial, Connections Building first floor South bathroom ok to install ceiling.} ; {Activity date: 08/18/2021; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Partial. Office building 2nd floor electrical above ceiling complete. } |
|
12/06/2021 | COT - LCEL - Electrical Underground | Passed | {Activity date: 12/06/2021; Status: Approved; Inspector: DMUNIZ; Comment: Entered by RSALDAT1 - Approved , underground conduits from Office Building to Generator pad and future PV ok to backfill progress.} ; {Activity date: 11/09/2021; Status: Approved; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Approved} ; {Activity date: 11/08/2021; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Partial, Conduits installed for plaza Lighting & ok to backfill progress.} ; {Activity date: 10/19/2021; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Partial, underground conduits from ELECTRICAL room 3121 (3 data and power conduits for pedestals)ok to backfill progress.} ; {Activity date: 07/29/2021; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by RSALDAT1 - Partial, conduits installed from office building for future card reader and gate controls ok to backfill progress.} | |
12/08/2021 | COT - LCEL - Electrical Intermediate | Passed | {Activity date: 12/08/2021; Status: Approved; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Approved, Electrical for Chiller #2 , VFD, & Pump all ok to commission connection building. } ; {Activity date: 12/06/2021; Status: Approved; Inspector: DMUNIZ; Comment: Entered by RSALDAT1 - Approved} ; {Activity date: 11/30/2021; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by RSALDAT1 - PARTIAL, No inspection today} ; {Activity date: 09/21/2021; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Partial, Inspection of following equipment complete, ok to energize and lock out, tag out as needed. ( 3HB1, 3LB11, 3LB12, 3HB2). Electrical for room 3117 pony wall complete.} ; {Activity date: 09/20/2021; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Partial, no inspection today see previous notes.} ; {Activity date: 09/10/2021; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by VVERA1 - PARTIAL, Inspection of following equipment complete (3TB1, 3NB1, 3NB21, 3NB22, 3TB2, 225ECB). } ; {Activity date: 09/09/2021; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Partial Electrical in kitchen walls ok to Sheetrock} ; {Activity date: 08/23/2021; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by RSALDAT1 - PARTIAL, Inspection for following equipment complete & ok to energize, (3DBA1, 3MB1, 3MB2, 3LB21, 3LB22, AHU-1, KMAU-1)} ; {Activity date: 08/06/2021; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by RSALDAT1 - 1035, 2035, 3035, 4035. PARTIAL. Level 1. corridor 3104, 3100, training room 3114, 3105, galley 3116, conference room 3112, 3109, AV room 3126, multi-purpose room 3111, huddle room 3106, lobby 3115. Level 2. Open office 3213, 3212, breakroom 3202. Restroom 3203, 3204. Corridor 3205, storage room 3211,} ; {Activity date: 08/05/2021; Status: Partial Approval; Inspector: RELEFANTE; Comment: Entered by RSALDAT1 - PA} ; {Activity date: 08/04/2021; Status: Cancelled; Inspector: ESTEVENS; Comment: Entered by NGARCIA3 - Canceled by contractor} ; {Activity date: 07/29/2021; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by RSALDAT1 - Partial, Inspection for following panels complete in Office Building (Electrical room 5128-5LA11, 5LA12, 5LA13, 5HA1)(Electrical room 5220- 5LA2, 5UL2, 5UL22, 5UL23, 5UL24)( Electrical room 5129-5GL). Inspection for in wall electrical complete for following rooms (5123, 5126, 5202).} ; {Activity date: 07/12/2021; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by RSALDAT1 - partial, 3212, 3213 electrical in wall ok to proceed.} ; {Activity date: 07/07/2021; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by RSALDAT1 - PARTIAL, 2nd floor north offices in connection Building conduit sweeps installed for data. (3213-3219, 3201-3202)Note: fire Putty boxes in devising elevator wall.} ; {Activity date: 06/28/2021; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by VLEON1 - Partial, Electrical in walls second floor for following rooms complete and ok to Sheetrock. (3202, 3203, 3204, 3206).} ; {Activity date: 06/21/2021; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by VLEON1 - Partial, elevator machine room 3103 and stairwell 3101 Electrical in walls ok to Sheetrock. } ; {Activity date: 06/10/2021; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by VLEON1 - Partial, 2nd floor Electrical in office walls ok to cover following rooms.( 3208, 3210, 3214, 3215, 3216, 3217, 3218).} |
|
12/08/2021 | COT - LCPL - Plumbing Intermediate | Passed | {Activity date: 12/08/2021; Status: Approved; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Approved, Chiller lines for Chiller #2 ,& Pump all ok to commission connection building.} ; {Activity date: 10/21/2021; Status: Approved; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Approved, 3120, 3119, 3118} ; {Activity date: 08/23/2021; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by RSALDAT1 - partial, 1st floor and second floor connection building Potable water lines & DWV tested.} ; {Activity date: 08/20/2021; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Partial, no inspection today see previous notes} ; {Activity date: 08/06/2021; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by RSALDAT1 - 1035, 2035, 3035, 4035. PARTIAL. Level 1. corridor 3104, 3100, training room 3114, 3105, galley 3116, conference room 3112, 3109, AV room 3126, multi-purpose room 3111, huddle room 3106, lobby 3115. Level 2. Open office 3213, 3212, breakroom 3202. Restroom 3203, 3204. Corridor 3205, storage room 3211,} ; {Activity date: 07/29/2021; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by RSALDAT1 - Partial, no inspection today see previous notes} ; {Activity date: 07/26/2021; Status: Partial Approval; Inspector: TGAUSP; Comment: Entered by RSALDAT1 - Partial, roof drains at SW corner of building} ; {Activity date: 07/23/2021; Status: Partial Approval; Inspector: TGAUSP; Comment: Entered by RSALDAT1 - Partial roof drains at SE corner of building to outside } |
|
12/10/2021 | COT - LCBU - Building Above Ceiling | Passed | {Activity date: 12/10/2021; Status: Approved; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Approved} ; {Activity date: 09/15/2021; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by RSALDAT1 - Partial, second floor Connection building ok to drop ceiling tiles in inspected areas} ; {Activity date: 08/18/2021; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Partial. Office building 2nd floor ok to drop ceiling tiles except 1 for every Mechanical fixture. See 4036 notes.} | |
12/10/2021 | COT - LCBU - Framing | Passed | {Activity date: 12/10/2021; Status: Approved; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Approved} ; {Activity date: 09/15/2021; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by RSALDAT1 - partial, pony walls in foyer and break room ok to Sheetrock.} ; {Activity date: 08/06/2021; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by RSALDAT1 - 1035, 2035, 3035, 4035. PARTIAL. Level 1. corridor 3104, 3100, training room 3114, 3105, galley 3116, conference room 3112, 3109, AV room 3126, multi-purpose room 3111, huddle room 3106, lobby 3115. Level 2. Open office 3213, 3212, breakroom 3202. Restroom 3203, 3204. Corridor 3205, storage room 3211,} ; {Activity date: 05/13/2021; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by VLEON1 - PARTIAL Second level of. Connection Building rough frame progress inspected. Note: brace top plates of interior walls every 48".} ; {Activity date: 03/25/2021; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by VLEON1 - Partial, Attachment of Pre fab Exterior panels to structure on West side 1st and 2nd floor ok to proceed with installation.} |
|
12/10/2021 | COT - LCME - Mechanical Above Ceiling | Passed | {Activity date: 12/10/2021; Status: Approved; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Approved} ; {Activity date: 11/15/2021; Status: Partial Approval; Inspector: JBURGE; Comment: Entered by RSALDAT1 - Partial, Smoke test on Hood to Grease duct connection complete ok to fire wrap. } ; {Activity date: 11/05/2021; Status: Correction Required; Inspector: DMUNIZ; Comment: Entered by RSALDAT1 - ) corrections required, smoke test on Hood to duct connection failed. Multiple locations where welds are incorrect, repair, re-test and call in inspection when corrections are complete. } ; {Activity date: 11/04/2021; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Partial, no inspection required today, contractor rescheduled.see previous notes.} ; {Activity date: 08/18/2021; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by VVERA1 - PARTIAL, Above ceiling in Office Building 2nd floor inspected. Note: install seismic tie for all mechanical fixtures in acoustic ceiling locations. Check interconnections for all rigid to flex duct connections. Properly band where needed.} |
|
12/10/2021 | COT - LCBU - Firewall/Fire Barrier/Firestop | Passed | {Activity date: 12/10/2021; Status: Approved; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Approved} ; {Activity date: 08/20/2021; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Partial, FIRE seal complete outside stairwell 2nd floor. } |
|
12/10/2021 | COT - LCME - Kitchen Hood | Passed | {Activity date: 12/10/2021; Status: Approved; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Approved} ; {Activity date: 09/21/2021; Status: Correction Required; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Corrections required, Smoke test failed @ interconnection points from Hood to grease duct. I am requesting that a different design be applied to this system to meet manufacturers, air flow & slope requirements.} ; {Activity date: 09/17/2021; Status: Correction Required; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - corrections required, Leak detected on East hood/Duct connection, repair and retest. } ; {Activity date: 08/18/2021; Status: Correction Required; Inspector: DMUNIZ; Comment: Entered by VVERA1 - corrections required, Install steel fabricated interconnection from hood to duct. Provide manufacturer recommended smoke test. Tilt exhaust cap to drain properly.} |
|
12/10/2021 | COT - LCEL - Outdoor Lighting | Passed | {Activity date: 12/10/2021; Status: Approved; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Approved} | |
12/10/2021 | COT - LCBU - Preslab | Passed | {Activity date: 12/10/2021; Status: Approved; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Approved} | |
12/10/2021 | COT - LCPL - Plumbing Above Ceiling | Passed | {Activity date: 12/10/2021; Status: Approved; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Approved} ; {Activity date: 11/01/2021; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Partial , HOT & COLD lines above Kitchen areas tested & ok to to insulate. } |
|
12/10/2021 | COT - LCPL - Rough Soil | Passed | {Activity date: 12/10/2021; Status: Approved; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Approved} | |
12/10/2021 | COT - LCME - Mechanical Intermediate | Passed | {Activity date: 12/10/2021; Status: Approved; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Approved} ; {Activity date: 08/18/2021; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Partial, see 4050 notes.} ; {Activity date: 08/17/2021; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Partial, contractor rescheduled see previous notes} ; {Activity date: 08/06/2021; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by RSALDAT1 - 1035, 2035, 3035, 4035. PARTIAL. Level 1. corridor 3104, 3100, training room 3114, 3105, galley 3116, conference room 3112, 3109, AV room 3126, multi-purpose room 3111, huddle room 3106, lobby 3115. Level 2. Open office 3213, 3212, breakroom 3202. Restroom 3203, 3204. Corridor 3205, storage room 3211,} ; {Activity date: 07/29/2021; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by RSALDAT1 - Partial, first floor connection building supply duct pressure test complete.} ; {Activity date: 07/21/2021; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by RSALDAT1 - Partial, Hydro test at 150psi approved on all hydro piping systems. } ; {Activity date: 07/12/2021; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by RSALDAT1 - Partial, second floor med/hi pressure duct system tested and approved ok to insulate. } ; {Activity date: 06/25/2021; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by VLEON1 - PARTIAL, 2nd floor low/med pressure duct system installed & ok to insulate.} |
|
12/10/2021 | COT - LCBU - Roof Nailing | Passed | {Activity date: 12/10/2021; Status: Approved; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Approved} | |
12/10/2021 | COT - LCPL - Sewer | Passed | {Activity date: 12/10/2021; Status: Approved; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Approved} | |
12/10/2021 | COT - LCEL - Grounding/Bonding | Passed | {Activity date: 12/10/2021; Status: Approved; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Approved} ; {Activity date: 11/08/2021; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Partial, 20’ EGC installed at 3 plaza light pole bases and ok for concrete placement.} | |
12/10/2021 | COT - LCBU - Masonry Pregrout | Passed | {Activity date: 12/10/2021; Status: Approved; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Approved} | |
12/10/2021 | COT - HCBU - Interior Shear Bracing | Passed | {Activity date: 12/10/2021; Status: Approved; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Approved} ; {Activity date: 05/13/2021; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by VLEON1 - PARTIAL, second level of Connection building sheetrock top out on one side complete ok to proceed. } |
|
12/14/2021 | PDSD Site/Engineering Division - Landscaping | Passed | {Activity date: 12/14/2021; Status: Approved; Inspector: DROBERTS; Comment: Entered by VVERA1 - IS APPROVED} | |
12/14/2021 | PDSD Site/Engineering Division - NPPO | Passed | {Activity date: 12/14/2021; Status: Approved; Inspector: DROBERTS; Comment: Entered by VVERA1 - IS APPROVED} | |
12/14/2021 | TRSP - ROW - Final/Close-Out | Passed | {Activity date: 12/14/2021; Status: Approved; Inspector: ROBERTSON; Comment: Entered by DROBERT1 - INSPECTED BY BELL MONG: NO ROW IMPACT. OK TO APPROVE.} | |
12/14/2021 | COT - FCON - Sprinkler - Final | Passed | {Activity date: 12/14/2021; Status: Approved; Inspector: jfordney; Comment: Entered by JFORDNE1 - } ; {Activity date: 12/10/2021; Status: Partial Approval; Inspector: jfordney; Comment: Entered by JFORDNE1 - } | |
12/14/2021 | COT - LCBU - Exterior Clips/Sheathing | Passed | {Activity date: 12/14/2021; Status: Approved; Inspector: DMUNIZ; Comment: Entered by RSALDAT1 - Approved} ; {Activity date: 03/25/2021; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by VLEON1 - Partial, Pre fab Exterior panels on West side 1st and 2nd floor installed.} | |
12/14/2021 | PDSD Building Division - Sign Final | Passed | {Activity date: 12/14/2021; Status: Approved; Inspector: DROBERTS; Comment: Entered by VVERA1 - IS APPROVED} | |
03/29/2022 | COT - FCON - Alarm - Final | Passed | {Activity date: 03/29/2022; Status: Approved; Inspector: jfordney; Comment: Entered by JFORDNE1 - } ; {Activity date: 03/29/2022; Status: Approved; Inspector: jfordney; Comment: Entered by JFORDNE1 - } ; {Activity date: 12/29/2021; Status: Partial Approval; Inspector: jfordney; Comment: Entered by JFORDNE1 - ROC Test point report Tie in with ansul} ; {Activity date: 12/10/2021; Status: Partial Approval; Inspector: jfordney; Comment: Entered by JFORDNE1 - notification on second floor approved} |
|
03/29/2022 | COT - FCON - Fire - Final | Passed | {Activity date: 03/29/2022; Status: Approved; Inspector: jfordney; Comment: Entered by JFORDNE1 - } ; {Activity date: 12/29/2021; Status: Partial Approval; Inspector: jfordney; Comment: Entered by JFORDNE1 - Ok to obtain TCO for everything except kitchen KITCHEN AND ALL RELATED APPLIANCES ARE NOT TO BE USED} ; {Activity date: 12/14/2021; Status: Partial Approval; Inspector: jfordney; Comment: Entered by JFORDNE1 - 2nd floor ONLY approved to obtain TCO} |
|
03/29/2022 | COT - FCON - Hood System - Final | Passed | {Activity date: 03/29/2022; Status: Approved; Inspector: jfordney; Comment: Entered by JFORDNE1 - } ; {Activity date: 02/17/2022; Status: Partial Approval; Inspector: Jfordney; Comment: Entered by JFORDNE1 - Need picture of one appliance moved back under hood.} ; {Activity date: 12/29/2021; Status: Not ready for Inspection; Inspector: jfordney; Comment: Entered by JFORDNE1 - } | |
04/06/2022 | COT - LCME - Mechanical Final | Passed | {Activity date: 04/06/2022; Status: Approved; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Approved} ; {Activity date: 01/03/2022; Status: Partial Approval; Inspector: RSHERRY; Comment: Entered by RSHERRY1 - REVIEW OF PRELIMINARY AIR BALANCE REPORT COMPLETED. kITCHEN, AC-1, AC-2 & IU-1 NOT COMPLETED} ; {Activity date: 12/30/2021; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Partial, field inspections complete for 1st floor TCO. (Except kitchen Area, pending full Fire approval of ANSIL system and Kitchen hood.)} ; {Activity date: 12/29/2021; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by VVERA1 - PARTIAL, AIR balance report submitted for 1st floor approval. } ; {Activity date: 12/22/2021; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Partial, Approved for TCO, full use of 2nd floor only.} ; {Activity date: 12/15/2021; Status: Partial Approval; Inspector: RSHERRY; Comment: Entered by RSHERRY1 - REVIEW OF AIR BALANCE REPORT FOR 2ND FLOOR COMPLETED} ; {Activity date: 12/14/2021; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by RSALDAT1 - Partial, 2nd floor Approved for TCO, Air balance report submitted for approval.} ; {Activity date: 12/10/2021; Status: Not ready for Inspection; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Not Ready, provide air balance report prior to finals.} |
|
04/06/2022 | COT - LCEL - Electrical Final | Passed | {Activity date: 04/06/2022; Status: Approved; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Approved} ; {Activity date: 12/30/2021; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Partial, field inspections complete for 1st floor TCO. (Except kitchen Area.)} ; {Activity date: 12/22/2021; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Partial, Approved for TCO, full use of 2nd floor only.} ; {Activity date: 12/14/2021; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by RSALDAT1 - Partial, 2nd floor egress, Emergency lighting, & Elevator ok for TCO.} ; {Activity date: 12/10/2021; Status: Not ready for Inspection; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Not Ready, EM and egress lighting not working.} | |
04/06/2022 | ENGR Engineering Final | Passed | {Activity date: 04/06/2022; Status: Approved; Inspector: MHERNANDEZ; Comment: Entered by VVERA1 - APPROVED. } ; {Activity date: 03/01/2022; Status: Partial Approval; Inspector: MHERNANDEZ; Comment: Entered by NGARCIA3 - PARTIAL / OK FOR T C O .NEED TO STAKES AND OND ONE SCUPPER NEED TO BE FINISHED.} ; {Activity date: 12/14/2021; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by VVERA1 - IS PARTIAL, OK FOR TCO FOR OCCUPANCY } |
|
04/06/2022 | COT - LCPL - Plumbing Final | Passed | {Activity date: 04/06/2022; Status: Approved; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Approved} ; {Activity date: 01/13/2022; Status: Prior to Final Inspectn; Inspector: NGARCIA; Comment: Entered by NGARCIA3 - sewer receipt required prior to final inspection} ; {Activity date: 12/30/2021; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Partial, field inspections complete for 1st floor TCO. (Except kitchen Area.} ; {Activity date: 12/29/2021; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by VVERA1 - PARTIAL, See previous notes.} ; {Activity date: 12/22/2021; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Partial, Approved for TCO, full use of 2nd floor only.} ; {Activity date: 12/15/2021; Status: Partial Approval; Inspector: RSHERRY; Comment: Entered by RSHERRY1 - REVIEW OF WATER DISINFECTION REPORT COMPLETED} ; {Activity date: 12/14/2021; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by RSALDAT1 - Partial, 2nd floor Restrooms ok for TCO. Water chlorination report submitted for approval.} ; {Activity date: 12/10/2021; Status: Not ready for Inspection; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Not Ready, missing ADA grab bars and sleeves, provide chlorination report.} |