Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Expired
Type:
Commercial Building
Apply Date:
12/01/2020
Applicant:
Lisa Bowers
Description:
TCO for entire building, excluding kitchen area

Permit Reviews

Permit Number - T20CM08395
Permit Status: Expired
Permit Description: TCO for entire building, excluding kitchen area
Start Date Submittal Complete Date Status  
10/28/2021 REVISION - - 1ST 10/28/2021 COMPLETED Review Details
12/01/2020 COMMERCIAL - NEW 02/12/2021 COMPLETED Review Details
12/07/2021 REVISION - - 1ST 01/13/2022 COMPLETED Review Details

Outstanding Activity Conditions

Permit Number - T20CM08395
Permit Status: Expired
Permit Description: TCO for entire building, excluding kitchen area
Total Outstanding Activity Conditions - 2
Date Name
01/13/2022 This building permit approval is without public sewer connection review or approval. It is strictly the responsibility of the owner and/or person doing the work to ensure that the appropriate review and approval to connect is obtained from Regional Wastewater Reclamation Department (RWRD) wastewater provider or Pima County DEQ approval of/and alternative disposal system. It is required that owner and/or person doing the work solicit all requisite approvals from the wastewater provider prior to obtaining this building construction permit. RWRD connection information is available at www.pima.gov/wwm/developer.htm
01/13/2022 PIMA COUNTY WASTEWATER SIGN OFF REQUIRED PRIOR TO ISSUANCE OF FINAL STATUS.

Outstanding Inspections

Permit Status: Expired
Permit Number: T20CM08395
Permite Description: TCO for entire building, excluding kitchen area
Total Outstanding Inspections - 4
Last Inspection Date Description Inspector Results Comments
12/10/2021 COT - LCEL - Construction Power N/A Canceled {Activity date: 12/10/2021; Status: Not Applicable; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Not Applicable.
}
12/10/2021 COT - LCPL - Medical Gas Preconstruction Mtg N/A Canceled {Activity date: 12/10/2021; Status: Not Applicable; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Not Applicable.
}
12/10/2021 COT - LCBU - Sustainability N/A Canceled {Activity date: 12/10/2021; Status: Not Applicable; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Not Applicable.
}
11/07/2022 COT - LCBU - Building Final N/A Canceled Inspection Canceled

Completed Inspections

Permit Status: Expired
Permit Number: T20CM08395
Permit Description: TCO for entire building, excluding kitchen area
Total Completed Inspections - 32
Date Description Inspector Results Comments
12/01/2021 COT - LCEL - Electrical Above Ceiling Passed {Activity date: 12/01/2021; Status: Approved; Inspector: DMUNIZ; Comment: Entered by RSALDAT1 - Approved} ; {Activity date: 10/21/2021; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - ) Partial, 1st floor corridor 3104, 3110, dining 3117, training room 3114, 3108-3112, 3106, 3126, 3105. All Ok to start dropping ceiling tiles.} ; {Activity date: 10/04/2021; Status: Cancelled; Inspector: TGAUSP; Comment: Entered by VVERA1 - Unable to perform inspection, cancelled by Contractor} ; {Activity date: 09/15/2021; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by RSALDAT1 - Partial, second floor Connection building ok to drop ceiling tiles in inspected areas} ; {Activity date: 09/10/2021; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Partial, see previous notes} ; {Activity date: 09/09/2021; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Partial, Inspection for 3110, 3104 ok to install ceiling.} ; {Activity date: 09/07/2021; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by RSALDAT1 - partial, 1st floor training room and galley soffits ok to Sheetrock.

} ; {Activity date: 08/31/2021; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Partial, Connections Building first floor South bathroom ok to install ceiling.} ; {Activity date: 08/18/2021; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Partial. Office building 2nd floor electrical above ceiling complete.

}
12/06/2021 COT - LCEL - Electrical Underground Passed {Activity date: 12/06/2021; Status: Approved; Inspector: DMUNIZ; Comment: Entered by RSALDAT1 - Approved , underground conduits from Office Building to Generator pad and future PV ok to backfill progress.} ; {Activity date: 11/09/2021; Status: Approved; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Approved} ; {Activity date: 11/08/2021; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Partial, Conduits installed for plaza Lighting & ok to backfill progress.} ; {Activity date: 10/19/2021; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Partial, underground conduits from ELECTRICAL room 3121 (3 data and power conduits for pedestals)ok to backfill progress.} ; {Activity date: 07/29/2021; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by RSALDAT1 - Partial, conduits installed from office building for future card reader and gate controls ok to backfill progress.}
12/08/2021 COT - LCEL - Electrical Intermediate Passed {Activity date: 12/08/2021; Status: Approved; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Approved, Electrical for Chiller #2 , VFD, & Pump all ok to commission connection building.
} ; {Activity date: 12/06/2021; Status: Approved; Inspector: DMUNIZ; Comment: Entered by RSALDAT1 - Approved} ; {Activity date: 11/30/2021; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by RSALDAT1 - PARTIAL, No inspection today} ; {Activity date: 09/21/2021; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Partial, Inspection of following equipment complete, ok to energize and lock out, tag out as needed. ( 3HB1, 3LB11, 3LB12, 3HB2). Electrical for room 3117 pony wall complete.} ; {Activity date: 09/20/2021; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Partial, no inspection today see previous notes.} ; {Activity date: 09/10/2021; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by VVERA1 - PARTIAL, Inspection of following equipment complete (3TB1, 3NB1, 3NB21, 3NB22, 3TB2, 225ECB).
} ; {Activity date: 09/09/2021; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Partial Electrical in kitchen walls ok to Sheetrock} ; {Activity date: 08/23/2021; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by RSALDAT1 - PARTIAL, Inspection for following equipment complete & ok to energize, (3DBA1, 3MB1, 3MB2, 3LB21, 3LB22, AHU-1, KMAU-1)} ; {Activity date: 08/06/2021; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by RSALDAT1 - 1035, 2035, 3035, 4035. PARTIAL. Level 1. corridor 3104, 3100, training room 3114, 3105, galley 3116, conference room 3112, 3109, AV room 3126, multi-purpose room 3111, huddle room 3106, lobby 3115.
Level 2. Open office 3213, 3212, breakroom 3202. Restroom 3203, 3204. Corridor 3205, storage room 3211,} ; {Activity date: 08/05/2021; Status: Partial Approval; Inspector: RELEFANTE; Comment: Entered by RSALDAT1 - PA} ; {Activity date: 08/04/2021; Status: Cancelled; Inspector: ESTEVENS; Comment: Entered by NGARCIA3 - Canceled by contractor} ; {Activity date: 07/29/2021; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by RSALDAT1 - Partial, Inspection for following panels complete in Office Building (Electrical room 5128-5LA11, 5LA12, 5LA13, 5HA1)(Electrical room 5220- 5LA2, 5UL2, 5UL22, 5UL23, 5UL24)( Electrical room 5129-5GL). Inspection for in wall electrical complete for following rooms (5123, 5126, 5202).} ; {Activity date: 07/12/2021; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by RSALDAT1 - partial, 3212, 3213 electrical in wall ok to proceed.} ; {Activity date: 07/07/2021; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by RSALDAT1 - PARTIAL, 2nd floor north offices in connection Building conduit sweeps installed for data. (3213-3219, 3201-3202)Note: fire Putty boxes in devising elevator wall.} ; {Activity date: 06/28/2021; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by VLEON1 - Partial, Electrical in walls second floor for following rooms complete and ok to Sheetrock. (3202, 3203, 3204, 3206).} ; {Activity date: 06/21/2021; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by VLEON1 - Partial, elevator machine room 3103 and stairwell 3101 Electrical in walls ok to Sheetrock.

} ; {Activity date: 06/10/2021; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by VLEON1 - Partial, 2nd floor Electrical in office walls ok to cover following rooms.( 3208, 3210, 3214, 3215, 3216, 3217, 3218).}
12/08/2021 COT - LCPL - Plumbing Intermediate Passed {Activity date: 12/08/2021; Status: Approved; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Approved, Chiller lines for Chiller #2 ,& Pump all ok to commission connection building.} ; {Activity date: 10/21/2021; Status: Approved; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Approved, 3120, 3119, 3118} ; {Activity date: 08/23/2021; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by RSALDAT1 - partial, 1st floor and second floor connection building Potable water lines & DWV tested.} ; {Activity date: 08/20/2021; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Partial, no inspection today see previous notes} ; {Activity date: 08/06/2021; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by RSALDAT1 - 1035, 2035, 3035, 4035. PARTIAL. Level 1. corridor 3104, 3100, training room 3114, 3105, galley 3116, conference room 3112, 3109, AV room 3126, multi-purpose room 3111, huddle room 3106, lobby 3115.
Level 2. Open office 3213, 3212, breakroom 3202. Restroom 3203, 3204. Corridor 3205, storage room 3211,} ; {Activity date: 07/29/2021; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by RSALDAT1 - Partial, no inspection today see previous notes} ; {Activity date: 07/26/2021; Status: Partial Approval; Inspector: TGAUSP; Comment: Entered by RSALDAT1 - Partial, roof drains at SW corner of building} ; {Activity date: 07/23/2021; Status: Partial Approval; Inspector: TGAUSP; Comment: Entered by RSALDAT1 - Partial roof drains at SE corner of building to outside

}
12/10/2021 COT - LCBU - Building Above Ceiling Passed {Activity date: 12/10/2021; Status: Approved; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Approved} ; {Activity date: 09/15/2021; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by RSALDAT1 - Partial, second floor Connection building ok to drop ceiling tiles in inspected areas} ; {Activity date: 08/18/2021; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Partial. Office building 2nd floor ok to drop ceiling tiles except 1 for every Mechanical fixture. See 4036 notes.}
12/10/2021 COT - LCBU - Framing Passed {Activity date: 12/10/2021; Status: Approved; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Approved} ; {Activity date: 09/15/2021; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by RSALDAT1 - partial, pony walls in foyer and break room ok to Sheetrock.} ; {Activity date: 08/06/2021; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by RSALDAT1 - 1035, 2035, 3035, 4035. PARTIAL. Level 1. corridor 3104, 3100, training room 3114, 3105, galley 3116, conference room 3112, 3109, AV room 3126, multi-purpose room 3111, huddle room 3106, lobby 3115.
Level 2. Open office 3213, 3212, breakroom 3202. Restroom 3203, 3204. Corridor 3205, storage room 3211,} ; {Activity date: 05/13/2021; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by VLEON1 - PARTIAL Second level of. Connection Building rough frame progress inspected. Note: brace top plates of interior walls every 48".} ; {Activity date: 03/25/2021; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by VLEON1 - Partial, Attachment of Pre fab Exterior panels to structure on West side 1st and 2nd floor ok to proceed with installation.}
12/10/2021 COT - LCME - Mechanical Above Ceiling Passed {Activity date: 12/10/2021; Status: Approved; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Approved} ; {Activity date: 11/15/2021; Status: Partial Approval; Inspector: JBURGE; Comment: Entered by RSALDAT1 - Partial, Smoke test on Hood to Grease duct connection complete ok to fire wrap.
} ; {Activity date: 11/05/2021; Status: Correction Required; Inspector: DMUNIZ; Comment: Entered by RSALDAT1 - ) corrections required, smoke test on Hood to duct connection failed. Multiple locations where welds are incorrect, repair, re-test and call in inspection when corrections are complete.

} ; {Activity date: 11/04/2021; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Partial, no inspection required today, contractor rescheduled.see previous notes.} ; {Activity date: 08/18/2021; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by VVERA1 - PARTIAL, Above ceiling in Office Building 2nd floor inspected. Note: install seismic tie for all mechanical fixtures in acoustic ceiling locations. Check interconnections for all rigid to flex duct connections. Properly band where needed.}
12/10/2021 COT - LCBU - Firewall/Fire Barrier/Firestop Passed {Activity date: 12/10/2021; Status: Approved; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Approved} ; {Activity date: 08/20/2021; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Partial, FIRE seal complete outside stairwell 2nd floor.
}
12/10/2021 COT - LCME - Kitchen Hood Passed {Activity date: 12/10/2021; Status: Approved; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Approved} ; {Activity date: 09/21/2021; Status: Correction Required; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Corrections required, Smoke test failed @ interconnection points from Hood to grease duct. I am requesting that a different design be applied to this system to meet manufacturers, air flow & slope requirements.} ; {Activity date: 09/17/2021; Status: Correction Required; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - corrections required, Leak detected on East hood/Duct connection, repair and retest.
} ; {Activity date: 08/18/2021; Status: Correction Required; Inspector: DMUNIZ; Comment: Entered by VVERA1 - corrections required, Install steel fabricated interconnection from hood to duct. Provide manufacturer recommended smoke test. Tilt exhaust cap to drain properly.}
12/10/2021 COT - LCEL - Outdoor Lighting Passed {Activity date: 12/10/2021; Status: Approved; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Approved}
12/10/2021 COT - LCBU - Preslab Passed {Activity date: 12/10/2021; Status: Approved; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Approved}
12/10/2021 COT - LCPL - Plumbing Above Ceiling Passed {Activity date: 12/10/2021; Status: Approved; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Approved} ; {Activity date: 11/01/2021; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Partial , HOT & COLD lines above Kitchen areas tested & ok to to insulate.

}
12/10/2021 COT - LCPL - Rough Soil Passed {Activity date: 12/10/2021; Status: Approved; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Approved}
12/10/2021 COT - LCME - Mechanical Intermediate Passed {Activity date: 12/10/2021; Status: Approved; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Approved} ; {Activity date: 08/18/2021; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Partial, see 4050 notes.} ; {Activity date: 08/17/2021; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Partial, contractor rescheduled see previous notes} ; {Activity date: 08/06/2021; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by RSALDAT1 - 1035, 2035, 3035, 4035. PARTIAL. Level 1. corridor 3104, 3100, training room 3114, 3105, galley 3116, conference room 3112, 3109, AV room 3126, multi-purpose room 3111, huddle room 3106, lobby 3115.
Level 2. Open office 3213, 3212, breakroom 3202. Restroom 3203, 3204. Corridor 3205, storage room 3211,} ; {Activity date: 07/29/2021; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by RSALDAT1 - Partial, first floor connection building supply duct pressure test complete.} ; {Activity date: 07/21/2021; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by RSALDAT1 - Partial, Hydro test at 150psi approved on all hydro piping systems.

} ; {Activity date: 07/12/2021; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by RSALDAT1 - Partial, second floor med/hi pressure duct system tested and approved ok to insulate.
} ; {Activity date: 06/25/2021; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by VLEON1 - PARTIAL, 2nd floor low/med pressure duct system installed & ok to insulate.}
12/10/2021 COT - LCBU - Roof Nailing Passed {Activity date: 12/10/2021; Status: Approved; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Approved}
12/10/2021 COT - LCPL - Sewer Passed {Activity date: 12/10/2021; Status: Approved; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Approved}
12/10/2021 COT - LCEL - Grounding/Bonding Passed {Activity date: 12/10/2021; Status: Approved; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Approved} ; {Activity date: 11/08/2021; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Partial, 20’ EGC installed at 3 plaza light pole bases and ok for concrete placement.}
12/10/2021 COT - LCBU - Masonry Pregrout Passed {Activity date: 12/10/2021; Status: Approved; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Approved}
12/10/2021 COT - HCBU - Interior Shear Bracing Passed {Activity date: 12/10/2021; Status: Approved; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Approved} ; {Activity date: 05/13/2021; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by VLEON1 - PARTIAL, second level of Connection building sheetrock top out on one side complete ok to proceed.

}
12/14/2021 PDSD Site/Engineering Division - Landscaping Passed {Activity date: 12/14/2021; Status: Approved; Inspector: DROBERTS; Comment: Entered by VVERA1 - IS APPROVED}
12/14/2021 PDSD Site/Engineering Division - NPPO Passed {Activity date: 12/14/2021; Status: Approved; Inspector: DROBERTS; Comment: Entered by VVERA1 - IS APPROVED}
12/14/2021 TRSP - ROW - Final/Close-Out Passed {Activity date: 12/14/2021; Status: Approved; Inspector: ROBERTSON; Comment: Entered by DROBERT1 - INSPECTED BY BELL MONG: NO ROW IMPACT. OK TO APPROVE.}
12/14/2021 COT - FCON - Sprinkler - Final Passed {Activity date: 12/14/2021; Status: Approved; Inspector: jfordney; Comment: Entered by JFORDNE1 - } ; {Activity date: 12/10/2021; Status: Partial Approval; Inspector: jfordney; Comment: Entered by JFORDNE1 - }
12/14/2021 COT - LCBU - Exterior Clips/Sheathing Passed {Activity date: 12/14/2021; Status: Approved; Inspector: DMUNIZ; Comment: Entered by RSALDAT1 - Approved} ; {Activity date: 03/25/2021; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by VLEON1 - Partial, Pre fab Exterior panels on West side 1st and 2nd floor installed.}
12/14/2021 PDSD Building Division - Sign Final Passed {Activity date: 12/14/2021; Status: Approved; Inspector: DROBERTS; Comment: Entered by VVERA1 - IS APPROVED}
03/29/2022 COT - FCON - Alarm - Final Passed {Activity date: 03/29/2022; Status: Approved; Inspector: jfordney; Comment: Entered by JFORDNE1 - } ; {Activity date: 03/29/2022; Status: Approved; Inspector: jfordney; Comment: Entered by JFORDNE1 - } ; {Activity date: 12/29/2021; Status: Partial Approval; Inspector: jfordney; Comment: Entered by JFORDNE1 - ROC
Test point report
Tie in with ansul} ; {Activity date: 12/10/2021; Status: Partial Approval; Inspector: jfordney; Comment: Entered by JFORDNE1 - notification on second floor approved}
03/29/2022 COT - FCON - Fire - Final Passed {Activity date: 03/29/2022; Status: Approved; Inspector: jfordney; Comment: Entered by JFORDNE1 - } ; {Activity date: 12/29/2021; Status: Partial Approval; Inspector: jfordney; Comment: Entered by JFORDNE1 - Ok to obtain TCO for everything except kitchen
KITCHEN AND ALL RELATED APPLIANCES ARE NOT TO BE USED} ; {Activity date: 12/14/2021; Status: Partial Approval; Inspector: jfordney; Comment: Entered by JFORDNE1 - 2nd floor ONLY approved to obtain TCO}
03/29/2022 COT - FCON - Hood System - Final Passed {Activity date: 03/29/2022; Status: Approved; Inspector: jfordney; Comment: Entered by JFORDNE1 - } ; {Activity date: 02/17/2022; Status: Partial Approval; Inspector: Jfordney; Comment: Entered by JFORDNE1 - Need picture of one appliance moved back under hood.} ; {Activity date: 12/29/2021; Status: Not ready for Inspection; Inspector: jfordney; Comment: Entered by JFORDNE1 - }
04/06/2022 COT - LCME - Mechanical Final Passed {Activity date: 04/06/2022; Status: Approved; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Approved} ; {Activity date: 01/03/2022; Status: Partial Approval; Inspector: RSHERRY; Comment: Entered by RSHERRY1 - REVIEW OF PRELIMINARY AIR BALANCE REPORT COMPLETED. kITCHEN, AC-1, AC-2 & IU-1 NOT COMPLETED} ; {Activity date: 12/30/2021; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Partial, field inspections complete for 1st floor TCO. (Except kitchen Area, pending full Fire approval of ANSIL system and Kitchen hood.)} ; {Activity date: 12/29/2021; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by VVERA1 - PARTIAL, AIR balance report submitted for 1st floor approval.
} ; {Activity date: 12/22/2021; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Partial, Approved for TCO, full use of 2nd floor only.} ; {Activity date: 12/15/2021; Status: Partial Approval; Inspector: RSHERRY; Comment: Entered by RSHERRY1 - REVIEW OF AIR BALANCE REPORT FOR 2ND FLOOR COMPLETED} ; {Activity date: 12/14/2021; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by RSALDAT1 - Partial, 2nd floor Approved for TCO, Air balance report submitted for approval.} ; {Activity date: 12/10/2021; Status: Not ready for Inspection; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Not Ready, provide air balance report prior to finals.}
04/06/2022 COT - LCEL - Electrical Final Passed {Activity date: 04/06/2022; Status: Approved; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Approved} ; {Activity date: 12/30/2021; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Partial, field inspections complete for 1st floor TCO. (Except kitchen Area.)} ; {Activity date: 12/22/2021; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Partial, Approved for TCO, full use of 2nd floor only.} ; {Activity date: 12/14/2021; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by RSALDAT1 - Partial, 2nd floor egress, Emergency lighting, & Elevator ok for TCO.} ; {Activity date: 12/10/2021; Status: Not ready for Inspection; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Not Ready, EM and egress lighting not working.}
04/06/2022 ENGR Engineering Final Passed {Activity date: 04/06/2022; Status: Approved; Inspector: MHERNANDEZ; Comment: Entered by VVERA1 - APPROVED.

} ; {Activity date: 03/01/2022; Status: Partial Approval; Inspector: MHERNANDEZ; Comment: Entered by NGARCIA3 - PARTIAL / OK FOR T C O .NEED TO STAKES AND OND ONE SCUPPER NEED TO BE FINISHED.} ; {Activity date: 12/14/2021; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by VVERA1 - IS PARTIAL, OK FOR TCO FOR OCCUPANCY
}
04/06/2022 COT - LCPL - Plumbing Final Passed {Activity date: 04/06/2022; Status: Approved; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Approved} ; {Activity date: 01/13/2022; Status: Prior to Final Inspectn; Inspector: NGARCIA; Comment: Entered by NGARCIA3 - sewer receipt required prior to final inspection} ; {Activity date: 12/30/2021; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by NGARCIA3 - Partial, field inspections complete for 1st floor TCO. (Except kitchen Area.} ; {Activity date: 12/29/2021; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by VVERA1 - PARTIAL, See previous notes.} ; {Activity date: 12/22/2021; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Partial, Approved for TCO, full use of 2nd floor only.} ; {Activity date: 12/15/2021; Status: Partial Approval; Inspector: RSHERRY; Comment: Entered by RSHERRY1 - REVIEW OF WATER DISINFECTION REPORT COMPLETED} ; {Activity date: 12/14/2021; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by RSALDAT1 - Partial, 2nd floor Restrooms ok for TCO. Water chlorination report submitted for approval.} ; {Activity date: 12/10/2021; Status: Not ready for Inspection; Inspector: DMUNIZ; Comment: Entered by VVERA1 - Not Ready, missing ADA grab bars and sleeves, provide chlorination report.}

Documents

File Name Document Type  
APPLICATION REV1 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
APPLICATION 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
APPROVAL LETTER 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
CHECKLIST 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
CONECTION BUILDING_TCO_REQUEST_FORM_12.29.21 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
ENERGY ENVELOPE 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
FEES AND INSPECTIONS 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
JOB CARD 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
PERMIT 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
PLAN SET REV1 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
PLAN SET 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
SIC 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
SPEC SHEETS 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
STRUC CALCS REV1 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
STRUC CALCS 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
STRUC PLANS REV1 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
TCO 2024 MASS-UPLOAD.PDF DOCUMENTS VIEW
APPLICATION REV1.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
APPROVAL LETTER.PDF DOCUMENTS VIEW
CHECKLIST.PDF DOCUMENTS VIEW
CONECTION BUILDING_TCO_REQUEST_FORM_12.29.21.PDF DOCUMENTS VIEW
ENERGY ENVELOPE.PDF DOCUMENTS VIEW
FEES AND INSPECTIONS.PDF DOCUMENTS VIEW
JOB CARD.PDF DOCUMENTS VIEW
PERMIT.PDF DOCUMENTS VIEW
SIC.PDF DOCUMENTS VIEW
TCO.PDF DOCUMENTS VIEW
STRUC PLANS REV1.PDF DOCUMENTS VIEW
STRUC CALCS REV1.PDF DOCUMENTS VIEW
STRUC CALCS.PDF DOCUMENTS VIEW
PLAN SET REV1.PDF DOCUMENTS VIEW
PLAN SET.PDF DOCUMENTS VIEW
SPEC SHEETS.PDF DOCUMENTS VIEW