Inspection Status: Passed
Inspection History: COT - LCEL - Electrical Above Ceiling
| Date |
Description |
Inspector |
Results |
Comments |
| 12/01/2021 |
COT - LCEL - Electrical Above Ceiling |
DMUNIZ |
Approved |
Entered by RSALDAT1 - Approved |
| 10/21/2021 |
COT - LCEL - Electrical Above Ceiling |
DMUNIZ |
Partial Approval |
Entered by NGARCIA3 - ) Partial, 1st floor corridor 3104, 3110, dining 3117, training room 3114, 3108-3112, 3106, 3126, 3105. All Ok to start dropping ceiling tiles. |
| 10/04/2021 |
COT - LCEL - Electrical Above Ceiling |
TGAUSP |
Cancelled |
Entered by VVERA1 - Unable to perform inspection, cancelled by Contractor |
| 09/15/2021 |
COT - LCEL - Electrical Above Ceiling |
DMUNIZ |
Partial Approval |
Entered by RSALDAT1 - Partial, second floor Connection building ok to drop ceiling tiles in inspected areas |
| 09/10/2021 |
COT - LCEL - Electrical Above Ceiling |
DMUNIZ |
Partial Approval |
Entered by VVERA1 - Partial, see previous notes |
| 09/09/2021 |
COT - LCEL - Electrical Above Ceiling |
DMUNIZ |
Partial Approval |
Entered by NGARCIA3 - Partial, Inspection for 3110, 3104 ok to install ceiling. |
| 09/07/2021 |
COT - LCEL - Electrical Above Ceiling |
DMUNIZ |
Partial Approval |
Entered by RSALDAT1 - partial, 1st floor training room and galley soffits ok to Sheetrock.
|
| 08/31/2021 |
COT - LCEL - Electrical Above Ceiling |
DMUNIZ |
Partial Approval |
Entered by NGARCIA3 - Partial, Connections Building first floor South bathroom ok to install ceiling. |
| 08/18/2021 |
COT - LCEL - Electrical Above Ceiling |
DMUNIZ |
Partial Approval |
Entered by VVERA1 - Partial. Office building 2nd floor electrical above ceiling complete.
|