Permit: T20CM03066
Permit Details
Apply Date:
05/18/2020
Applicant:
M3 ENGINEERING & TECHNOLOGY
Description:
SCHOOL
Contractors:
- BARKER CONTRACTING INC **APA**
Permit Reviews
Permit Number - T20CM03066
Permit Status: C of o
Permit Description: SCHOOL
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
04/14/2021 | REVISION - - 1ST | 04/19/2021 | COMPLETED |
05/18/2020 | COMMERCIAL - NEW | 07/22/2020 | COMPLETED |
06/14/2021 | REVISION - - 2ND | 06/22/2021 | COMPLETED |
07/28/2020 | RESUBMITTAL | 08/31/2020 | COMPLETED |
09/10/2020 | RESUBMITTAL | 10/28/2020 | COMPLETED |
11/20/2020 | 3RD PARTY REVIEW - COMMERCIAL | 11/20/2020 | COMPLETED |
11/20/2020 | OTHER | 12/03/2020 | COMPLETED |
Completed Inspections
Permit Status: C of o
Permit Number: T20CM03066
Permit Description: SCHOOL
Total Completed Inspections - 31
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/24/2020 | MECHANICAL - FINAL | RSHERRY | Approved | AIR BALANCE REPORT REQUIRED |
11/23/2020 | PLUMBING - FINAL | RSHERRY | Approved | WATER DISINFECTION REPORT REQUIRED |
04/19/2021 | REINFORCED MASONRY PRE-GROUT | TGAUSP | Approved | Partial Approval- PA, elevator shaft and storage are complete. |
09/22/2021 | TEP CLEARANCE - PM | DMUNIZ | Approved | CODE ECO/INCR |
09/22/2021 | ELECTRIC - SERVICE UPGRADE | DMUNIZ | Approved | Approved clear TEP ECO/INCR ok to energize NEW 2500 AMP SES, and re feed existing SES. |
10/18/2021 | BUILDING - PROGRESS | DMUNIZ | Approved | Partial, construction meeting for upcoming power kill and transfer of power from existing SES to new SES. No inspection required today. |
10/19/2021 | ELECTRIC - UNDERGROUND | TGAUSP | Approved | Partial for underground from 2nd light pole on the north end approx 400’ long due south (west parking lot) |
10/25/2021 | ELECTRIC - OUTDOOR LIGHTING | DMUNIZ | Approved | Partial, South parking lot, Two caissons for light poles with 20’ GEC ok for concrete placement. |
12/01/2021 | ELECTRIC - ABOVE CEILING | TGAUSP | Approved | Partial for exterior South wall, grid E to grid 1-4 and approximately 20’ at North wall at grid A, okay to cover progress areas |
12/07/2021 | PLUMBING - ROOF DRAINS | TGAUSP | Approved | Partial approval for drains at grid lines A to B, okay to cover progress areas |
12/23/2021 | ELECTRIC - INTERMEDIATE | TGAUSP | Approved | Partial for Gridline B - 1 through 7.E3 and Gridline D - 1 through 7.E3 |
12/23/2021 | FRAMING | TGAUSP | Approved | Partial for Gridline B - 1 through 7.E3 and Gridline D - 1 through 7.E3 |
03/03/2022 | PLUMBING - GAS PRESSURE TEST | DMUNIZ | Approved | Approved, inspection of gas line and pressure test complete. |
05/09/2022 | MECHANICAL - INTERMEDIATE | TGAUSP | Approved | Approved, pending above ceiling |
05/09/2022 | PLUMBING - INTERMEDIATE | TGAUSP | Approved | Approved, pending above ceiling |
08/02/2022 | OUTDOOR LIGHTING FINAL | ESTEVENS | Approved | Approved |
08/03/2022 | STUCCO MESH | DMUNIZ | Approved | Approved |
08/03/2022 | U VALUE FOR WINDOW | DMUNIZ | Approved | Approved |
08/03/2022 | ROOF NAILING | DMUNIZ | Approved | Approved |
08/03/2022 | BUILDING ABOVE CEILING | DMUNIZ | Approved | Approved |
08/03/2022 | EXT METAL CLIPS/EXT SHEATHING | DMUNIZ | Approved | Approved |
08/03/2022 | PLUMBING - ROUGH, SOIL | DMUNIZ | Approved | Approved |
08/03/2022 | ELECTRIC - UFER | DMUNIZ | Approved | Approved |
08/03/2022 | ELECTRIC - CABLE DROP | DMUNIZ | Approved | Not Applicable. |
08/03/2022 | MECHANICAL - HOOD SYSTEMS | DMUNIZ | Approved | Not Applicable. |
08/23/2022 | ELECTRIC - FINAL | ESTEVENS | Approved | Approved |
08/23/2022 | FIREWALL/FIREBARRIER/FIRESTOP | ESTEVENS | Approved | Approved |
08/29/2022 | FIRE - FINAL | ESTEVENS | Approved | Approved by STATE FIRE MARSHAL |
08/29/2022 | ENGINEERING - FINAL | ESTEVENS | Approved | Approved. See DEVELOPMENT PLAN DP20-0061. |
09/01/2022 | CERTIFICATE OF OCCUPANCY | ESTEVENS | Approved | |
09/01/2022 | BUILDING - FINAL | ESTEVENS | Approved |