Permit Details

Status:
C of o
Type:
COMMERCIAL ALTERATION
Address:
7211 S PARK AV
Apply Date:
05/18/2020
Applicant:
M3 ENGINEERING & TECHNOLOGY
Description:
SCHOOL
Contractors:
  • BARKER CONTRACTING INC **APA**

Permit Reviews

Permit Number - T20CM03066
Permit Status: C of o
Permit Description: SCHOOL
Start Date Submittal Complete Date Status  
04/14/2021 REVISION - - 1ST 04/19/2021 COMPLETED Review Details
05/18/2020 COMMERCIAL - NEW 07/22/2020 COMPLETED Review Details
06/14/2021 REVISION - - 2ND 06/22/2021 COMPLETED Review Details
07/28/2020 RESUBMITTAL 08/31/2020 COMPLETED Review Details
09/10/2020 RESUBMITTAL 10/28/2020 COMPLETED Review Details
11/20/2020 3RD PARTY REVIEW - COMMERCIAL 11/20/2020 COMPLETED Review Details
11/20/2020 OTHER 12/03/2020 COMPLETED Review Details

Completed Inspections

Permit Status: C of o
Permit Number: T20CM03066
Permit Description: SCHOOL
Total Completed Inspections - 31
Date Description Inspector Results Comments
09/24/2020 MECHANICAL - FINAL RSHERRY Approved AIR BALANCE REPORT REQUIRED
11/23/2020 PLUMBING - FINAL RSHERRY Approved WATER DISINFECTION REPORT REQUIRED
04/19/2021 REINFORCED MASONRY PRE-GROUT TGAUSP Approved Partial Approval- PA, elevator shaft and storage are complete.
09/22/2021 TEP CLEARANCE - PM DMUNIZ Approved CODE ECO/INCR
09/22/2021 ELECTRIC - SERVICE UPGRADE DMUNIZ Approved Approved clear TEP ECO/INCR ok to energize NEW 2500 AMP SES, and re feed existing SES.
10/18/2021 BUILDING - PROGRESS DMUNIZ Approved Partial, construction meeting for upcoming power kill and transfer of power from existing SES to new SES. No inspection required today.
10/19/2021 ELECTRIC - UNDERGROUND TGAUSP Approved Partial for underground from 2nd light pole on the north end approx 400’ long due south (west parking lot)
10/25/2021 ELECTRIC - OUTDOOR LIGHTING DMUNIZ Approved Partial, South parking lot, Two caissons for light poles with 20’ GEC ok for concrete placement.
12/01/2021 ELECTRIC - ABOVE CEILING TGAUSP Approved Partial for exterior South wall, grid E to grid 1-4 and approximately 20’ at North wall at grid A, okay to cover progress areas
12/07/2021 PLUMBING - ROOF DRAINS TGAUSP Approved Partial approval for drains at grid lines A to B, okay to cover progress areas
12/23/2021 ELECTRIC - INTERMEDIATE TGAUSP Approved Partial for Gridline B - 1 through 7.E3 and Gridline D - 1 through 7.E3
12/23/2021 FRAMING TGAUSP Approved Partial for Gridline B - 1 through 7.E3 and Gridline D - 1 through 7.E3
03/03/2022 PLUMBING - GAS PRESSURE TEST DMUNIZ Approved Approved, inspection of gas line and pressure test complete.
05/09/2022 MECHANICAL - INTERMEDIATE TGAUSP Approved Approved, pending above ceiling
05/09/2022 PLUMBING - INTERMEDIATE TGAUSP Approved Approved, pending above ceiling
08/02/2022 OUTDOOR LIGHTING FINAL ESTEVENS Approved Approved
08/03/2022 STUCCO MESH DMUNIZ Approved Approved
08/03/2022 U VALUE FOR WINDOW DMUNIZ Approved Approved
08/03/2022 ROOF NAILING DMUNIZ Approved Approved
08/03/2022 BUILDING ABOVE CEILING DMUNIZ Approved Approved
08/03/2022 EXT METAL CLIPS/EXT SHEATHING DMUNIZ Approved Approved
08/03/2022 PLUMBING - ROUGH, SOIL DMUNIZ Approved Approved
08/03/2022 ELECTRIC - UFER DMUNIZ Approved Approved
08/03/2022 ELECTRIC - CABLE DROP DMUNIZ Approved Not Applicable.
08/03/2022 MECHANICAL - HOOD SYSTEMS DMUNIZ Approved Not Applicable.
08/23/2022 ELECTRIC - FINAL ESTEVENS Approved Approved
08/23/2022 FIREWALL/FIREBARRIER/FIRESTOP ESTEVENS Approved Approved
08/29/2022 FIRE - FINAL ESTEVENS Approved Approved by STATE FIRE MARSHAL
08/29/2022 ENGINEERING - FINAL ESTEVENS Approved Approved. See DEVELOPMENT PLAN DP20-0061.
09/01/2022 CERTIFICATE OF OCCUPANCY ESTEVENS Approved
09/01/2022 BUILDING - FINAL ESTEVENS Approved

Documents

File Name Document Type  
APPLICATION.PDF DOCUMENTS VIEW
COMCHECK ENVELOPE.PDF DOCUMENTS VIEW
FINAL SIC.PDF DOCUMENTS VIEW
FIRE ALARM FINAL.PDF DOCUMENTS VIEW
GCL REV2.PDF DOCUMENTS VIEW
PLAN SET.PDF DOCUMENTS VIEW
REV2 APPLICATION.PDF DOCUMENTS VIEW
REV2 C OF O.PDF DOCUMENTS VIEW
REV2 JOB CARD.PDF DOCUMENTS VIEW
REV2 PERMIT.PDF DOCUMENTS VIEW
REV2 PLAN SET.PDF DOCUMENTS VIEW
REV2 STRUCTURAL CALCULATIONS.PDF DOCUMENTS VIEW
REV2 TCO.PDF DOCUMENTS VIEW
REVISION TO INSULATION.PDF DOCUMENTS VIEW
SIL_PART1.PDF DOCUMENTS VIEW
SIL_PART2.PDF DOCUMENTS VIEW
SIL_PART3.PDF DOCUMENTS VIEW
T20CM03066.PDF DOCUMENTS VIEW
TAB.PDF DOCUMENTS VIEW
WATER CHLORINATION.PDF DOCUMENTS VIEW