Permit Details

Status:
Expired
Type:
Commercial Building
Apply Date:
05/13/2020
Applicant:
Description:
FOUNDATION ONLY & UNDERGROUND UTILITY'SFOR THE HOSPITAL

Permit Reviews

Permit Number - T20CM02980
Permit Status: Expired
Permit Description: FOUNDATION ONLY & UNDERGROUND UTILITY'SFOR THE HOSPITAL
Start Date Submittal Complete Date Status  
05/13/2020 COMMERCIAL - NEW 05/28/2020 COMPLETED Review Details
05/28/2020 RESUBMITTAL 06/01/2020 COMPLETED Review Details

Outstanding Activity Conditions

Permit Number - T20CM02980
Permit Status: Expired
Permit Description: FOUNDATION ONLY & UNDERGROUND UTILITY'SFOR THE HOSPITAL
Total Outstanding Activity Conditions - 8
Date Name
05/13/2020 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.
05/15/2020 SPECIAL INSPECTION FORMS AND REPORTS REQUIRED PRIOR TO ISSUANCE OF A CERTIFICATE OF OCCUPANCY.
05/15/2020 SPECIAL INSPECTION FOR CONCRETE IS REQUIRED..
05/15/2020 SPECIAL INSPECTION FOR BOLTS INSTALLED IN CONCRETE IS REQUIRED.
05/15/2020 SPECIAL INSPECTION FOR REINFORCING STEEL AND/OR PRE-STRESSING TENDONS IS REQUIRED.
05/15/2020 SPECIAL INSPECTION FOR STRUCTURAL MASONRY IS REQUIRED.
05/15/2020 SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED.
05/15/2020 SPECIAL INSPECTION FOR FOUNDATION/EXCAVATION IS REQUIRED.

Outstanding Inspections

Permit Status: Expired
Permit Number: T20CM02980
Permite Description: FOUNDATION ONLY & UNDERGROUND UTILITY'SFOR THE HOSPITAL
Total Outstanding Inspections - 11
Last Inspection Date Description Inspector Results Comments
12/10/2021 COT - LCBU - Stem Wall/Retaining Wall N/A Canceled {Activity date: 12/10/2021; Status: Not Applicable; Inspector: ESTEVENS; Comment: Entered by VVERA1 - 1090. N/A. See permit number T19CM05078.

Close permit} ; {Activity date: 04/12/2021; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by RSALDAT1 - 5th lift, top-out on retaining wall.} ; {Activity date: 04/09/2021; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by RSALDAT1 - Partial. 4th lift, 9 to 12 feet.} ; {Activity date: 04/06/2021; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by VLEON1 - Partial. Southside retaining wall. From 6 feet to 9 feet with mesh matting.} ; {Activity date: 04/02/2021; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by RSALDAT1 - Partial. Second lift to 6 feet in height with mesh
} ; {Activity date: 03/31/2021; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by VLEON1 - Partial. Retaining wall on south side of property, from stone footing approximately 5 feet high with drainage pipes and mesh.}
12/10/2021 COT - LCBU - Building Final N/A Canceled {Activity date: 12/10/2021; Status: Not Applicable; Inspector: ESTEVENS; Comment: Entered by VVERA1 - N/A. See permit number T19CM05078.

Close permit}
12/10/2021 COT - LCBU - Framing N/A Canceled {Activity date: 12/10/2021; Status: Not Applicable; Inspector: ESTEVENS; Comment: Entered by VVERA1 - N/A. See permit number T19CM05078.

Close permit}
12/10/2021 COT - LCBU - Excavation/Rebar/Zoning N/A Canceled {Activity date: 12/10/2021; Status: Not Applicable; Inspector: ESTEVENS; Comment: Entered by VVERA1 - 1090. N/A. See permit number T19CM05078.

Close permit} ; {Activity date: 05/10/2021; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by RSALDAT1 - 1020 Grout. East side column. 5th lift. 16 to 20 feet. Top-out

} ; {Activity date: 03/01/2021; Status: Partial Approval; Inspector: TTREMBULAK; Comment: Entered by VLEON1 - Partial. Slab on grade area D, between grid lines 10-15, & G-K.} ; {Activity date: 02/22/2021; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by VLEON1 - Partial. Slab on grade for the following rooms, CT scan GEN rad, RF room, MRI, Cath lab, fire pump room.

} ; {Activity date: 02/19/2021; Status: Cancelled; Inspector: ESTEVENS; Comment: Entered by VLEON1 - CANCELLED BY CONTRACTOR} ; {Activity date: 02/12/2021; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by VLEON1 - PARTIAL, SLAB ON GRADE AREA B IS COMPLETE} ; {Activity date: 01/28/2021; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by VLEON1 - PARTIAL SLAB ON GRADE, NORTH WEST HALF OF SLAB IN AREA C} ; {Activity date: 01/12/2021; Status: Cancelled; Inspector: ESTEVENS; Comment: Entered by VLEON1 - CANCELLED} ; {Activity date: 01/08/2021; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by RSALDAT1 - Partial. Area A, north west section. Slab on grade.} ; {Activity date: 01/06/2021; Status: Cancelled; Inspector: ESTEVENS; Comment: Entered by VLEON1 - } ; {Activity date: 12/29/2020; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by VLEON1 - Partial. The west column of the ambulance canopy.

} ; {Activity date: 12/22/2020; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by RSALDAT1 - Partial. CEP area. 7th lift, 24 feet to top-out.} ; {Activity date: 12/15/2020; Status: Not ready for Inspection; Inspector: ESTEVENS; Comment: Entered by VLEON1 - NOT READY} ; {Activity date: 12/02/2020; Status: Not ready for Inspection; Inspector: ESTEVENS; Comment: Entered by PAHUMAD1 - Not ready.} ; {Activity date: 11/25/2020; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by RSALDAT1 - Partial. CEP area. 4th lift.} ; {Activity date: 11/19/2020; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by PAHUMAD1 - Partial. CEP area. Gridlines B-9 thru 14.5. Gridlines AA-11 thru 14.9, Gridlines 13.3-AA to B, gridlines 14.5-AA to B.} ; {Activity date: 11/16/2020; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by RSALDAT1 - Partial. CEP area, 2nd lift to 8 feet.} ; {Activity date: 11/05/2020; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by PAHUMAD1 - Partial. CEP area, fire riser room 1st lift.} ; {Activity date: 10/29/2020; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by RSALDAT1 - Partial. Stairwell #1, Lift 11, 40-44 feet. Stairwell #2, Lift 10, 36-40 feet.} ; {Activity date: 10/28/2020; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by RSALDAT1 - Stairwell #1, Lift 10, 36-40 feet. Stairwell #2, lift 9, 32-36 feet.} ; {Activity date: 10/27/2020; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by RSALDAT1 - Partial. Stairwell #1, lift 9, 32-36 feet. Stairwell #2, lift 8, 2832 feet.} ; {Activity date: 10/26/2020; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by RSALDAT1 - Partial. Stairwell 1, lift 8, 28-32 feet. Stairwell 2, lift 7, 24-28 feet.} ; {Activity date: 10/23/2020; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by RSALDAT1 - Partial. Stairwell #1, Lift 7, 24 to 28 feet. Stairwell #2, Lift 6, 20 to 24 feet.} ; {Activity date: 10/21/2020; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by RSALDAT1 - Partial. Stairwell 1, Lift number 4, 13 to 16 feet. Stairwell 2, Lift number 5, 16 to 20 feet.} ; {Activity date: 10/19/2020; Status: Partial Approval; Inspector: DQUINN; Comment: Entered by RSALDAT1 - pa

Stairwells # 1 2 ok to grout 4th lift} ; {Activity date: 10/15/2020; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by RSALDAT1 - Partial. Stairwell 1&2, 3rd lift, 8 to 12 feet.} ; {Activity date: 10/14/2020; Status: Cancelled; Inspector: ESTEVENS; Comment: Entered by JSCHNEI2 - Cancel} ; {Activity date: 10/13/2020; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by JSCHNEI2 - Partial. Stairwell number one and number two, 2nd lift, 4 to 8 feet.

Block wall, gridlines AA-11 to AA-14.5} ; {Activity date: 10/12/2020; Status: Partial Approval; Inspector: JBURGE; Comment: Entered by VFLORES1 - Stem wall at 0"-24" for electric room and riser room. Ok to grout progress areas.} ; {Activity date: 10/09/2020; Status: Not ready for Inspection; Inspector: ESTEVENS; Comment: Entered by JSCHNEI2 - Not ready.} ; {Activity date: 10/08/2020; Status: Not ready for Inspection; Inspector: ESTEVENS; Comment: Entered by VFLORES1 - } ; {Activity date: 10/07/2020; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by JSCHNEI2 - Partial. Block wall, gridlines B-13.3 to F-13.3. Gridlines B-13.3 to B-12. Gridlines A-8 to A-9, A-9 to B-9, 1st lift, 4feet.} ; {Activity date: 10/02/2020; Status: Partial Approval; Inspector: TTREMBULAK; Comment: Entered by JSCHNEI2 - Partial approval. Stairwell number three (west side) final lift @ 44’-48’.} ; {Activity date: 10/01/2020; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by RSALDAT1 - Partial. Stairwell number three, 11th lift 36 to 40 feet. Stairwell number four, 11th lift, top out} ; {Activity date: 09/30/2020; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by RSALDAT1 - Partial. Stairwell number four, lift number 11, 36 to 40 feet. Stairwell number three, lift number 10, 32 to 36 feet.} ; {Activity date: 09/29/2020; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by RSALDAT1 - Partial. Stairwell number three, ninth lift, 32 to 36 feet. Stairwell number four, 10th lift, 36 to 40 feet.} ; {Activity date: 09/28/2020; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by RSALDAT1 - Stairwell number one, first lift, 0 to 4 feet. Stairwell number two, first left, 0 to 4 feet. Stairwell number three, eighth left, 28 to 32 feet. Stairwell number four, ninth lift, 32 to 36 feet} ; {Activity date: 09/25/2020; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by RSALDAT1 - Partial. Stairwell number four, eighth lift, 28 to 32 feet} ; {Activity date: 09/24/2020; Status: Partial Approval; Inspector: STEVENS; Comment: Entered by JSCHNEI2 - Partial. Stairwell number four, lift number eight, 28 to 32 feet. Stairwell number three, lift number seven, 24 to 28 feet.
} ; {Activity date: 09/23/2020; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by RSALDAT1 - Partial. Stairwell number three, lift number six, 20 to 24 feet. Stairwell number four, lift number seven, 24 to 28 feet.

} ; {Activity date: 09/22/2020; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by RSALDAT1 - Partial. Stairwell number three. Fifth lift, 16 to 20 feet. Stairwell number four, sixth lift 20 to 24 feet. Elevators third floor, east and west side.} ; {Activity date: 09/21/2020; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by JSCHNEI2 - Partial. Stairwell #3, 5th lift, 16-20feet. Stairwell #4, 4th lift, 12-16 feet. Concrete block wall from B-9 to B-13.2. 1st lift, 0-4 feet.

} ; {Activity date: 09/18/2020; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by JSCHNEI2 - Partial. Level 3, Rebar between elevators.} ; {Activity date: 09/17/2020; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by RSALDAT1 - Partial. Stairwell #4, 3rd lift, 8 to 12 feet.} ; {Activity date: 09/16/2020; Status: Partial Approval; Inspector: ESTEVENS; Comment: Enter
12/10/2021 COT - LCBU - Preslab N/A Canceled {Activity date: 12/10/2021; Status: Not Applicable; Inspector: ESTEVENS; Comment: Entered by VVERA1 - 1090. N/A. See permit number T19CM05078.

Close permit} ; {Activity date: 03/01/2021; Status: Partial Approval; Inspector: TTREMBULAK; Comment: Entered by VLEON1 - Partial. Plumbing stub-ups and electric conduit, area D, 10-15 & G-K.} ; {Activity date: 02/08/2021; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by VLEON1 - PARTIAL, SLAB ON GRADE IN AREA C AND MRI ROOM} ; {Activity date: 12/23/2020; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by RSALDAT1 - Partial. South side of area B.} ; {Activity date: 12/09/2020; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by PAHUMAD1 - Partial. Slab on grade in Area A. from A-7 to A-8, B-6 to B-5 to D-5.} ; {Activity date: 10/23/2020; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by RSALDAT1 - Partial. CEP area slab.}
12/10/2021 COT - LCEL - Electrical Final N/A Canceled {Activity date: 12/10/2021; Status: Not Applicable; Inspector: ESTEVENS; Comment: Entered by VVERA1 - N/A. See permit number T19CM05078.

Close permit}
12/10/2021 PDSD Building Division Pre-Construction Meeting N/A Canceled {Activity date: 12/10/2021; Status: Not Applicable; Inspector: ESTEVENS; Comment: Entered by VVERA1 - N/A. See permit number T19CM05078.

Close permit}
12/10/2021 COT - HCBU - Exterior Clips/Sheathing N/A Canceled {Activity date: 12/10/2021; Status: Not Applicable; Inspector: ESTEVENS; Comment: Entered by VVERA1 - N/A. See permit number T19CM05078.

Close permit}
12/10/2021 COT - LCPL - Plumbing Final N/A Canceled {Activity date: 12/10/2021; Status: Not Applicable; Inspector: ESTEVENS; Comment: Entered by VVERA1 - N/A. See permit number T19CM05078.

Close permit}
12/10/2021 COT - LCEL - Grounding/Bonding N/A Canceled {Activity date: 12/10/2021; Status: Not Applicable; Inspector: ESTEVENS; Comment: Entered by VVERA1 - N/A. See permit number T19CM05078.

Close permit}
12/10/2021 COT - LCBU - Masonry Pregrout N/A Canceled {Activity date: 12/10/2021; Status: Not Applicable; Inspector: ESTEVENS; Comment: Entered by VVERA1 - 1090 N/A. See permit number T19CM05078.

Close permit} ; {Activity date: 05/10/2021; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by RSALDAT1 - Grout. East side column. 5th lift. 16 to 20 feet. Top-out

} ; {Activity date: 03/23/2021; Status: Not ready for Inspection; Inspector: JBURGE; Comment: Entered by RSALDAT1 - Not ready. Contractor cancelled.} ; {Activity date: 03/22/2021; Status: Cancelled; Inspector: IVR USER; Comment: Entered by IVR USER - IVRS - AP canceled} ; {Activity date: 01/14/2021; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by VLEON1 - PARTIAL, AMBULANCE CANOPY 5TH LIFT, AH TO 20 FEET TOP-OUT} ; {Activity date: 01/13/2021; Status: Cancelled; Inspector: IVR USER; Comment: Entered by IVR USER - IVRS - AP canceled} ; {Activity date: 01/13/2021; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by VLEON1 - PARTIAL, AMBULANCE CANOPY. 4TH LIFT 12 TO 16 FEET.} ; {Activity date: 01/12/2021; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by VLEON1 - PARTIAL, CEP AREA. FIRE RISER, MEDICAL GAS AND ELECTRICAL ROOM. 7TH LIFT. 24 TO 29 FEET, TOP OUT.} ; {Activity date: 01/12/2021; Status: Cancelled; Inspector: IVR USER; Comment: Entered by IVR USER - IVRS - AP canceled} ; {Activity date: 01/11/2021; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by VLEON1 - Partial. CEP Area, fire riser, med gas rooms, 6 th lift, 20tp 24 feet.} ; {Activity date: 01/08/2021; Status: Cancelled; Inspector: IVR USER; Comment: Entered by IVR USER - IVRS - AP canceled} ; {Activity date: 01/08/2021; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by VLEON1 - Partial. CEP area. Fire riser, med gas and electrical rooms, 5th lift, 16 to 20 feet. Ambulance canopy, 3rd lift, 8 to 12 feet.} ; {Activity date: 01/07/2021; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by VLEON1 - Partial. CEP area, fire riser, med gas and electrical rooms, fourth lift, 12 to 16 feet.} ; {Activity date: 01/06/2021; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by VLEON1 - Partial. CEP area, fire riser, med gas and electrical rooms, 3rd lift, 8 to 12 feet

} ; {Activity date: 12/31/2020; Status: Cancelled; Inspector: IVR USER; Comment: Entered by IVR USER - IVRS - AP canceled} ; {Activity date: 12/18/2020; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by RSALDAT1 - Partial. CEP area south side 20 to 24 feet.} ; {Activity date: 10/30/2020; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by ESTEVEN1 - Partial. Stairwell #2, Lift 11, 40-44 feet.} ; {Activity date: 12/15/2020; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by VLEON1 - Partial. CEP. Area. Exterior and interior walls. 5th lift, 16 to 20 feet.} ; {Activity date: 12/11/2020; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by PAHUMAD1 - Partial. CEP area. Wall of column line B-11 thru 14.5.} ; {Activity date: 12/10/2020; Status: Cancelled; Inspector: IVR USER; Comment: Entered by IVR USER - IVRS - AP canceled} ; {Activity date: 12/02/2020; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by PAHUMAD1 - Partial. CEP area, lift 4, 15 to 20 feet.

} ; {Activity date: 10/22/2020; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by PAHUMAD1 - Partial. Stairwell #1, Lift 6, 20 to 24 feet. Stairwell #2, Lift 5, 16 to 20 feet. Masonry walls at CEP area, chillers, generator, fire riser rooms, 1st lift.

} ; {Activity date: 10/09/2020; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by JSCHNEI2 - Grout. 1st lift around chiller room, boiler room, fire pump room, med gas, and electrical room.} ; {Activity date: 09/10/2020; Status: Approved; Inspector: ESTEVENS; Comment: Entered by JSCHNEI2 - Partial. Stairwell number four, first lift, 0 to4 feet. Stairwell number three, first lift, 0 to 4 feet.}

Completed Inspections

Permit Status: Expired
Permit Number: T20CM02980
Permit Description: FOUNDATION ONLY & UNDERGROUND UTILITY'SFOR THE HOSPITAL
Total Completed Inspections - 10
Date Description Inspector Results Comments
12/10/2021 COT - LCEL - Electrical Underground Passed {Activity date: 12/10/2021; Status: Approved; Inspector: ESTEVENS; Comment: Entered by VVERA1 - Approved. Also see permit number T19CM05078.} ; {Activity date: 04/20/2021; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by VLEON1 - Partial. Continuing on the west side still going south to the outside transformer. From the CEP room to the west side of the chiller area.} ; {Activity date: 04/15/2021; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by VLEON1 - Partial. Continuing from where we start going south approximately 90 feet more.} ; {Activity date: 04/13/2021; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by VLEON1 - Partial. From CEP room going south approximately 60 feet.

} ; {Activity date: 02/17/2021; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by RSALDAT1 - Partial. From main building to East side parking lot.} ; {Activity date: 02/03/2021; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by VLEON1 - Partial. From southwest corner of building going south approximately 300 feet light poles for parking lot.} ; {Activity date: 11/25/2020; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by RSALDAT1 - Partial. Area A, nurses station and electrical room 1550.} ; {Activity date: 11/05/2020; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by PAHUMAD1 - Partial. Gridlines 3-D.2 to F, Gridlines 4-D.2 to H.} ; {Activity date: 10/28/2020; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by RSALDAT1 - Partial. Gridlines H.2- 2.5 to 7} ; {Activity date: 10/09/2020; Status: Not ready for Inspection; Inspector: ESTEVENS; Comment: Entered by JSCHNEI2 - Not ready.} ; {Activity date: 10/08/2020; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by VFLORES1 - RVI From main electrical room to chiller electrical room.
From gridlines G-11.5 to kitchen area and continuing to J-11.5. Gridlines F-8.5 to J-8.5. Gridlines} ; {Activity date: 10/01/2020; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by RSALDAT1 - Partial. Electric was inspected on site on yesterday.} ; {Activity date: 09/30/2020; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by RSALDAT1 - Partial. All underground conduit at Main Electrical Plant area at location B-11.} ; {Activity date: 09/24/2020; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by JSCHNEI2 - Partial. Conduit from both generators connecting to conduit coming out of building.} ; {Activity date: 09/23/2020; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by RSALDAT1 - Partial. From A.5-11.5 go west, conduit extends 10 feet beyond the exterior of the building.} ; {Activity date: 09/04/2020; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by RSALDAT1 - Partial. Electrical room at E-10.5. The area gridlines D-10 to E.5-10 and D-11.4 to E.5-11.4.}
12/10/2021 COT - LCBU - Firewall/Fire Barrier/Firestop Passed {Activity date: 12/10/2021; Status: Approved; Inspector: ESTEVENS; Comment: Entered by VVERA1 - Approved. Also see permit number T19CM05078.} ; {Activity date: 05/11/2021; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by VLEON1 - Partial. Level two. Corredor number 2005. West side wall. Two sheets of five-eights drywall.

}
12/10/2021 COT - LCPL - Plumbing Roof Drains Passed {Activity date: 12/10/2021; Status: Approved; Inspector: ESTEVENS; Comment: Entered by VVERA1 - Approved. Also see permit number T19CM05078.} ; {Activity date: 04/16/2021; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by VLEON1 - Partial. CEP area, Northside drain.} ; {Activity date: 04/15/2021; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by VLEON1 - Partial. CEP roof, south side drain only.} ; {Activity date: 04/06/2021; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by VLEON1 - Partial. Area C. South west side of building, six roof drains.} ; {Activity date: 04/02/2021; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by RSALDAT1 - Partial. Area D, high roof drains, two on the south west corner, one on the north west corner.} ; {Activity date: 04/01/2021; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by VLEON1 - Partial. Area D, east side low roof, three roof drains. Area D, east side, high roof, one roof drain.} ; {Activity date: 03/31/2021; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by VLEON1 - Partial. East side low roof drains. (3).} ; {Activity date: 03/26/2021; Status: Cancelled; Inspector: ESTEVENS; Comment: Entered by VLEON1 - CANCELLED BY CONTRACTOR} ; {Activity date: 03/25/2021; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by VLEON1 - PARTIAL TWO ROOF DRAINS ON EAST SIDE ATRIUM} ; {Activity date: 03/23/2021; Status: Partial Approval; Inspector: JBURGE; Comment: Entered by RSALDAT1 - Partial. Roof drains (primary and over flow) on East wing and North wing; under air pressure test.} ; {Activity date: 03/16/2021; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by VLEON1 - Partial. Roof drains on the east and west wing.
} ; {Activity date: 03/11/2021; Status: Partial Approval; Inspector: RCHANDLER; Comment: Entered by VLEON1 - PARTIAL 3 ROOF LEADERS ON WEST WING} ; {Activity date: 11/19/2020; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by PAHUMAD1 - Partial. Areas A& B. Gridlines J-3, G-3, F-3, D-3, G-5, to exterior of the building.} ; {Activity date: 11/18/2020; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by PAHUMAD1 - Partial. Underground from columns J-5, M-8, K-5, K-4, N-8, N-4, N-5, P-6, P-7 to outside of building.}
12/10/2021 COT - LCPL - Plumbing Intermediate Passed {Activity date: 12/10/2021; Status: Approved; Inspector: ESTEVENS; Comment: Entered by VVERA1 - Approved. Also see permit number T19CM05078.} ; {Activity date: 05/11/2021; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by VLEON1 - Partial. Area a. Supply lines. See contractor plans for highlighted areas inspected.}
12/10/2021 COT - LCBU - Exterior Clips/Sheathing Passed {Activity date: 12/10/2021; Status: Approved; Inspector: ESTEVENS; Comment: Entered by VVERA1 - Approved. Also see permit number T19CM05078.} ; {Activity date: 04/16/2021; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by VLEON1 - Partial. Level one column G1 to J3. J4 to L4. P6 to P8. K9 to K15 to G15 to G13 to B13. B11 to B9 to A9 to A7. Level 2. G1 to J1 to J5 to O5 to O8. G1 to G6 to B6.} ; {Activity date: 03/23/2021; Status: Partial Approval; Inspector: JBURGE; Comment: Entered by RSALDAT1 - Partial. Exterior sheathing at South wing at GL: G/9-15; J/9-15 on Level #2. Level #3; parapet wall at GL: 8/K-P; 15/G-J on South wing.} ; {Activity date: 03/16/2021; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by VLEON1 - Partial. Parapet walls on the north and east wing.} ; {Activity date: 03/09/2021; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by VLEON1 - Partial. Exterior framing with densglass. Gridlines B9 to B13, level 2 and parapet. Gridlines J4 to P4 to P7, level 2 and parapet.} ; {Activity date: 03/05/2021; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by VLEON1 - PARTIAL ROOF PARAPET SHEATHING AND BOLTS IN AREAS A & C} ; {Activity date: 02/24/2021; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by VLEON1 - PARTIAL - AREA B LEVEL #1 COLUMN L4 TO P4 TO P6, LEVEL #2 COLUMN A6 OR A9 TO G9} ; {Activity date: 02/02/2021; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by VLEON1 - PARTIAL AREA A NORTH SIDE EXTERIOR WALL}
12/10/2021 COT - LCPL - Rough Soil Passed {Activity date: 12/10/2021; Status: Approved; Inspector: ESTEVENS; Comment: Entered by VVERA1 - Approved. Also see permit number T19CM05078.} ; {Activity date: 03/31/2021; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by VLEON1 - Partial. Underground chiller pipes for cooling towers.
} ; {Activity date: 02/10/2021; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by VLEON1 - PARTIAL STORM WATER DRAIN AT GRIDLINES 4K TO OUTSIDE OF BUILDING} ; {Activity date: 02/08/2021; Status: Cancelled; Inspector: ESTEVENS; Comment: Entered by VLEON1 - CANCELLED} ; {Activity date: 02/04/2021; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by VLEON1 - PARTIAL STORM DRAIN. ROAD GRATE TO DRAINFIELD APPROXIMATELY 110 FEET FROM B0 TO B3} ; {Activity date: 02/03/2021; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by VLEON1 - Partial. Three Southside storm drains, from retaining pond to drainfield and from road grates to retaining field.} ; {Activity date: 01/29/2021; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by VLEON1 - PARTIAL UNDERGOUND STORM DRAIN. FROM THE SOUTH EAST ACCESS RD NORTH 250 FEET.} ; {Activity date: 01/26/2021; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by VLEON1 - PARTIAL CAST-IRON PIPING FOR GREASE LINE FROM COLUNM J.5 TO KITCHEN} ; {Activity date: 01/22/2021; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by VLEON1 - PARTIAL GREASE WASTE LINE IN AREAS C&D} ; {Activity date: 01/15/2021; Status: Cancelled; Inspector: ESTEVENS; Comment: Entered by VLEON1 - } ; {Activity date: 01/11/2021; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by VLEON1 - Partial. Area D.} ; {Activity date: 12/30/2020; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by VLEON1 - Partial. Area C, sanitary lines.
} ; {Activity date: 12/22/2020; Status: Cancelled; Inspector: ESTEVENS; Comment: Entered by RSALDAT1 - Cancel.} ; {Activity date: 12/18/2020; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by RSALDAT1 - Partial. Storm drains in area C. D-13 to C-13, C.5-13 to C.5-10, C.5-10 to A.8-10.} ; {Activity date: 12/17/2020; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by RSALDAT1 - Partial. Storm drains. Area D. 9-K to 13-K, 13-K to 13-F, 13-I.5 to 15-I.5} ; {Activity date: 12/14/2020; Status: Partial Approval; Inspector: JBURGE; Comment: Entered by VLEON1 - PARTIAL, GENERATOR AREA DRAINS AT 6"-16" LINES, DRAINS: l7l9-l11; l12-19; l13-l12. OK TO COVER PROGRESS AREAS.} ; {Activity date: 12/09/2020; Status: Not ready for Inspection; Inspector: ESTEVENS; Comment: Entered by PAHUMAD1 - Not ready.} ; {Activity date: 12/03/2020; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by PAHUMAD1 - Partial. All underground sanitary lines under area B.} ; {Activity date: 11/24/2020; Status: Denied; Inspector: ESTEVENS; Comment: Entered by PAHUMAD1 - Denied. Storm water drainage pipe reduces in size.} ; {Activity date: 11/18/2020; Status: Not ready for Inspection; Inspector: ESTEVENS; Comment: Entered by PAHUMAD1 - Not ready.} ; {Activity date: 11/16/2020; Status: Not ready for Inspection; Inspector: ESTEVENS; Comment: Entered by RSALDAT1 - Not ready.} ; {Activity date: 11/12/2020; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by PAHUMAD1 - Partial. All sanitary sewer lines in Area A.

} ; {Activity date: 11/06/2020; Status: Not ready for Inspection; Inspector: ESTEVENS; Comment: Entered by RSALDAT1 - Not ready.} ; {Activity date: 10/26/2020; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by RSALDAT1 - Partial. Storm drains, Area A and Area C.} ; {Activity date: 10/20/2020; Status: Not ready for Inspection; Inspector: ESTEVENS; Comment: Entered by RSALDAT1 - Not ready.} ; {Activity date: 10/09/2020; Status: Not ready for Inspection; Inspector: ESTEVENS; Comment: Entered by JSCHNEI2 - Not ready.} ; {Activity date: 10/08/2020; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by VFLORES1 - From manhole 2-2 to manhole 2-3.} ; {Activity date: 10/05/2020; Status: Partial Approval; Inspector: JBURGE; Comment: Entered by JSCHNEI2 - Partial. Mechanical room, waste and vent lines, roof drains, vacuum lines: cast iron piping and PVC piping. Ok to back fill area.} ; {Activity date: 09/30/2020; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by RSALDAT1 - Partial. Medical O2 gas. 2 inch copper pipe is sleeved from the O2 pad over near the water softener tanks at gridline 14.5} ; {Activity date: 09/28/2020; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by RSALDAT1 - partial. from manhole 2-1 to manhole 2-2. Pitch and tracer wire only.}
12/10/2021 COT - LCBU - Roof Nailing Passed {Activity date: 12/10/2021; Status: Approved; Inspector: ESTEVENS; Comment: Entered by VVERA1 - Approved. Also see permit number T19CM05078.} ; {Activity date: 01/04/2021; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by VLEON1 - Partial. Ambulance canopy column, 2nd lift, 4 to 8 feet.}
12/10/2021 COT - LCBU - Building Progress Passed {Activity date: 12/10/2021; Status: Approved; Inspector: ESTEVENS; Comment: Entered by VVERA1 - Approved. Also see permit number T19CM05078.} ; {Activity date: 07/23/2020; Status: Not ready for Inspection; Inspector: ESTEVENS; Comment: Entered by RSALDAT1 - Not ready, not complete.}
12/10/2021 COT - LCPL - Yard Water Line Passed {Activity date: 12/10/2021; Status: Approved; Inspector: ESTEVENS; Comment: Entered by VVERA1 - Approved. Also see permit number T19CM05078.} ; {Activity date: 07/02/2021; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by VLEON1 - Partial. From street connection to existing water line on the west side of Old Spanish Trail.} ; {Activity date: 06/30/2021; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by RSALDAT1 - Partial. North side of Old Spanish trail connection.

} ; {Activity date: 04/26/2021; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by VLEON1 - PARTIAL FROM MAIN LINE TO FIRE PUMP ROOM} ; {Activity date: 04/20/2021; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by VLEON1 - Partial. Continuing from the north east corner, going approximately 40 more feet toward old Spanish Trail.} ; {Activity date: 04/15/2021; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by VLEON1 - Partial. Continuing from the north side gate valve, going north 100 feet more} ; {Activity date: 04/07/2021; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by VLEON1 - Partial. From the North side of building to fire hydrant.} ; {Activity date: 04/02/2021; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by RSALDAT1 - Partial. Continuing from the gate valve on the west side going south approximately 85 feet to the next gate valve.} ; {Activity date: 03/31/2021; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by VLEON1 - Partial. Continuing from the N. Side Center of building going west approximately 275 feet.} ; {Activity date: 03/25/2021; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by VLEON1 - Partial. From Northeast Corner of building going west stopping at the center of the building.
} ; {Activity date: 03/23/2021; Status: Partial Approval; Inspector: JBURGE; Comment: Entered by RSALDAT1 - Partial. Domestic water line from main line to Northeast portion of building: approximately 75’. Tracer wire and warning tape are in place. Ok to cover progress areas.} ; {Activity date: 03/22/2021; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by RSALDAT1 - Partial. From gate valve to fire hydrant and 30 feet to the next gate valve.} ; {Activity date: 03/19/2021; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by VLEON1 - Partial. Main water line from Northwest corner of parking lot going Northeast toward Old Spanish tr. stopping at gate valve.} ; {Activity date: 03/16/2021; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by VLEON1 - Partial. Main water lines on the south side coming up to the backflow preventer area.} ; {Activity date: 02/26/2021; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by VLEON1 - Partial. Off of the main water line on the west side near the CEP area, going east to one fire hydrant and going west one irrigation line.} ; {Activity date: 02/17/2021; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by RSALDAT1 - Partial. From Watermain on west side of property on the south east corner going east and then north to the CEP area.} ; {Activity date: 01/20/2021; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by VLEON1 - PARTIAL, FROM "t" INTERSECTION GOING NORTH TO THE SOUTH WEST CORNER OF THE PARKING LOT} ; {Activity date: 01/11/2021; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by VLEON1 - Partial. From “T” intersection to 200 feet east.} ; {Activity date: 01/08/2021; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by VLEON1 - Partial. From drop section to “T” intersection, going west 50 feet, going east approximately 250 feet to the next “T” intersection.} ; {Activity date: 01/06/2021; Status: Cancelled; Inspector: ESTEVENS; Comment: Entered by VLEON1 - } ; {Activity date: 12/30/2020; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by VLEON1 - Partial. From CEP area to drop section.} ; {Activity date: 12/22/2020; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by RSALDAT1 - 8 inch water main from CEP shut-off valve to 3rd shut-off valve.} ; {Activity date: 12/18/2020; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by RSALDAT1 - Partial. 8 inch water main from property line south to CEP area.
}
12/10/2021 COT - LCPL - Sewer Passed {Activity date: 12/10/2021; Status: Approved; Inspector: ESTEVENS; Comment: Entered by VVERA1 - Approved. Also see permit number T19CM05078.} ; {Activity date: 02/10/2021; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by VLEON1 - PARTIAL FROM MANHOLE 2.4 TO MANHOLE 4.1} ; {Activity date: 01/15/2021; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by VLEON1 - PARTIAL FROM MANHOLE 2.3 TO MANHOLE 5.1 - FROM MANHOLE 2.7 TO BUILDING UNDER SLAP IN AREA D} ; {Activity date: 12/03/2020; Status: Not ready for Inspection; Inspector: ESTEVENS; Comment: Entered by PAHUMAD1 - Not ready.} ; {Activity date: 11/16/2020; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by RSALDAT1 - Partial. From manhole 2-5 to manhole 2-6} ; {Activity date: 11/12/2020; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by PAHUMAD1 - Partial. From manhole 2-5 to 2-4 to 2-5.} ; {Activity date: 11/06/2020; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by RSALDAT1 - Partial. From manhole 1-1 to manhole 1-2.} ; {Activity date: 10/28/2020; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by RSALDAT1 - Partial. From manhole 3-3 to 4-K.5, approximately 5 feet from exterior of building.

} ; {Activity date: 10/22/2020; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by PAHUMAD1 - Partial. From manhole 3-2 to manhole 3-3, from manhole 1-4 to manhole 1-5.} ; {Activity date: 10/20/2020; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by RSALDAT1 - PA: Sewer. From manhole 1-2 to manhole 1-4.} ; {Activity date: 10/14/2020; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by JSCHNEI2 - Partial. From manhole 3-1 E. to manhole 3-2.} ; {Activity date: 10/12/2020; Status: Partial Approval; Inspector: JBURGE; Comment: Entered by VFLORES1 - 8" sewer line from man hole #2-2 North for approximately 75’. Ok to cover progress area.} ; {Activity date: 10/08/2020; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by VFLORES1 - From manhole 2-2 to manhole 2-3.} ; {Activity date: 09/28/2020; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by ESTEVEN1 - partial. from manhole 2-1 to manhole 2-2. Pitch and tracer wire only.}