Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Passed
Inspection History: COT - LCBU - Exterior Clips/Sheathing
Permit Number - T20CM02980
Inspection Description - COT - LCBU - Exterior Clips/Sheathing
Inspection Status - Passed
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
12/10/2021 | COT - LCBU - Exterior Clips/Sheathing | ESTEVENS | Approved | Entered by VVERA1 - Approved. Also see permit number T19CM05078. |
04/16/2021 | COT - LCBU - Exterior Clips/Sheathing | ESTEVENS | Partial Approval | Entered by VLEON1 - Partial. Level one column G1 to J3. J4 to L4. P6 to P8. K9 to K15 to G15 to G13 to B13. B11 to B9 to A9 to A7. Level 2. G1 to J1 to J5 to O5 to O8. G1 to G6 to B6. |
03/23/2021 | COT - LCBU - Exterior Clips/Sheathing | JBURGE | Partial Approval | Entered by RSALDAT1 - Partial. Exterior sheathing at South wing at GL: G/9-15; J/9-15 on Level #2. Level #3; parapet wall at GL: 8/K-P; 15/G-J on South wing. |
03/16/2021 | COT - LCBU - Exterior Clips/Sheathing | ESTEVENS | Partial Approval | Entered by VLEON1 - Partial. Parapet walls on the north and east wing. |
03/09/2021 | COT - LCBU - Exterior Clips/Sheathing | ESTEVENS | Partial Approval | Entered by VLEON1 - Partial. Exterior framing with densglass. Gridlines B9 to B13, level 2 and parapet. Gridlines J4 to P4 to P7, level 2 and parapet. |
03/05/2021 | COT - LCBU - Exterior Clips/Sheathing | ESTEVENS | Partial Approval | Entered by VLEON1 - PARTIAL ROOF PARAPET SHEATHING AND BOLTS IN AREAS A & C |
02/24/2021 | COT - LCBU - Exterior Clips/Sheathing | ESTEVENS | Partial Approval | Entered by VLEON1 - PARTIAL - AREA B LEVEL #1 COLUMN L4 TO P4 TO P6, LEVEL #2 COLUMN A6 OR A9 TO G9 |
02/02/2021 | COT - LCBU - Exterior Clips/Sheathing | ESTEVENS | Partial Approval | Entered by VLEON1 - PARTIAL AREA A NORTH SIDE EXTERIOR WALL |