Permit: T20CM02980

Parcel: Unknown


Addresses:

2200 S HOUGHTON RD

Inspection Status: Passed

Inspection History: COT - LCPL - Rough Soil 

Date Description Inspector Results Comments
12/10/2021 COT - LCPL - Rough Soil  ESTEVENS Approved Entered by VVERA1 - Approved. Also see permit number T19CM05078.
03/31/2021 COT - LCPL - Rough Soil  ESTEVENS Partial Approval Entered by VLEON1 - Partial. Underground chiller pipes for cooling towers.
02/10/2021 COT - LCPL - Rough Soil  ESTEVENS Partial Approval Entered by VLEON1 - PARTIAL STORM WATER DRAIN AT GRIDLINES 4K TO OUTSIDE OF BUILDING
02/08/2021 COT - LCPL - Rough Soil  ESTEVENS Cancelled Entered by VLEON1 - CANCELLED
02/04/2021 COT - LCPL - Rough Soil  ESTEVENS Partial Approval Entered by VLEON1 - PARTIAL STORM DRAIN. ROAD GRATE TO DRAINFIELD APPROXIMATELY 110 FEET FROM B0 TO B3
02/03/2021 COT - LCPL - Rough Soil  ESTEVENS Partial Approval Entered by VLEON1 - Partial. Three Southside storm drains, from retaining pond to drainfield and from road grates to retaining field.
01/29/2021 COT - LCPL - Rough Soil  ESTEVENS Partial Approval Entered by VLEON1 - PARTIAL UNDERGOUND STORM DRAIN. FROM THE SOUTH EAST ACCESS RD NORTH 250 FEET.
01/26/2021 COT - LCPL - Rough Soil  ESTEVENS Partial Approval Entered by VLEON1 - PARTIAL CAST-IRON PIPING FOR GREASE LINE FROM COLUNM J.5 TO KITCHEN
01/22/2021 COT - LCPL - Rough Soil  ESTEVENS Partial Approval Entered by VLEON1 - PARTIAL GREASE WASTE LINE IN AREAS C&D
01/15/2021 COT - LCPL - Rough Soil  ESTEVENS Cancelled Entered by VLEON1 -
01/11/2021 COT - LCPL - Rough Soil  ESTEVENS Partial Approval Entered by VLEON1 - Partial. Area D.
12/30/2020 COT - LCPL - Rough Soil  ESTEVENS Partial Approval Entered by VLEON1 - Partial. Area C, sanitary lines.
12/22/2020 COT - LCPL - Rough Soil  ESTEVENS Cancelled Entered by RSALDAT1 - Cancel.
12/18/2020 COT - LCPL - Rough Soil  ESTEVENS Partial Approval Entered by RSALDAT1 - Partial. Storm drains in area C. D-13 to C-13, C.5-13 to C.5-10, C.5-10 to A.8-10.
12/17/2020 COT - LCPL - Rough Soil  ESTEVENS Partial Approval Entered by RSALDAT1 - Partial. Storm drains. Area D. 9-K to 13-K, 13-K to 13-F, 13-I.5 to 15-I.5
12/14/2020 COT - LCPL - Rough Soil  JBURGE Partial Approval Entered by VLEON1 - PARTIAL, GENERATOR AREA DRAINS AT 6"-16" LINES, DRAINS: l7l9-l11; l12-19; l13-l12. OK TO COVER PROGRESS AREAS.
12/09/2020 COT - LCPL - Rough Soil  ESTEVENS Not ready for Inspection Entered by PAHUMAD1 - Not ready.
12/03/2020 COT - LCPL - Rough Soil  ESTEVENS Partial Approval Entered by PAHUMAD1 - Partial. All underground sanitary lines under area B.
11/24/2020 COT - LCPL - Rough Soil  ESTEVENS Denied Entered by PAHUMAD1 - Denied. Storm water drainage pipe reduces in size.
11/18/2020 COT - LCPL - Rough Soil  ESTEVENS Not ready for Inspection Entered by PAHUMAD1 - Not ready.
11/16/2020 COT - LCPL - Rough Soil  ESTEVENS Not ready for Inspection Entered by RSALDAT1 - Not ready.
11/12/2020 COT - LCPL - Rough Soil  ESTEVENS Partial Approval Entered by PAHUMAD1 - Partial. All sanitary sewer lines in Area A.
11/06/2020 COT - LCPL - Rough Soil  ESTEVENS Not ready for Inspection Entered by RSALDAT1 - Not ready.
10/26/2020 COT - LCPL - Rough Soil  ESTEVENS Partial Approval Entered by RSALDAT1 - Partial. Storm drains, Area A and Area C.
10/20/2020 COT - LCPL - Rough Soil  ESTEVENS Not ready for Inspection Entered by RSALDAT1 - Not ready.
10/09/2020 COT - LCPL - Rough Soil  ESTEVENS Not ready for Inspection Entered by JSCHNEI2 - Not ready.
10/08/2020 COT - LCPL - Rough Soil  ESTEVENS Partial Approval Entered by VFLORES1 - From manhole 2-2 to manhole 2-3.
10/05/2020 COT - LCPL - Rough Soil  JBURGE Partial Approval Entered by JSCHNEI2 - Partial. Mechanical room, waste and vent lines, roof drains, vacuum lines: cast iron piping and PVC piping. Ok to back fill area.
09/30/2020 COT - LCPL - Rough Soil  ESTEVENS Partial Approval Entered by RSALDAT1 - Partial. Medical O2 gas. 2 inch copper pipe is sleeved from the O2 pad over near the water softener tanks at gridline 14.5