Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Passed
Inspection History: COT - LCPL - Rough Soil
Permit Number - T20CM02980
Inspection Description - COT - LCPL - Rough Soil
Inspection Status - Passed
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/10/2021 | COT - LCPL - Rough Soil | ESTEVENS | Approved | Entered by VVERA1 - Approved. Also see permit number T19CM05078. |
| 03/31/2021 | COT - LCPL - Rough Soil | ESTEVENS | Partial Approval | Entered by VLEON1 - Partial. Underground chiller pipes for cooling towers. |
| 02/10/2021 | COT - LCPL - Rough Soil | ESTEVENS | Partial Approval | Entered by VLEON1 - PARTIAL STORM WATER DRAIN AT GRIDLINES 4K TO OUTSIDE OF BUILDING |
| 02/08/2021 | COT - LCPL - Rough Soil | ESTEVENS | Cancelled | Entered by VLEON1 - CANCELLED |
| 02/04/2021 | COT - LCPL - Rough Soil | ESTEVENS | Partial Approval | Entered by VLEON1 - PARTIAL STORM DRAIN. ROAD GRATE TO DRAINFIELD APPROXIMATELY 110 FEET FROM B0 TO B3 |
| 02/03/2021 | COT - LCPL - Rough Soil | ESTEVENS | Partial Approval | Entered by VLEON1 - Partial. Three Southside storm drains, from retaining pond to drainfield and from road grates to retaining field. |
| 01/29/2021 | COT - LCPL - Rough Soil | ESTEVENS | Partial Approval | Entered by VLEON1 - PARTIAL UNDERGOUND STORM DRAIN. FROM THE SOUTH EAST ACCESS RD NORTH 250 FEET. |
| 01/26/2021 | COT - LCPL - Rough Soil | ESTEVENS | Partial Approval | Entered by VLEON1 - PARTIAL CAST-IRON PIPING FOR GREASE LINE FROM COLUNM J.5 TO KITCHEN |
| 01/22/2021 | COT - LCPL - Rough Soil | ESTEVENS | Partial Approval | Entered by VLEON1 - PARTIAL GREASE WASTE LINE IN AREAS C&D |
| 01/15/2021 | COT - LCPL - Rough Soil | ESTEVENS | Cancelled | Entered by VLEON1 - |
| 01/11/2021 | COT - LCPL - Rough Soil | ESTEVENS | Partial Approval | Entered by VLEON1 - Partial. Area D. |
| 12/30/2020 | COT - LCPL - Rough Soil | ESTEVENS | Partial Approval | Entered by VLEON1 - Partial. Area C, sanitary lines. |
| 12/22/2020 | COT - LCPL - Rough Soil | ESTEVENS | Cancelled | Entered by RSALDAT1 - Cancel. |
| 12/18/2020 | COT - LCPL - Rough Soil | ESTEVENS | Partial Approval | Entered by RSALDAT1 - Partial. Storm drains in area C. D-13 to C-13, C.5-13 to C.5-10, C.5-10 to A.8-10. |
| 12/17/2020 | COT - LCPL - Rough Soil | ESTEVENS | Partial Approval | Entered by RSALDAT1 - Partial. Storm drains. Area D. 9-K to 13-K, 13-K to 13-F, 13-I.5 to 15-I.5 |
| 12/14/2020 | COT - LCPL - Rough Soil | JBURGE | Partial Approval | Entered by VLEON1 - PARTIAL, GENERATOR AREA DRAINS AT 6"-16" LINES, DRAINS: l7l9-l11; l12-19; l13-l12. OK TO COVER PROGRESS AREAS. |
| 12/09/2020 | COT - LCPL - Rough Soil | ESTEVENS | Not ready for Inspection | Entered by PAHUMAD1 - Not ready. |
| 12/03/2020 | COT - LCPL - Rough Soil | ESTEVENS | Partial Approval | Entered by PAHUMAD1 - Partial. All underground sanitary lines under area B. |
| 11/24/2020 | COT - LCPL - Rough Soil | ESTEVENS | Denied | Entered by PAHUMAD1 - Denied. Storm water drainage pipe reduces in size. |
| 11/18/2020 | COT - LCPL - Rough Soil | ESTEVENS | Not ready for Inspection | Entered by PAHUMAD1 - Not ready. |
| 11/16/2020 | COT - LCPL - Rough Soil | ESTEVENS | Not ready for Inspection | Entered by RSALDAT1 - Not ready. |
| 11/12/2020 | COT - LCPL - Rough Soil | ESTEVENS | Partial Approval | Entered by PAHUMAD1 - Partial. All sanitary sewer lines in Area A. |
| 11/06/2020 | COT - LCPL - Rough Soil | ESTEVENS | Not ready for Inspection | Entered by RSALDAT1 - Not ready. |
| 10/26/2020 | COT - LCPL - Rough Soil | ESTEVENS | Partial Approval | Entered by RSALDAT1 - Partial. Storm drains, Area A and Area C. |
| 10/20/2020 | COT - LCPL - Rough Soil | ESTEVENS | Not ready for Inspection | Entered by RSALDAT1 - Not ready. |
| 10/09/2020 | COT - LCPL - Rough Soil | ESTEVENS | Not ready for Inspection | Entered by JSCHNEI2 - Not ready. |
| 10/08/2020 | COT - LCPL - Rough Soil | ESTEVENS | Partial Approval | Entered by VFLORES1 - From manhole 2-2 to manhole 2-3. |
| 10/05/2020 | COT - LCPL - Rough Soil | JBURGE | Partial Approval | Entered by JSCHNEI2 - Partial. Mechanical room, waste and vent lines, roof drains, vacuum lines: cast iron piping and PVC piping. Ok to back fill area. |
| 09/30/2020 | COT - LCPL - Rough Soil | ESTEVENS | Partial Approval | Entered by RSALDAT1 - Partial. Medical O2 gas. 2 inch copper pipe is sleeved from the O2 pad over near the water softener tanks at gridline 14.5 |
| 09/28/2020 | COT - LCPL - Rough Soil | ESTEVENS | Partial Approval | Entered by RSALDAT1 - partial. from manhole 2-1 to manhole 2-2. Pitch and tracer wire only. |