Permit: T20CM02980

Parcel: Unknown


Addresses:

2200 S HOUGHTON RD

Inspection Status: Passed

Inspection History: COT - LCEL - Electrical Underground 

Date Description Inspector Results Comments
12/10/2021 COT - LCEL - Electrical Underground  ESTEVENS Approved Entered by VVERA1 - Approved. Also see permit number T19CM05078.
04/20/2021 COT - LCEL - Electrical Underground  ESTEVENS Partial Approval Entered by VLEON1 - Partial. Continuing on the west side still going south to the outside transformer. From the CEP room to the west side of the chiller area.
04/15/2021 COT - LCEL - Electrical Underground  ESTEVENS Partial Approval Entered by VLEON1 - Partial. Continuing from where we start going south approximately 90 feet more.
04/13/2021 COT - LCEL - Electrical Underground  ESTEVENS Partial Approval Entered by VLEON1 - Partial. From CEP room going south approximately 60 feet.
02/17/2021 COT - LCEL - Electrical Underground  ESTEVENS Partial Approval Entered by RSALDAT1 - Partial. From main building to East side parking lot.
02/03/2021 COT - LCEL - Electrical Underground  ESTEVENS Partial Approval Entered by VLEON1 - Partial. From southwest corner of building going south approximately 300 feet light poles for parking lot.
11/25/2020 COT - LCEL - Electrical Underground  ESTEVENS Partial Approval Entered by RSALDAT1 - Partial. Area A, nurses station and electrical room 1550.
11/05/2020 COT - LCEL - Electrical Underground  ESTEVENS Partial Approval Entered by PAHUMAD1 - Partial. Gridlines 3-D.2 to F, Gridlines 4-D.2 to H.
10/28/2020 COT - LCEL - Electrical Underground  ESTEVENS Partial Approval Entered by RSALDAT1 - Partial. Gridlines H.2- 2.5 to 7
10/09/2020 COT - LCEL - Electrical Underground  ESTEVENS Not ready for Inspection Entered by JSCHNEI2 - Not ready.
10/08/2020 COT - LCEL - Electrical Underground  ESTEVENS Partial Approval Entered by VFLORES1 - RVI From main electrical room to chiller electrical room. From gridlines G-11.5 to kitchen area and continuing to J-11.5. Gridlines F-8.5 to J-8.5. Gridlines
10/01/2020 COT - LCEL - Electrical Underground  ESTEVENS Partial Approval Entered by RSALDAT1 - Partial. Electric was inspected on site on yesterday.
09/30/2020 COT - LCEL - Electrical Underground  ESTEVENS Partial Approval Entered by RSALDAT1 - Partial. All underground conduit at Main Electrical Plant area at location B-11.
09/24/2020 COT - LCEL - Electrical Underground  ESTEVENS Partial Approval Entered by JSCHNEI2 - Partial. Conduit from both generators connecting to conduit coming out of building.
09/23/2020 COT - LCEL - Electrical Underground  ESTEVENS Partial Approval Entered by RSALDAT1 - Partial. From A.5-11.5 go west, conduit extends 10 feet beyond the exterior of the building.
09/04/2020 COT - LCEL - Electrical Underground  ESTEVENS Partial Approval Entered by RSALDAT1 - Partial. Electrical room at E-10.5. The area gridlines D-10 to E.5-10 and D-11.4 to E.5-11.4.