Permit Details

Status:
Expired
Type:
Commercial Building
Apply Date:
02/14/2020
Applicant:
Lisa Bowers
Description:
TI: OFFICE

Permit Reviews

Permit Number - T20CM01086
Permit Status: Expired
Permit Description: TI: OFFICE
Start Date Submittal Complete Date Status  
02/14/2020 PLANS OK TO SUBMIT - COMM 02/19/2020 COMPLETED Review Details
02/19/2020 COMMERCIAL - TI 04/08/2020 COMPLETED Review Details
04/08/2020 RESUBMITTAL - TI ALL 05/27/2020 COMPLETED Review Details
08/17/2020 REVISION - - 1ST 09/21/2020 COMPLETED Review Details

Outstanding Activity Conditions

Permit Number - T20CM01086
Permit Status: Expired
Permit Description: TI: OFFICE
Total Outstanding Activity Conditions - 1
Date Name
02/14/2020 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.

Conditions

Permit Number - T20CM01086
Permit Status: Expired
Permit Description: TI: OFFICE
Date Description Comments
08/31/2020 SPECIAL INSPECTION FORMS AND REPORTS REQUIRED PRIOR TO ISSUANCE OF A CERTIFICATE OF OCCUPANCY.
05/27/2021 SPECIAL INSPECTION FOR HIGH STRENGTH BOLTING IS REQUIRED.
05/13/2020 SPECIAL INSPECTION FOR FIELD WELDING IS REQUIRED.

Outstanding Inspections

Permit Status: Expired
Permit Number: T20CM01086
Permite Description: TI: OFFICE
Total Outstanding Inspections - 5
Last Inspection Date Description Inspector Results Comments
05/24/2021 COT - LCBU - Excavation/Rebar/Zoning N/A Canceled {Activity date: 05/24/2021; Status: Not Applicable; Inspector: DMUNIZ; Comment: Entered by VLEON1 - }
05/24/2021 COT - LCBU - Preslab N/A Canceled {Activity date: 05/24/2021; Status: Not Applicable; Inspector: DMUNIZ; Comment: Entered by VLEON1 - }
05/24/2021 COT - LCBU - Masonry Pregrout N/A Canceled {Activity date: 05/24/2021; Status: Not Applicable; Inspector: DMUNIZ; Comment: Entered by VLEON1 - }
11/07/2022 COT - FCON - Alarm - Final N/A Canceled Inspection Canceled
11/07/2022 COT - FCON - Fire - Final N/A Canceled Inspection Canceled

Completed Inspections

Permit Status: Expired
Permit Number: T20CM01086
Permit Description: TI: OFFICE
Total Completed Inspections - 17
Date Description Inspector Results Comments
11/12/2020 COT - LCPL - Plumbing Intermediate Passed {Activity date: 11/12/2020; Status: Approved; Inspector: DMUNIZ; Comment: Entered by PAHUMAD1 - Approved.} ; {Activity date: 11/03/2020; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by PAHUMAD1 - Partial, rough soil 1st floor complete.} ; {Activity date: 06/19/2020; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by RSALDAT1 - Partial, Phase 1- RM 176 plumbing in wall ok to proceed.} ; {Activity date: 06/15/2020; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by RSALDAT1 - Partial, Phase 1 Plumbing in walls ok to proceed.}
11/12/2020 COT - HCBU - Interior Shear Bracing Passed {Activity date: 11/12/2020; Status: Approved; Inspector: DMUNIZ; Comment: Entered by PAHUMAD1 - Approved.} ; {Activity date: 06/26/2020; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by RSALDAT1 - Partial, Phase 1, Rooms 166-179 All ok to Sheetrock and proceed.} ; {Activity date: 06/17/2020; Status: Partial Approval; Inspector: WGALLAGHER; Comment: Entered by RSALDAT1 - Partial approval for rooms 165,A,B,C,D and rooms 167,168,169,170 ok for tape} ; {Activity date: 06/15/2020; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by RSALDAT1 - Partial, a Phase 1 arms 165C/ 165D ok to proceed.
}
12/10/2020 COT - LCPL - Rough Soil Passed {Activity date: 12/10/2020; Status: Approved; Inspector: DQUINN; Comment: Entered by PAHUMAD1 - New sink drain line ok to backfill.}
01/15/2021 COT - LCEL - Electrical Intermediate Passed {Activity date: 01/15/2021; Status: Approved; Inspector: TGALLAGHER; Comment: Entered by VLEON1 - APPROVED, OK TO COVER} ; {Activity date: 01/05/2021; Status: Partial Approval; Inspector: WGALLAGHER; Comment: Entered by VLEON1 - Partial approval for rooms 135 and 136 first floor phase 3 sht 2E3.1 walls only} ; {Activity date: 12/21/2020; Status: Partial Approval; Inspector: TTREMBULAK; Comment: Entered by VLEON1 - Partial. OH building, rooms 218, 218A, 131, 132, and 134 in wall electric ok.} ; {Activity date: 12/02/2020; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by PAHUMAD1 - Partial, Panel IT1 ok to energize.} ; {Activity date: 11/19/2020; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by PAHUMAD1 - Partial, 2nd floor Conference rooms 202 & 202A Electrical in walls ok to proceed.} ; {Activity date: 11/06/2020; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by PAHUMAD1 - Partial, Electrical in walls and floor boxes phase 3 first floor ok to proceed.} ; {Activity date: 07/30/2020; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by RSALDAT1 - Partial, Transformer change out for TLA3 Inspected and Approved.} ; {Activity date: 07/27/2020; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by RSALDAT1 - Partial, Inspection for Disconnects & Panels (LB1, LB2, LA3, LA4) ok to Energize and power check branch circuits.

} ; {Activity date: 07/23/2020; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by RSALDAT1 - Partial, Phase 1- Rms 171-179 ok to proceed.} ; {Activity date: 07/15/2020; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by RSALDAT1 - Partial- Phase 1, Conference Rm 113 Electrical in walls approved.

} ; {Activity date: 06/19/2020; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by RSALDAT1 - Partial, Phase 1- RM 176 Electrical in wall ok to proceed.} ; {Activity date: 06/15/2020; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by RSALDAT1 - Partial, Phase 1 Electrical in walls ok to proceed.} ; {Activity date: 06/11/2020; Status: Partial Approval; Inspector: TTREMBULAK; Comment: Entered by RSALDAT1 - Partial. Conference rooms 165 A-D, and hallway 175.} ; {Activity date: 06/09/2020; Status: Cancelled; Inspector: TTREMBULAK; Comment: Entered by RSALDAT1 - Please call your inspector for further video inspection information. No contact information given}
05/24/2021 COT - LCBU - Building Above Ceiling Passed {Activity date: 05/24/2021; Status: Approved; Inspector: DMUNIZ; Comment: Entered by VLEON1 - } ; {Activity date: 04/15/2021; Status: Partial Approval; Inspector: TGAUSP; Comment: Entered by VLEON1 - Partial Approved for above ceiling in Lobby 100 and 200} ; {Activity date: 02/08/2021; Status: Partial Approval; Inspector: TTREMBULAK; Comment: Entered by VLEON1 - PARTIAL ROOMS 135, 221, 202A} ; {Activity date: 02/05/2021; Status: Partial Approval; Inspector: WGALLAGHER; Comment: Entered by VLEON1 - Partial approval for rooms 131, 131A, 136, 137, 138, 140, 141, 142, 202, 204, 205, 206, 207, 218, 218A, 219, 220, and 223 rooms checked for electrical and mechanical also ok to install ceiling tile. Note 138 has one panel cover open.
Restrooms rooms 208 and 209 ok to drywall and hard lid.} ; {Activity date: 02/03/2021; Status: Partial Approval; Inspector: WGALLAGHER; Comment: Entered by VLEON1 - Partial approval for open office rooms 222 and 201 excludes area of ceiling grid removed in room 201 to access installation of 4 inch conduit for com antennas

} ; {Activity date: 02/01/2021; Status: Partial Approval; Inspector: WGALLAGHER; Comment: Entered by VLEON1 - Partial approval for open office rooms 222 and 201 please add seismic wires on existing air defusers, excludes area of ceiling grid removed in room 201 to access installation of 4 inch conduit for com antennas} ; {Activity date: 10/29/2020; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by PAHUMAD1 - Partial, Phase 3 Computer room 117 Hard duct installed, sealed and ok to insulate.} ; {Activity date: 08/03/2020; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by RSALDAT1 - Partial, Phase 1 Rm 113 ok to drop ceiling tiles.}
05/24/2021 COT - LCBU - Framing Passed {Activity date: 05/24/2021; Status: Approved; Inspector: DMUNIZ; Comment: Entered by VLEON1 - } ; {Activity date: 02/03/2021; Status: Partial Approval; Inspector: WGALLAGHER; Comment: Entered by VLEON1 - Partial approval for restrooms #129 and 127 ok to drywall and hard lid restrooms} ; {Activity date: 11/06/2020; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by PAHUMAD1 - Partial, Phase 3 framing for first floor ok to proceed.} ; {Activity date: 10/22/2020; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by RSALDAT1 - Partial, Ok to Sheetrock party walls above ceiling.} ; {Activity date: 07/01/2020; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by RSALDAT1 - Partial, Phase 1, Rm 175 framing for Hard lid ok to Sheetrock and proceed.} ; {Activity date: 06/19/2020; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by RSALDAT1 - Partial, Phase 1- RM 176 ok to proceed.} ; {Activity date: 06/15/2020; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by RSALDAT1 - Partial, Phase 1 interior walls ok to Sheet.} ; {Activity date: 06/11/2020; Status: Partial Approval; Inspector: TTREMBULAK; Comment: Entered by RSALDAT1 - Partial. Conference rooms 165 A-D, and hallway 175.}
05/24/2021 COT - LCME - Mechanical Above Ceiling Passed {Activity date: 05/24/2021; Status: Approved; Inspector: DMUNIZ; Comment: Entered by VLEON1 - } ; {Activity date: 02/18/2021; Status: Not ready for Inspection; Inspector: ESTEVENS; Comment: Entered by RSALDAT1 - not ready.} ; {Activity date: 02/08/2021; Status: Partial Approval; Inspector: TTREMBULAK; Comment: Entered by VLEON1 - PARTIAL ROOMS 135, 221, 202A} ; {Activity date: 02/05/2021; Status: Partial Approval; Inspector: WGALLAGHER; Comment: Entered by VLEON1 - Partial approval for rooms 131, 131A, 136, 137, 138, 140, 141, 142, 202, 204, 205, 206, 207, 218, 218A, 219, 220, and 223 rooms checked for electrical and mechanical also ok to install ceiling tile. Note 138 has one panel cover open.
Restrooms rooms 208 and 209 ok to drywall and hard lid.} ; {Activity date: 02/01/2021; Status: Partial Approval; Inspector: WGALLAGHER; Comment: Entered by VLEON1 - Partial approval for open office rooms 222 and 201 please add seismic wires on existing air defusers, excludes area of ceiling grid removed in room 201 to access installation of 4 inch conduit for com antennas} ; {Activity date: 10/29/2020; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by PAHUMAD1 - Partial, Phase 3 Computer room 117 Hard duct installed, sealed and ok to insulate.} ; {Activity date: 10/26/2020; Status: Partial Approval; Inspector: WGALLAGHER; Comment: Entered by PAHUMAD1 - Partial approval for pressure test of AVA piping for above ceiling in room 156 coil at location 1-a1} ; {Activity date: 10/22/2020; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by RSALDAT1 - Partial, Duct work phase 2&3 installed and ok to proceed.} ; {Activity date: 07/23/2020; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by RSALDAT1 - Partial, Phase 1- Rms 171-179 ok to proceed.} ; {Activity date: 07/21/2020; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by JSCHNEI2 - Partial, Phase 1- Rms 165(A,B,C,D), 167, 168, 169, & 170 ok to Finish Acoustic ceiling’s.
}
05/24/2021 COT - LCPL - Plumbing Above Ceiling Passed {Activity date: 05/24/2021; Status: Approved; Inspector: DMUNIZ; Comment: Entered by VLEON1 - } ; {Activity date: 02/05/2021; Status: Partial Approval; Inspector: WGALLAGHER; Comment: Entered by VLEON1 - Partial approval for rooms 131, 131A, 136, 137, 138, 140, 141, 142, 202, 204, 205, 206, 207, 218, 218A, 219, 220, and 223 rooms checked for electrical and mechanical also ok to install ceiling tile. Note 138 has one panel cover open.
Restrooms rooms 208 and 209 ok to drywall and hard lid.} ; {Activity date: 02/03/2021; Status: Partial Approval; Inspector: WGALLAGHER; Comment: Entered by VLEON1 - Partial approval for #129 and 127 ok for hard lid} ; {Activity date: 02/02/2021; Status: Cancelled; Inspector: WGALLAGHER; Comment: Entered by RSALDAT1 - nspection canceled} ; {Activity date: 01/20/2021; Status: Partial Approval; Inspector: WGALLAGHER; Comment: Entered by RSALDAT1 - Partial approval for room 148 and 156 and plumbing 2nd floor 3” waste line, wall ok to drywall and hang tiles
Partial approval for break room/conference room and rooms 142, and 141 ok to drywall soffit except j box} ; {Activity date: 07/23/2020; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by RSALDAT1 - Partial, Phase 1- Rms 171-179 ok to proceed.} ; {Activity date: 07/21/2020; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by JSCHNEI2 - Partial, Phase 1- Rms 165(A,B,C,D), 167, 168, 169, & 170 ok to Finish Acoustic ceiling’s.}
05/24/2021 COT - LCME - Mechanical Intermediate Passed {Activity date: 05/24/2021; Status: Approved; Inspector: DMUNIZ; Comment: Entered by VLEON1 - } ; {Activity date: 04/15/2021; Status: Partial Approval; Inspector: TGAUSP; Comment: Entered by VLEON1 - Partial Approved for above ceiling in Lobby 100 and 200} ; {Activity date: 04/13/2021; Status: Partial Approval; Inspector: DQUINN; Comment: Entered by VLEON1 - PARTIAL - Details from these inspections will be entered on 4/14, once I receive email detailing components and locations of these inspections from contractor.} ; {Activity date: 03/19/2021; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by VLEON1 - Partial, ok to close acoustic ceilings on existing building.} ; {Activity date: 02/05/2021; Status: Partial Approval; Inspector: WGALLAGHER; Comment: Entered by VLEON1 - Partial approval for rooms 131, 131A, 136, 137, 138, 140, 141, 142, 202, 204, 205, 206, 207, 218, 218A, 219, 220, and 223 rooms checked for electrical and mechanical also ok to install ceiling tile. Note 138 has one panel cover open.
Restrooms rooms 208 and 209 ok to drywall and hard lid.} ; {Activity date: 11/03/2020; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by PAHUMAD1 - Partial, Second floor phase 3 Duct installed.} ; {Activity date: 06/26/2020; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by RSALDAT1 - Partial, Phase 1, Hot Water Loop to 13 VAVs under test ok to insulate and proceed.} ; {Activity date: 06/19/2020; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by RSALDAT1 - Partial, Mechanical Duct Phase 1 ok to start Insulating.}
05/24/2021 COT - LCBU - Building Progress Passed {Activity date: 05/24/2021; Status: Approved; Inspector: DMUNIZ; Comment: Entered by VLEON1 - } ; {Activity date: 12/21/2020; Status: Partial Approval; Inspector: TTREMBULAK; Comment: Entered by VLEON1 - Partial. In wall plumbing OH building rooms 218, 218A.}
05/26/2021 COT - LCME - Mechanical Final Passed {Activity date: 05/26/2021; Status: Approved; Inspector: JBURGE; Comment: Entered by VLEON1 - } ; {Activity date: 08/31/2020; Status: Partial Approval; Inspector: RSHERRY; Comment: Entered by RSHERRY1 - REVIEW OF PHASE 1 AIR BALANCE REPORT COMPLETED}
05/26/2021 COT - LCEL - Electrical Final Passed {Activity date: 05/26/2021; Status: Approved; Inspector: JBURGE; Comment: Entered by VLEON1 - } ; {Activity date: 10/09/2020; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by PAHUMAD1 - Partial, Phase 1 Complete ok for TCO}
05/26/2021 ENGR Engineering Final Passed {Activity date: 05/26/2021; Status: Approved; Inspector: JBURGE; Comment: Entered by VLEON1 - } ; {Activity date: 05/25/2021; Status: Partial Approval; Inspector: MHERNANDEZ; Comment: Entered by VLEON1 - PARTIAL APPROVED OK FOR TCO PENDING ALL OTHER INSPECTIONS. THIS SITE NEEDS CURB AND MORE LANDSCAPE WORK TO BE COMPLETED PRIOR TO THE FINAL INSPECTION.}
05/26/2021 COT - LCEL - Electrical Above Ceiling Passed {Activity date: 05/26/2021; Status: Approved; Inspector: JBURGE; Comment: Entered by VLEON1 - } ; {Activity date: 04/15/2021; Status: Partial Approval; Inspector: TGAUSP; Comment: Entered by VLEON1 - Partial Approved for above ceiling in Lobby 100 and 200} ; {Activity date: 02/18/2021; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by RSALDAT1 - Partial. Level one rooms 102 through 111. Level two room 201.

NOTE:INSPECTRO CHANGED STATUS FROM AP TO PA ASSOCIATED WITH FIELD DECISON.} ; {Activity date: 01/25/2021; Status: Approved; Inspector: JBURGE; Comment: Entered by VLEON1 - Partial approval rooms 117, 136, 137, 138, 144-147, and 153, 154, 155, 157 Ok for ceiling tile} ; {Activity date: 01/20/2021; Status: Partial Approval; Inspector: WGALLAGHER; Comment: Entered by RSALDAT1 - Partial approval for room 148 and 156 and plumbing wall ok to drywall and hang tiles} ; {Activity date: 07/23/2020; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by RSALDAT1 - Partial, Phase 1- Rms 171-179 ok to proceed.} ; {Activity date: 07/21/2020; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by JSCHNEI2 - Partial, Phase 1- Rms 165(A,B,C,D), 167, 168, 169, & 170 ok to Finish Acoustic ceiling’s.}
05/26/2021 COT - LCPL - Plumbing Final Passed {Activity date: 05/26/2021; Status: Approved; Inspector: JBURGE; Comment: Entered by VLEON1 - } ; {Activity date: 10/09/2020; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by PAHUMAD1 - PARTIAL, Phase 1 complete ok for TCO

}
05/27/2021 COT - FCON - Sprinkler - Final Passed {Activity date: 05/27/2021; Status: Approved; Inspector: jfordney; Comment: Entered by JFORDNE1 - need Knox caps P2F} ; {Activity date: 09/02/2020; Status: Partial Approval; Inspector: jfordney; Comment: Entered by JFORDNE1 - Phase 1 OH building approved}
06/01/2021 COT - LCBU - Building Final Passed {Activity date: 06/01/2021; Status: Approved; Inspector: RSHERRY; Comment: Entered by RSHERRY1 - REVIEW OF AIR BALANCE REPORT COMPLETED} ; {Activity date: 05/26/2021; Status: Approved; Inspector: JBURGE; Comment: Entered by VLEON1 - Approved. Pending Fire Final. Ok to make application for Letter of Completion.} ; {Activity date: 10/02/2020; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by VFLORES1 - PHASE 1 OK FOR TCO} ; {Activity date: 08/28/2020; Status: Partial Approval; Inspector: DMUNIZ; Comment: Entered by RSALDAT1 - Partial, Final Inspection For Completion of Phase 1 completed, Air Balance report to be submitted.}

Documents

File Name Document Type  
LETTER OF SUBSTANTIAL COMPLETION.PDF DOCUMENTS VIEW
REV1_REVISION LETTER.PDF DOCUMENTS VIEW
SIC.PDF DOCUMENTS VIEW
SPECS BLDG 4.PDF DOCUMENTS VIEW
REV1_PLAN SET.PDF CONSTRPLANS VIEW
PERMIT.PDF DOCUMENTS VIEW
APPLICATION.PDF DOCUMENTS VIEW
APPROVED SPECS.PDF DOCUMENTS VIEW