Permit: T19CM03062
Permit Details
Apply Date:
04/30/2019
Applicant:
Description:
SFR DRHT308018 T18-M0052
Permit Reviews
Permit Number - T19CM03062
Permit Status: Expired
Permit Description: SFR DRHT308018 T18-M0052
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
04/30/2019 | RESIDENTIAL - BLDG/ZONING-WALKTHRU | 04/30/2019 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T19CM03062
Permit Status: Expired
Permit Description: SFR DRHT308018 T18-M0052
Total Outstanding Activity Conditions - 4
Date | Name |
---|---|
04/30/2019 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
04/30/2019 | ROOF TRUSSES MUST BE APPROVED PRIOR TO FRAMING INSPECTION (P2I) |
04/30/2019 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
04/30/2019 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. |
Completed Inspections
Permit Status: Expired
Permit Number: T19CM03062
Permit Description: SFR DRHT308018 T18-M0052
Total Completed Inspections - 23
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
05/16/2019 | COT - RSPL - Yard Water Line | Passed | {Activity date: 05/16/2019; Status: Approved; Inspector: TVALENCIA; Comment: Entered by DMERANZ1 - } ; {Activity date: 05/14/2019; Status: Denied; Inspector: TVALENCIA; Comment: Entered by CBELL1 - 1- Work is incomplete} | |
05/16/2019 | COT - RSPL - Sewer | Passed | {Activity date: 05/16/2019; Status: Approved; Inspector: TVALENCIA; Comment: Entered by DMERANZ1 - } ; {Activity date: 05/14/2019; Status: Denied; Inspector: TVALENCIA; Comment: Entered by CBELL1 - 1- Work is incomplete} | |
05/16/2019 | COT - RSPL - Rough Soil | Passed | {Activity date: 05/16/2019; Status: Approved; Inspector: TVALENCIA; Comment: Entered by DMERANZ1 - } ; {Activity date: 05/14/2019; Status: Denied; Inspector: TVALENCIA; Comment: Entered by CBELL1 - 1- Work is incomplete} | |
05/16/2019 | COT - RSPL - Gas Pressure Test | Passed | {Activity date: 05/16/2019; Status: Approved; Inspector: TVALENCIA; Comment: Entered by DMERANZ1 - } | |
05/22/2019 | COT - RSBU - Preslab | Passed | {Activity date: 05/22/2019; Status: Approved; Inspector: MHASSAN; Comment: Entered by DMERANZ1 - make sure to have site plan on site included with your drawings or may result in a failed inspection as we need to verify setbacks.} ; {Activity date: 05/20/2019; Status: Not ready for Inspection; Inspector: TVALENCIA; Comment: Entered by DMERANZ1 - 1- Contractor called and cancelled the inspection request.} | |
05/22/2019 | COT - RSBU - Excavation/Rebar/Zoning | Passed | {Activity date: 05/22/2019; Status: Approved; Inspector: MHASSAN; Comment: Entered by DMERANZ1 - clean debris out of footings and make sure to maintain clearances around rebar.} ; {Activity date: 05/20/2019; Status: Not ready for Inspection; Inspector: TVALENCIA; Comment: Entered by DMERANZ1 - 1- Contractor called and cancelled the inspection request.} | |
06/04/2019 | COT - RSBU - Exterior Clips/Sheathing | Passed | {Activity date: 06/04/2019; Status: Approved; Inspector: MHASSAN; Comment: Entered by DMERANZ1 - } | |
06/10/2019 | COT - RSBU - Roof Nailing | Passed | {Activity date: 06/10/2019; Status: Approved; Inspector: TVALENCIA; Comment: Entered by CBELL1 - } ; {Activity date: 06/04/2019; Status: Not ready for Inspection; Inspector: MHASSAN; Comment: Entered by DMERANZ1 - please provide trust calx for upstairs. Only floor joist calx on site which those were checked. Please provide a secured ladder to inspect roof nailing.} | |
06/10/2019 | COT - RSEL - Electrical Underground | Passed | {Activity date: 06/10/2019; Status: Approved; Inspector: TVALENCIA; Comment: Entered by CBELL1 - } | |
06/19/2019 | COT - RSEL - Grounding/Bonding | Passed | {Activity date: 06/19/2019; Status: Approved; Inspector: RCAMACHO; Comment: Entered by DMERANZ1 - } ; {Activity date: 05/22/2019; Status: Approved; Inspector: MHASSAN; Comment: Entered by DMERANZ1 - rebar installed} | |
06/19/2019 | PDSD Building Division - TEP PM Clearance | Passed | {Activity date: 06/19/2019; Status: Approved; Inspector: RCAMACHO; Comment: Entered by DMERANZ1 - CODE ECO} | |
06/19/2019 | COT - RSEL - Construction Power | Passed | {Activity date: 06/19/2019; Status: Approved; Inspector: RCAMACHO; Comment: Entered by DMERANZ1 - ECO} ; {Activity date: 06/11/2019; Status: Denied; Inspector: TVALENCIA; Comment: Entered by DMERANZ1 - 1- Ufer ground conductor has not been landed. Please check work for completion prior to calling in for inspection request.} ; {Activity date: 06/10/2019; Status: Denied; Inspector: TVALENCIA; Comment: Entered by CBELL1 - 1- Ufer ground conductor is not landed.} | |
06/26/2019 | RSME - Mechanical Progress | Passed | {Activity date: 06/26/2019; Status: Approved; Inspector: TVALENCIA; Comment: Entered by DMERANZ1 - 1- Shall provide a clean out at the base of the 2 inch waste stack. 2- ABS pipe is not approved material for blocking of horizontal piping. 3- Shall provide Shield plates at 3 inch soil stack. 4- Range electric conductor not secured and sheathing torn. 5- Shall secure the closet flange to floor. Inspection stop.} |
|
07/09/2019 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | {Activity date: 07/09/2019; Status: Approved; Inspector: RCAMACHO; Comment: Entered by DMERANZ1 - } ; {Activity date: 07/05/2019; Status: Denied; Inspector: TVALENCIA; Comment: Entered by VFLORES1 - } ; {Activity date: 07/01/2019; Status: Denied; Inspector: DQUINN; Comment: Entered by DMERANZ1 - 1- ABS pipe is not approved material for blocking and support on horizontal waste and soil piping. 2- Shall secure and support horizontal water lines every 32 inches. 3- Shall support and block all horizontal waste and vent piping.} ; {Activity date: 06/26/2019; Status: Denied; Inspector: TVALENCIA; Comment: Entered by DMERANZ1 - } |
|
07/09/2019 | COT - LCBU - Framing | Passed | {Activity date: 07/09/2019; Status: Approved; Inspector: RCAMACHO; Comment: Entered by DMERANZ1 - } ; {Activity date: 07/05/2019; Status: Denied; Inspector: TVALENCIA; Comment: Entered by VFLORES1 - } ; {Activity date: 07/01/2019; Status: Denied; Inspector: DQUINN; Comment: Entered by DMERANZ1 - 1- ABS pipe is not approved material for blocking and support on horizontal waste and soil piping. 2- Shall secure and support horizontal water lines every 32 inches. 3- Shall support and block all horizontal waste and vent piping.} ; {Activity date: 06/28/2019; Status: Partial Approval; Inspector: RCAMACHO; Comment: Entered by DMERANZ1 - 1/2” ab’s 64” oc all #2 shear walls Pending all trades} ; {Activity date: 06/26/2019; Status: Denied; Inspector: TVALENCIA; Comment: Entered by DMERANZ1 - } |
|
07/09/2019 | COT - LCPL - Plumbing Intermediate | Passed | {Activity date: 07/09/2019; Status: Approved; Inspector: RCAMACHO; Comment: Entered by DMERANZ1 - } ; {Activity date: 07/05/2019; Status: Denied; Inspector: TVALENCIA; Comment: Entered by VFLORES1 - 1- See comments from previous inspection 2- Water line has penetrated through the top of the Second floor TGI} ; {Activity date: 07/01/2019; Status: Denied; Inspector: DQUINN; Comment: Entered by DMERANZ1 - 1- ABS pipe is not approved material for blocking and support on horizontal waste and soil piping. 2- Shall secure and support horizontal water lines every 32 inches. 3- Shall support and block all horizontal waste and vent piping.} |
|
07/17/2019 | COT - HCBU - Interior Shear Bracing | Passed | {Activity date: 07/17/2019; Status: Approved; Inspector: MHASSAN; Comment: Entered by DMERANZ1 - please have drawings on site at time of inspection or it may result in a failed inspection.} | |
08/30/2019 | COT - RSEL - Outdoor Lighting | Passed | {Activity date: 08/30/2019; Status: Approved; Inspector: ESTEVENS; Comment: Entered by DMERANZ1 - } | |
08/30/2019 | COT - RSPL - Plumbing Final | Passed | {Activity date: 08/30/2019; Status: Approved; Inspector: ESTEVENS; Comment: Entered by DMERANZ1 - } | |
08/30/2019 | RSPL - Plumbing Progress | Passed | {Activity date: 08/30/2019; Status: Approved; Inspector: ESTEVENS; Comment: Entered by DMERANZ1 - } | |
08/30/2019 | COT - RSEL - Electrical Final | Passed | {Activity date: 08/30/2019; Status: Approved; Inspector: ESTEVENS; Comment: Entered by DMERANZ1 - } | |
09/04/2019 | COT - RSME - Mechanical Final | Passed | {Activity date: 09/04/2019; Status: Approved; Inspector: DQUINN; Comment: Entered by DMERANZ1 - } ; {Activity date: 08/30/2019; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by DMERANZ1 - Unable to access air handler in attic. No ladder.} ; {Activity date: 04/30/2019; Status: Prior to Final Inspectn; Inspector: PMARTIN1; Comment: Entered by PMARTIN1 - ISSUED WITH PCRWRD CONDITIONS: NO PHYSICAL CONNECTION TO THE PUBLIC SEWER SYSTEM UNTIL THE PUBLIC SEWER G-2016-041 IS ACCEPTED AND RELEASED BY PCRWRD NO FINAL AND NO CERTIFICATE OF OCCUPANCY UNTIL THE PUBLIC SEWER G-2016-041 IS ACCEPTED AND RELEASED BY PCRWRD} |
|
09/04/2019 | RSBU - Building Final | Passed | {Activity date: 09/04/2019; Status: Approved; Inspector: DQUINN; Comment: Entered by DMERANZ1 - } ; {Activity date: 08/30/2019; Status: Partial Approval; Inspector: ESTEVENS; Comment: Entered by DMERANZ1 - Pending other inspections.} |