Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Passed
Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
| Date |
Description |
Inspector |
Results |
Comments |
| 07/09/2019 |
COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. |
RCAMACHO |
Approved |
Entered by DMERANZ1 - |
| 07/05/2019 |
COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. |
TVALENCIA |
Denied |
Entered by VFLORES1 - |
| 07/01/2019 |
COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. |
DQUINN |
Denied |
Entered by DMERANZ1 - 1- ABS pipe is not approved material for blocking and support on horizontal waste and soil piping.
2- Shall secure and support horizontal water lines every 32 inches.
3- Shall support and block all horizontal waste and vent piping. |
| 06/26/2019 |
COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. |
TVALENCIA |
Denied |
Entered by DMERANZ1 - |