Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Passed
Inspection History: COT - LCPL - Plumbing Intermediate
| Date |
Description |
Inspector |
Results |
Comments |
| 07/09/2019 |
COT - LCPL - Plumbing Intermediate |
RCAMACHO |
Approved |
Entered by DMERANZ1 - |
| 07/05/2019 |
COT - LCPL - Plumbing Intermediate |
TVALENCIA |
Denied |
Entered by VFLORES1 - 1- See comments from previous inspection
2- Water line has penetrated through the top of the Second floor TGI |
| 07/01/2019 |
COT - LCPL - Plumbing Intermediate |
DQUINN |
Denied |
Entered by DMERANZ1 - 1- ABS pipe is not approved material for blocking and support on horizontal waste and soil piping.
2- Shall secure and support horizontal water lines every 32 inches.
3- Shall support and block all horizontal waste and vent piping. |