Permit Details

Status:
C of o
Type:
COMMERCIAL ALTERATION
Address:
900 E 2ND ST
Address NEW:
900 E 2ND ST
Apply Date:
03/26/2019
Applicant:
METRO TUCSON EXPEDITING & DEVELOPMENT
Description:
TI: APARTMENTS
Contractors:
  • U E B BUILDERS INC *** APA ***

Permit Reviews

Permit Number - T19CM02107
Permit Status: C of o
Permit Description: TI: APARTMENTS
Start Date Submittal Complete Date Status  
03/26/2019 PLANS OK TO SUBMIT - COMM 03/26/2019 COMPLETED Review Details
04/01/2019 3RD PARTY REVIEW - COMMERCIAL TI 05/14/2020 COMPLETED Review Details
06/17/2020 3RD PARTY REVIEW - REVISION/OTHER 09/17/2020 COMPLETED Review Details

Outstanding Activity Conditions

Permit Number - T19CM02107
Permit Status: C of o
Permit Description: TI: APARTMENTS
Total Outstanding Activity Conditions - 1
Date Name
03/26/2019 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.

Completed Inspections

Permit Status: C of o
Permit Number: T19CM02107
Permit Description: TI: APARTMENTS
Total Completed Inspections - 31
Date Description Inspector Results Comments
06/22/2020 GAS CLEARANCE JBURGE Approved CODE
06/22/2020 PLUMBING - GAS PRESSURE TEST JBURGE Approved APPROVED
07/14/2020 TEP CLEARANCE - PM JBURGE Approved CODE ECO/ Level #800; 801; 802; 803; 804; 805; 807; 809; 810; 811; 812; 830; 831; 832; 833; 834; 834.

Level #9; 900; 901; 902; 903; 904; 905; 909; 910; 911; 912; 930; 931; 932; 933; 934; 936.
08/14/2020 FIRE - ALARM FINAL CBASALDUA Approved All devices tested and passed. Still need to test Two Way Communication and provide updated plans for any additions.
08/14/2020 FIRE - FINAL CBASALDUA Approved 1. Ok for TCO for occupancy on residential side pending Building Approval.
2. Mag Locks and Access Control to remain unlocked until test can be performed.
3. Site access/egress at Hotel Lobby to be looked at bvy Builiding Official later today.
4. Elevator inspector to commission elevators 4,5,and 6 for occupancy.
11/12/2020 MECHANICAL - FINAL JBURGE Approved 1090
11/12/2020 MECHANICAL - ABOVE CEILING JBURGE Approved 1090
11/12/2020 MECHANICAL - INTERMEDIATE JBURGE Approved 1090
11/12/2020 MECHANICAL - UNDERGROUND JBURGE Approved 1090
11/12/2020 PLUMBING - FINAL JBURGE Approved 1090
11/12/2020 PLUMBING - GAS PRESS TEST FNL JBURGE Approved 1090 - NO GAS CLEARANCE GIVEN
11/12/2020 PLUMBING - ROOF DRAINS JBURGE Approved 1090
11/12/2020 PLUMBING - ABOVE CEILING JBURGE Approved 1090
11/12/2020 PLUMBING - INTERMEDIATE JBURGE Approved 1090
11/12/2020 PLUMBING - ROUGH, SOIL JBURGE Approved 1090
11/12/2020 PLUMBING - PRE SLAB JBURGE Approved 1090
11/12/2020 OUTDOOR LIGHTING FINAL JBURGE Approved 1090
11/12/2020 ELECTRIC - FINAL JBURGE Approved 1090
11/12/2020 ELECTRIC - OUTDOOR LIGHTING JBURGE Approved 1090
11/12/2020 ELECTRIC - ABOVE CEILING JBURGE Approved 1090
11/12/2020 ELECTRIC - INTERMEDIATE JBURGE Approved 1090
11/12/2020 ELECTRIC - UNDERGROUND JBURGE Approved 1090
11/12/2020 BUILDING - FINAL JBURGE Approved 1090
11/12/2020 SHEET ROCK NAILING JBURGE Approved 1090
11/12/2020 FIREWALL/FIREBARRIER/FIRESTOP JBURGE Approved 1090
11/12/2020 BUILDING ABOVE CEILING JBURGE Approved 1090
11/12/2020 FRAMING JBURGE Approved 1090
11/12/2020 BUILDING PRE-SLAB JBURGE Approved 1090
11/12/2020 BUILDING - FINAL JBURGE Approved INSPECTOR APPROVED BUILDING FINAL. PENDING FIRE AND ENGINEERING.
11/17/2020 FIRE SPKLR - FINAL CBASALDUA Approved Sprinkler placement, water flows and tamper switches have been verified at previous date.
12/17/2020 ENGINEERING - FINAL DROBERTS Approved WE MET WITH ALEX AND WALKED SITE T SEE WHERE THEY ARE AT WITH THE SITE WORK. WE LOOKED OVER ALL OF THE EXTERIOR AREAS AND RAISED QUESTIONS ABOUT SOME AREAS THAT APPEARED TO BE NONCOMPLIANT FOR ADA. HE WILL HAVE THE ENGINEER OF RECORD PROVIDE US THE ADA PATHWAY AROUND THE SITE ON A PLAN SHEET SO THAT IT CAN BE INSPECTED NEXT WEEK AND VERIFIED. THERE ARE MANY AREAS WERE THERE ARE MULTIPLE GRADES THAT PREVENT IT ALL FROB BEING ADA COMPLIANT.