Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit: T19CM02107

Parcel: 12404100A


Addresses:

900 E 2ND ST


Inspection Status: Approved

Inspection History: ENGINEERING - FINAL

Permit Number - T19CM02107

Inspection Description - ENGINEERING - FINAL

Inspection Status - Approved

Date Description Inspector Results Comments
02/02/2021 ENGINEERING - FINAL Approved APPROVED
02/01/2021 ENGINEERING - FINAL Not Applicable
02/01/2021 ENGINEERING - FINAL Not Applicable NA
02/01/2021 ENGINEERING - FINAL Partial Approval 9027 ENGINEERING FINAL IS PARTIAL AT THIS TIME. CONTACTED ALEX WITH UEB, THIS INSPECTION WILL BE SCHEDULED FOR TOMORROW ALONG WITH THE DEVELOPMENT PACKAGE
12/17/2020 ENGINEERING - FINAL Partial Approval WE MET WITH ALEX AND WALKED SITE T SEE WHERE THEY ARE AT WITH THE SITE WORK. WE LOOKED OVER ALL OF THE EXTERIOR AREAS AND RAISED QUESTIONS ABOUT SOME AREAS THAT APPEARED TO BE NONCOMPLIANT FOR ADA. HE WILL HAVE THE ENGINEER OF RECORD PROVIDE US THE ADA PATHWAY AROUND THE SITE ON A PLAN SHEET SO THAT IT CAN BE INSPECTED NEXT WEEK AND VERIFIED. THERE ARE MANY AREAS WERE THERE ARE MULTIPLE GRADES THAT PREVENT IT ALL FROB BEING ADA COMPLIANT.
12/15/2020 ENGINEERING - FINAL Partial Approval IS PARTIAL AT THIS TIME, FINAL NOT TO BE GIVEN TILL ALL WORK FOR THE SITE IS COMPLETE. THIS INSPECTION WAS PERFORMED BY MARTIN HERNANDEZ AND THE INFORMATION HAS BEEN RELAYED TO ME WITH THE RESULTS. THIS INSPECTION WILL BE CALLED IN FOR ANOTHER WALK THROUGH WITH ALEX ON THURSDAY AT O AM.
08/20/2020 ENGINEERING - FINAL Partial Approval OK FOR A TCO, BUT NOT READY FOR A FINAL. WALKED THE SITE AND HAVE ADDRESSED SOME AREAS THAT NEED TI BE ATTENDED TO PRIOR TO ALLOWING PEDESTRIAN WITHIN THE PATHWAYS. GENERAL CLEANUP OF WORK AREAS THAT HAVE BEEN WORKED ON THROUGH THE NIGHT. MINOR SWEEPING OF ALL AREAS THAT WILL BE UTILIZED FOR ACCESS INTO THE BUILDING. THE CONTRACTOR IS HAULING PLANTING MATERIAL ALONG THE EAST SIDE OF THE BUILDING BYT IS PLANNING ON HAVING IT COMPLETE BY 8:00 am THIS MORNING. ADA COMPLIANCY HAS NOT BEEN FULLY CHECKED AND WILL BE EVALUATED AND CORRECTED OVER THE NEXT FEW WEEKS AS NEEDED.