Permit Details

Status:
C of o
Type:
COMMERCIAL NEW
Apply Date:
11/21/2017
Applicant:
SHAMBACH, ROBIN ADELE
Description:
NEW MEDICAL BLDG
Architects:
  • SHAMBACH, ROBIN ADELE
Contractors:
  • B F L CONSTRUCTION CO INC ,

Permit Reviews

Permit Number - T17CM08687
Permit Status: C of o
Permit Description: NEW MEDICAL BLDG
Start Date Submittal Complete Date Status  
01/02/2018 COMMERCIAL - NEW 01/29/2018 COMPLETED Review Details
01/29/2018 RESUBMITTAL 02/09/2018 COMPLETED Review Details
11/21/2017 PLANS OK TO SUBMIT - COMM 11/22/2017 COMPLETED Review Details
12/26/2018 REVISION - - 1ST 12/31/2018 COMPLETED Review Details

Outstanding Activity Conditions

Permit Number - T17CM08687
Permit Status: C of o
Permit Description: NEW MEDICAL BLDG
Total Outstanding Activity Conditions - 1
Date Name
11/21/2017 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.

Completed Inspections

Permit Status: C of o
Permit Number: T17CM08687
Permit Description: NEW MEDICAL BLDG
Total Completed Inspections - 48
Date Description Inspector Results Comments
04/05/2018 PLUMBING - PRE SLAB mramber1 Approved
04/10/2018 MECHANICAL - UNDERGROUND mramber1 Approved
04/13/2018 BUILDING PRE-SLAB mramber1 Approved
05/25/2018 PLUMBING - YARD WTR LINE/TEST mramber1 Approved
07/06/2018 PLUMBING - ROUGH, SOIL dflores2 Approved ALL OF FIRST FLOOR ROUGH,SOIL (3005) HAS BEEN INSPECTED AND IS DONE ACCORDING TO JOB SUPER.
08/21/2018 PLUMBING - ROOF DRAINS DQUINN Approved
08/23/2018 REINFORCED MASONRY PRE-GROUT BJONES Approved FINAL LIFT ON SCREEN WALLS SOUTH SIDE OF BUILDING
09/20/2018 ELECTRIC - UNDERGROUND DQUINN Approved TEP UNDERGROUND RUN TO BUILDING OK TO BACKFILL
10/23/2018 TEP CLEARANCE - AM RCAMACHO Approved ECO
12/14/2018 MECHANICAL - PROGRESS DMCCARTHY Approved Zone one, two, and 5
12/14/2018 MECHANICAL - ABOVE CEILING DMCCARTHY Approved Zone one, two, and 5
12/14/2018 MECHANICAL - INTERMEDIATE DMCCARTHY Approved
12/14/2018 ELECTRIC - OUTDOOR LIGHTING DMCCARTHY Approved
12/20/2018 EXCAVATION/LAYOUT REBAR & ZON RCHANDLER Approved
12/20/2018 PLUMBING - PROGRESS RCHANDLER Approved
12/20/2018 SHEET ROCK NAILING RCHANDLER Approved
12/20/2018 PLUMBING - INTERMEDIATE RCHANDLER Approved
12/20/2018 PLUMBING - ABOVE CEILING RCHANDLER Approved
12/20/2018 ELECTRIC - ABOVE CEILING RCHANDLER Approved
12/20/2018 ELECTRIC - INTERMEDIATE RCHANDLER Approved
12/20/2018 FRAMING RCHANDLER Approved
12/27/2018 PLUMBING - FINAL DMCCARTHY Approved NEED STERILIZATION REPORT
12/27/2018 SITE - SEWER DMCCARTHY Approved upgraded from partial
12/28/2018 FIRE - FINAL CBASALDUA Approved 1. Ok for TCO for stocking.
2. Will need Fire Final once elevators are ready, as well as EM Lights and Sprinkler additions.
12/28/2018 FIRE - ALARM FINAL CBASALDUA Approved
12/28/2018 FIRE SPKLR - FINAL CBASALDUA Approved
12/31/2018 ELECTRIC - SERVICE UPGRADE RCHANDLER Approved approved upon 2090 approval from RCHANDLER
12/31/2018 ENGINEERING - FINAL BBENEDON Approved Pavement and accessible parking has been installed. Ttere is access from the parking lot into the building, but there is no pedestrian access from the street into the building. There is work on the DP to be completed including landscape and sidewalks.
12/31/2018 MECHANICAL - FINAL DMCCARTH Approved NEED AIR BALANCE REPORT
12/31/2018 OUTDOOR LIGHTING FINAL RCHANDLER Approved Pending SI.
12/31/2018 ELECTRIC - FINAL RCHANDLER Approved
12/31/2018 ELECTRIC - PROGRESS RCHANDLER Approved
12/31/2018 ELECTRIC - UFER RCHANDLER Approved approved upon 2090 approval from Robert C
12/31/2018 BUILDING - FINAL RCHANDLER Approved Pending other inspections.
12/31/2018 BUILDING - PROGRESS RCHANDLER Approved
12/31/2018 U VALUE FOR WINDOW RCHANDLER Approved
12/31/2018 BUILDING ABOVE CEILING RCHANDLER Approved
12/31/2018 ROOF NAILING RCHANDLER Approved
12/31/2018 EXT METAL CLIPS/EXT SHEATHING RCHANDLER Approved
12/31/2018 STEM WALL/RETAINING WALL RCHANDLER Approved
12/31/2018 ENGINEERING - FINAL DROBERTS Approved OK FOR A TCO
02/08/2019 PLUMBING - MEDICAL GAS/FINAL MHASSAN Approved see attached paperwork from Adams engineering stating that med gas is not applicable and only vacuum pump is what is installed
02/08/2019 PLUMBING - MEDICAL GAS/TEST MHASSAN Approved see attached paperwork from Adams engineering stating that med gas is not applicable and only vacuum pump is what is installed
02/08/2019 PLUMBING - MD GAS/PRECONST MTG MHASSAN Approved see attached paperwork from Adams engineering stating that med gas is not applicable and only vacuum pump is what is installed
02/08/2019 CERTIFICATE OF OCCUPANCY DQUINN Approved
02/08/2019 PLUMBING - MEDICAL GAS/FINAL RSHERRY Approved No Med Gas - Vacuum and compressed air only
02/08/2019 PLUMBING - MEDICAL GAS/TEST RSHERRY Approved No Med Gas - Vacuum and compressed air only
02/08/2019 PLUMBING - MD GAS/PRECONST MTG RSHERRY Approved No Med Gas - Vacuum and compressed air only

Documents

File Name Document Type  
None CERT OF OCC VIEW
T17CM08687 CERT OF OCC.PDF CERT OF OCC VIEW
None CERT OF OCC VIEW
T17CM08687 CERT OF OCC.PDF CERT OF OCC VIEW
TEMP C OF O -T17CM08687.PDF CERT OF OCC VIEW
2_CONST_PLAN.PDF CONSTRPLANS VIEW
001_DG1.1.TIF CONSTRPLANS VIEW
None DOCUMENTS VIEW
1_MECH_LOAD_CALCS.PDF DOCUMENTS VIEW
1_PERMIT.PDF DOCUMENTS VIEW
1_SITE_PLAN.PDF DOCUMENTS VIEW
1_SPEC_INSP.PDF DOCUMENTS VIEW
1_SPEC_PROVISIONS.PDF DOCUMENTS VIEW
CONTRACTOR LETTER.PDF.PDF DOCUMENTS VIEW
None DOCUMENTS VIEW
1_APPLICATION DOCUMENTS VIEW
None DOCUMENTS VIEW
T17CM08687 AIR BALANCE.PDF DOCUMENTS VIEW
None DOCUMENTS VIEW