Permit: T17CM08687

Parcel: 129101290

Inspection Status: Approved

Inspection History: FIRE - FINAL

Permit Number - T17CM08687

Inspection Description - FIRE - FINAL

Inspection Status - Approved

Date Description Inspector Results Comments
02/07/2019 FIRE - FINAL Approved
01/11/2019 FIRE - FINAL Partial Approval Okay for TCO for occupancy pending other approvals. One room identified to the contractor shall not be occupied a sprinkler needs to be added. EM lights okay minus two in stairwell and one on second floor hall. Sprinklered head needs to be lowered in mechanical room blocked by duct.
12/28/2018 FIRE - FINAL Partial Approval 1. Ok for TCO for stocking.
2. Will need Fire Final once elevators are ready, as well as EM Lights and Sprinkler additions.
12/27/2018 FIRE - FINAL Denied Second floor was not synchronized. All test need to be done. Did pull station only.