Permit: T11BU01702
Permit Details
Apply Date:
12/22/2011
Applicant:
BEHRANA, JAMSHEED D
Description:
GRADING/SWPPP
Contractors:
- BARKER MORRISSEY CONTRACTING INC **APA**
Permit Reviews
Permit Number - T11BU01702
Permit Status: Final
Permit Description: GRADING/SWPPP
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/23/2012 | RESUBMITTAL - GRADING | 04/04/2012 | COMPLETED |
| 04/24/2013 | REVISION - GRADING | 05/14/2013 | COMPLETED |
| 12/22/2011 | PLANS OK TO SUBMIT - GRADING | 12/22/2011 | COMPLETED |
| 12/22/2011 | GRADING | 01/17/2012 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T11BU01702
Permit Status: Final
Permit Description: GRADING/SWPPP
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 12/22/2011 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Completed Inspections
Permit Status: Final
Permit Number: T11BU01702
Permit Description: GRADING/SWPPP
Total Completed Inspections - 14
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/04/2012 | NPPO PRE PERMIT INSPECTION | MRUSSO | Approved | 1) CONTRACTOR WILL SUBSTITUTE TWO MESQUITE TREES WITH LIKE TREES SHOWN ON NPPO SURVEY. THE TWO TREES SHOWN ON THE PHOTO ARE NOT THERE. 2) CONTRACTOR STATED HE WILL PRESERVE MORE TREES THAN SHOWN ON THE PLAN ALONG THE NORTH AND EAST BOUNDRY IF POSSIBLE. |
| 05/04/2012 | ENGINEERING PRE-CONSTRUCTION | MRUSSO | Approved | 1) MET WITH SUPERINTENDENT ON SITE, DISCUSSED SWPPP, REVIEWED GRADING PLAN, AND INSPECTED PER THE NPPO. 2) ENSURE A STABILIZED ENTRANCE/EXIT IS INSTALLED AND MAINTAINED WHERE NEEDED. 3) COMPLETE INSTALLATION OF SILT SOCK ALONG NORTH PERIMETER AND ALONG EAST PROPERTY BOUNDRY. 4) MAINTAIN SEDIMENT CONTROLS THROUGHOUT CONSTRUCTION. 5) INSTALL A CONCRETE/MATERIALS WASH-OUT ON SITE WHEN APPLICABLE. 6) ENSURE FUELS/OILS, PAINTS AND OTHER CHEMICALS USED ON SITE ARE STORED PROPERLY. 7) PERFORM SELF INSPECTIONS PER YOUR SWPPP AND DOCUMENT THEM. 8) POST A COPY OF YOUR NOI AT THE ENTRANCE TO THE SITE. |
| 05/15/2012 | STORMWATER INSTALL OF CONTROLS | MRUSSO | Approved | 1) MET WITH SUPERINTENDENT ON SITE, DISCUSSED SWPPP, REVIEWED GRADING PLAN, AND INSPECTED PER THE NPPO. 2) ENSURE A STABILIZED ENTRANCE/EXIT IS INSTALLED AND MAINTAINED WHERE NEEDED. 3) COMPLETE INSTALLATION OF SILT SOCK ALONG NORTH PERIMETER AND ALONG EAST PROPERTY BOUNDRY. 4) MAINTAIN SEDIMENT CONTROLS THROUGHOUT CONSTRUCTION. 5) INSTALL A CONCRETE/MATERIALS WASH-OUT ON SITE WHEN APPLICABLE. 6) ENSURE FUELS/OILS, PAINTS AND OTHER CHEMICALS USED ON SITE ARE STORED PROPERLY. 7) PERFORM SELF INSPECTIONS PER YOUR SWPPP AND DOCUMENT THEM. 8) POST A COPY OF YOUR NOI AT THE ENTRANCE TO THE SITE. |
| 12/06/2012 | STORMWATER FOLLOW-UP INSP | MRUSSO | Approved | SITE COMPLETED, AWAITING FINAL APPROVAL , WILL SPEAK WITH DAVE ROBERTS |
| 12/28/2012 | GRADING - FINAL | MRUSSO | Approved | AWAITING AS-BUILT SUBMITTAL AND CERT STATEMENT FROM THE ENG OF RECORD |
| 12/28/2012 | SWPPP CORRECTION NOTICE | MRUSSO | Approved | |
| 12/28/2012 | LANDSCAPE INSPECTION | MRUSSO | Approved | |
| 12/28/2012 | GRADING - INTERMEDIATE | MRUSSO | Approved | |
| 12/28/2012 | GRADING - CHECK FOR ACTIVITY | MRUSSO | Approved | |
| 12/28/2012 | GRADING - TIER REV | MRUSSO | Approved | |
| 10/16/2013 | STORMWATER FINAL INSPECTION | MRUSSO | Approved | |
| 06/10/2020 | RAINWATER - FINAL | DROBERTS | Approved | |
| 06/10/2020 | RAINWATER - INTERMEDIATE | DROBERTS | Approved | |
| 06/10/2020 | GRADING - REBAR | DROBERTS | Approved |