Inspection History Details
Inspection Status: Approved
Inspection History: STORMWATER FOLLOW-UP INSP
Permit Number - T11BU01702
Inspection Description - STORMWATER FOLLOW-UP INSP
Inspection Status - Approved
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/06/2012 | STORMWATER FOLLOW-UP INSP | Approved | SITE COMPLETED, AWAITING FINAL APPROVAL , WILL SPEAK WITH DAVE ROBERTS | |
| 08/23/2012 | STORMWATER FOLLOW-UP INSP | Continued | NO CONCERNS AT THIS TIME. | |
| 08/21/2012 | STORMWATER FOLLOW-UP INSP | Continued | NO CONCERNS AT THIS TIME. | |
| 07/30/2012 | STORMWATER FOLLOW-UP INSP | Continued | NO CONCERNS AT THIS TIME. THE SITE APPEARS TO BE HANDLING THE RAINS OVER THE PAST TWO WEEKS. | |
| 06/28/2012 | STORMWATER FOLLOW-UP INSP | Continued | PREVIOUS COMPLAINTS OF TRACKOUT HAVE BEEN CLEANED AT THIS TIME. THE CREW WILL INSTALL ADDITIONAL MATERIALS IN THE FUTURE TOO HELP PREVENT THIS FROM HAPPENING AGAIN. | |
| 06/21/2012 | STORMWATER FOLLOW-UP INSP | Correction Required | COMPLAINT GIVEN FOR TRACKING OF SOIL ONTO PUBLIC ROADWAY: 1) RE-ESTABLISH YOUR STABILIZED CONSTRUCTION ENTRANCE 2) SWEEP UP TRACKED SOIL MORE OFTEN. SITE IS CURRENTLY UNDER A STORM WATER PERMIT COMPLY BY 7 WORKING DAYS, NON-COMPLIANCE WILL RESULT IN A NOTICE OF VIOLATION. |
|
| 06/18/2012 | STORMWATER FOLLOW-UP INSP | Continued | 1) TWO STORM DRAIN LINES HAVE BEEN INSTALLED. ONE CARRIES STORM WATER FROM ROOF DRAINS AND SURFACE DRAINAGE. AND ONE STORM DRAIN LINE RUNS FROM THE RET/DET BASIN TO THE RIGHT OF WAY. A STATEMENT FROM THE ENGINEER OF RECORD IS REQUIRED STATING THAT THE BELOW GROUND SD LINE WERE INSTALLED PER THE APPROVED PLANS. 2) CONTINUE TO ROUTINELY SWEEP UP TRACKED SOIL OFF PUBLIC ROADWAYS. 3) CALL FOR INSPECTION PRIOR TO INSTALL OF CATCH BASINS ON SITE. 4) NEED TO MEASUR RET/DET BASIN ON SITE AND ADD TO OUR EXISTING DATA BASE. 5) NO OTHER STORM WATER CONCERNS AT THIS TIME. |
|
| 06/07/2012 | STORMWATER FOLLOW-UP INSP | Continued | 1) CLEAN OUT CONCRETE WASH OUT. 2) RE-ESTABLISH YOUR STABILIZED CONSTRUCTION ENTRANCES. 3) CONTINUE TO SWEEP UP TRACKED SOIL OFF SILVERBELL ROAD ON A ROUTINE BASIS. 4) CALL FOR AN INSPECTION FOR ANY CJANGES TO THE ORIGINAL GRADING PLAND AND/OR ANY CONCERNS WITH SITE WORK. |
|
| 05/15/2012 | STORMWATER FOLLOW-UP INSP | Continued | NO CHANGES AND/OR CONCERNS AT THIS TIME. MAY NEED TO ADD ROCK TO STABILIZED CONSTRUCTION ENTRANCE. NO OTHER STORM WATER CONCERNS. |