Inspection Status: Approved
Inspection History: GRADING - INTERMEDIATE
Permit Number - T11BU01702
Inspection Description - GRADING - INTERMEDIATE
Inspection Status - Approved
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/28/2012 | GRADING - INTERMEDIATE | Approved | ||
| 09/20/2012 | GRADING - INTERMEDIATE | Continued | MET WITH THE CREW ONSITE TOO SEE WHAT WORK IS HAPPENING AT THIS TIME. FINE GRADING OF THE BASIN IS STARTING AS WELL AS GENERAL CLEAN-UP OF THE SITE. THIS SITE WILL BE LOOKED AT IN THE NEAR FUTURE FOR THERELEASE OF THE BUILDING C OF O, AND THEN FOR THE FINAL GRADING OF THE SITE. | |
| 08/23/2012 | GRADING - INTERMEDIATE | Continued | MINOR WORK AT THIS TIME DUE TO THE PREVIOUS RAINS THIS WEEK. | |
| 07/26/2012 | GRADING - INTERMEDIATE | Continued | CREWS STILL WORKING ON THE GRADING FOR SIDEWALKS, AND CURBS FOR THIS SITE. ALSO WORKING ON THE PARKING LOT AND PAALS FOR THE SITE. CONTINUING TO CONSTRUCT THE WALL ALONG THE EAST SIDE OF THE SITE. | |
| 07/05/2012 | GRADING - INTERMEDIATE | Continued | NO CONCERNS AT THIS TIME, MINOR TRACKOUT NOTED ON SILVERBELL FROM LAST RAIN. | |
| 06/28/2012 | GRADING - INTERMEDIATE | Continued | CREWS CONTINUE TO WORK ON THE BUILDING CONSTRUCTION, THEY WILL BE INSTALLING THE UNDERGROUND WATER STORAGE TANK THIS NEXT WEEK. | |
| 06/21/2012 | GRADING - INTERMEDIATE | Correction Required | COMPLAINT GIVEN FOR TRACKING OF SOIL ONTO PUBLIC ROADWAY: 1) RE-ESTABLISH YOUR STABILIZED CONSTRUCTION ENTRANCE 2) SWEEP UP TRACKED SOIL MORE OFTEN. SITE IS CURRENTLY UNDER A STORM WATER PERMIT COMPLY BY 7 WORKING DAYS, NON-COMPLIANCE WILL RESULT IN A NOTICE OF VIOLATION. |
|
| 06/18/2012 | GRADING - INTERMEDIATE | Continued | 1) TWO STORM DRAIN LINES HAVE BEEN INSTALLED. ONE CARRIES STORM WATER FROM ROOF DRAINS AND SURFACE DRAINAGE. AND ONE STORM DRAIN LINE RUNS FROM THE RET/DET BASIN TO THE RIGHT OF WAY. A STATEMENT FROM THE ENGINEER OF RECORD IS REQUIRED STATING THAT THE BELOW GROUND SD LINE WERE INSTALLED PER THE APPROVED PLANS. 2) CONTINUE TO ROUTINELY SWEEP UP TRACKED SOIL OFF PUBLIC ROADWAYS. 3) CALL FOR INSPECTION PRIOR TO INSTALL OF CATCH BASINS ON SITE. 4) NEED TO MEASUR RET/DET BASIN ON SITE AND ADD TO OUR EXISTING DATA BASE. 5) NO OTHER STORM WATER CONCERNS AT THIS TIME. |
|
| 06/07/2012 | GRADING - INTERMEDIATE | Continued | 1) CLEAN OUT CONCRETE WASH OUT. 2) RE-ESTABLISH YOUR STABILIZED CONSTRUCTION ENTRANCES. 3) CONTINUE TO SWEEP UP TRACKED SOIL OFF SILVERBELL ROAD ON A ROUTINE BASIS. 4) CALL FOR AN INSPECTION FOR ANY CJANGES TO THE ORIGINAL GRADING PLAND AND/OR ANY CONCERNS WITH SITE WORK. |
|
| 05/15/2012 | GRADING - INTERMEDIATE | Continued | NO CHANGES AND/OR CONCERNS AT THIS TIME. MAY NEED TO ADD ROCK TO STABILIZED CONSTRUCTION ENTRANCE. NO OTHER STORM WATER CONCERNS. |