Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING PRE-CONSTRUCTION
Permit Number - T11BU01702
Inspection Description - ENGINEERING PRE-CONSTRUCTION
Inspection Status - Approved
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/04/2012 | ENGINEERING PRE-CONSTRUCTION | Approved | 1) MET WITH SUPERINTENDENT ON SITE, DISCUSSED SWPPP, REVIEWED GRADING PLAN, AND INSPECTED PER THE NPPO. 2) ENSURE A STABILIZED ENTRANCE/EXIT IS INSTALLED AND MAINTAINED WHERE NEEDED. 3) COMPLETE INSTALLATION OF SILT SOCK ALONG NORTH PERIMETER AND ALONG EAST PROPERTY BOUNDRY. 4) MAINTAIN SEDIMENT CONTROLS THROUGHOUT CONSTRUCTION. 5) INSTALL A CONCRETE/MATERIALS WASH-OUT ON SITE WHEN APPLICABLE. 6) ENSURE FUELS/OILS, PAINTS AND OTHER CHEMICALS USED ON SITE ARE STORED PROPERLY. 7) PERFORM SELF INSPECTIONS PER YOUR SWPPP AND DOCUMENT THEM. 8) POST A COPY OF YOUR NOI AT THE ENTRANCE TO THE SITE. |
|
| 04/11/2012 | ENGINEERING PRE-CONSTRUCTION | Not ready for Inspection | NO ACTIVITY | |
| 03/01/2012 | ENGINEERING PRE-CONSTRUCTION | Not ready for Inspection | NO ACTIVITY |