Permit: T10BU01890
Permit Details
Apply Date:
12/21/2010
Applicant:
METRO PERMIT EXPRESS, INC *C
Description:
GRADING FOR NEW CLASSROOM
Architects:
- BOLLARD, MARK EDWARD
Contractors:
- CORE CONSTRUCTION SERVICES OF AZ *C*
Permit Reviews
Permit Number - T10BU01890
Permit Status: Final
Permit Description: GRADING FOR NEW CLASSROOM
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/21/2011 | RESUBMITTAL - GRADING | 02/22/2011 | COMPLETED |
| 12/21/2010 | PLANS OK TO SUBMIT - GRADING | 12/21/2010 | COMPLETED |
| 12/21/2010 | GRADING | 01/14/2011 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T10BU01890
Permit Status: Final
Permit Description: GRADING FOR NEW CLASSROOM
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 12/21/2010 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Completed Inspections
Permit Status: Final
Permit Number: T10BU01890
Permit Description: GRADING FOR NEW CLASSROOM
Total Completed Inspections - 10
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/07/2011 | ENGINEERING PRE-CONSTRUCTION | MRUSSO | Approved | 1) CONTACTED SUPERINTENDENT, DISCUSSED GRADING PLAN AND SITE WORK FOR PROJECT. 2) SITE IS < 1ACRE NO SWPPP REQUIRED 3) CALL FOR INSPECTION PRIOR TO STORM DRAIN PIPE AND/OR CATCH BASINS BEING INSTALLED. 4) PRIOR TO FINAL GRADING APPROVAL, COT WILL REQUIRE A DRAINAGE CERTIFICATION STATEMENT FROM THE ENG OF RECORD. 5) SWEEP UP TRACKED SOIL OFF ADJACENT PUBLIC ROADWAY AS NEEDED. 6) MAY NEED TO INSTALL TEMP SEDIMENT CONTROLS ALONG THE WEST PERIMETER |
| 10/03/2011 | GRADING - INTERMEDIATE | MRUSSO | Approved | 1) ESTABLISH A STABILIZED CONSTRUCTION ENTRANCE/EXIT ON SITE . 2) REMOVE DIRT FROM CHAIN LINK FENCE ALONG THE WEST PERIMETER. 3) CLEAN OUT STORM DRAIN CATCH BASINS. IAW THE CITY OF TUCSON STORM WATER ORDINANCE # 10209, THE ABOVE VIOLATIONS COULD RESULT IN A DISCHARGE OF POLLUTANTS FROM THE CONSTRUCTION SITE. COMPLY WITHIN 7 WORKING DAYS, NON-COMPLIANCE WILL RESULT IN A NOTICE OF VIOLATION. |
| 12/14/2011 | STORMWATER FOLLOW-UP INSP | MRUSSO | Approved | NO STORM WATER CONCERNS AT THIS TIME |
| 01/11/2012 | LANDSCAPE - FINAL | MRUSSO | Approved | |
| 01/11/2012 | RAINWATER - FINAL | MRUSSO | Approved | |
| 01/11/2012 | GRADING - FINAL | MRUSSO | Approved | ENGINEERING CERTIFICATION STATEMENT HAS BEEN ACCEPTED AND FILED WITH THE FOLDER. ALL SITE WORK HAS BEEN COMPLETED PER THE APPROVED PLANS |
| 03/01/2012 | PERMIT FINALED | KMEDINA | Approved | |
| 06/10/2020 | RAINWATER - INTERMEDIATE | DROBERTS | Approved | |
| 06/10/2020 | GRADING - CHECK FOR ACTIVITY | DROBERTS | Approved | |
| 06/10/2020 | GRADING - REBAR | DROBERTS | Approved |