Inspection History Details
Inspection Status: Approved
Inspection History: STORMWATER FOLLOW-UP INSP
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/10/2020 | STORMWATER FOLLOW-UP INSP | Approved | ||
| 12/14/2011 | STORMWATER FOLLOW-UP INSP | Continued | NO STORM WATER CONCERNS AT THIS TIME | |
| 10/12/2011 | STORMWATER FOLLOW-UP INSP | Continued | 1) CONSTRUCTION ENTRANCE/EXIT HAS BEEN SWEEPED. REMOVABLE WADDLE IS INSTALLED IN FRONT OF EXIT. 2) DIRT HAS BEEN REMOVED OFF OF WEST FENCE AND WADDLE HAS BEEN INSTALLED. 3) ENSURE STORM WATER CATCH BASINS ARE CLEANED PRIOR TO FINAL APPROVAL. |
|
| 09/23/2011 | STORMWATER FOLLOW-UP INSP | Correction Required | 1) RE-ESTABLISH YOUR CONSTRUCTION ENTRANCE/EXIT. 2) SWEEP UP TRACKED SOIL OFF OF PUBLIC ROADWAY 3) REMOVE DIRT FROM CHAIN LINK FENCE ALONG WEST BOUNDRY OF SITE - THE FENCE IS NOT AN ACCEPTABLE MEANS OF SEDIMENT CONTROLS . 4) CLEAN OUT ALL STORM WATER CATCH BASIN ON SITE, THEY HAVE ALL SILTED IN AND SOME NEED REPAIR. |
|
| 06/22/2011 | STORMWATER FOLLOW-UP INSP | Continued | 1) NEED TO SWEEP UP SOIL OFF PUBLIC ROADWAY 2) NEED TO INSTALL A STABILIZED CONSTRUCTION ENTRANCE 3) INSTALL A BIRM AND/OR SEDIMENT CONTROLS AROUND CONCRETE BATCH PLANT. 4) ENSURE CATCH BASINS ARE COVERED/PROTECTED FROIL DISTURBED SOIL |