Permit: T10BU01890

Parcel: 10709092A


Addresses:

515 W KELSO ST

Inspection Status: Approved

Inspection History: GRADING - INTERMEDIATE

Date Description Inspector Results Comments
01/11/2012 GRADING - INTERMEDIATE Approved
10/03/2011 GRADING - INTERMEDIATE Correction Required 1) ESTABLISH A STABILIZED CONSTRUCTION ENTRANCE/EXIT ON SITE .
2) REMOVE DIRT FROM CHAIN LINK FENCE ALONG THE WEST PERIMETER.
3) CLEAN OUT STORM DRAIN CATCH BASINS.

IAW THE CITY OF TUCSON STORM WATER ORDINANCE # 10209, THE ABOVE VIOLATIONS COULD RESULT IN A DISCHARGE OF POLLUTANTS FROM THE CONSTRUCTION SITE.

COMPLY WITHIN 7 WORKING DAYS, NON-COMPLIANCE WILL RESULT IN A NOTICE OF VIOLATION.
09/23/2011 GRADING - INTERMEDIATE Correction Required 1) RE-ESTABLISH YOUR CONSTRUCTION ENTRANCE/EXIT.
2) SWEEP UP TRACKED SOIL OFF OF PUBLIC ROADWAY
3) REMOVE DIRT FROM CHAIN LINK FENCE ALONG WEST BOUNDRY OF SITE - THE FENCE IS NOT AN ACCEPTABLE MEANS OF SEDIMENT CONTROLS .
4) CLEAN OUT ALL STORM WATER CATCH BASIN ON SITE, THEY HAVE ALL SILTED IN AND SOME NEED REPAIR.
06/22/2011 GRADING - INTERMEDIATE Continued 1) NEED TO SWEEP UP SOIL OFF PUBLIC ROADWAY
2) NEED TO INSTALL A STABILIZED CONSTRUCTION ENTRANCE
3) INSTALL A BIRM AND/OR SEDIMENT CONTROLS AROUND CONCRETE BATCH PLANT.
4) ENSURE CATCH BASINS ARE COVERED/PROTECTED FROIL DISTURBED SOIL
04/27/2011 GRADING - INTERMEDIATE Continued FOLLOW UP INSPECTION, NO CHANGES, NO CONCERNS AT THIS TIME
04/25/2011 GRADING - INTERMEDIATE Continued TOOK PICTURES OF 12" STORM DRAIN PIPING AND CATCH BASINS - INSTALLATION HAS BEEN DONE PER THE APPROVED PLANS. ENSURE TO INSTALL FILTER FABRIC IN BUBBLER BOX /8" OF 1" ROCK W/ 2' OF BIGGER ROCK BELOW IT.
ENSURE POSITIVE DRAINAGE THROUGHOUT THE PIPE ---OK TO BURY.
NO SIGNIFICAT STORM WATER CONCERNS
04/07/2011 GRADING - INTERMEDIATE Continued 1) CONTACTED SUPERINTENDENT, DISCUSSED GRADING PLAN AND SITE WORK FOR PROJECT.
2) SITE IS < 1ACRE NO SWPPP REQUIRED
3) CALL FOR INSPECTION PRIOR TO STORM DRAIN PIPE AND/OR CATCH BASINS BEING INSTALLED.
4) PRIOR TO FINAL GRADING APPROVAL, COT WILL REQUIRE A DRAINAGE CERTIFICATION STATEMENT FROM THE ENG OF RECORD.
5) SWEEP UP TRACKED SOIL OFF ADJACENT PUBLIC ROADWAY AS NEEDED.
6) MAY NEED TO INSTALL TEMP SEDIMENT CONTROLS ALONG THE WEST PERIMETER