Permit: T09BU01354
Permit Details
Apply Date:
09/10/2009
Applicant:
WOLFARTH, KIM EDWARD
Description:
GRADING: S/E CORNER & ALONG ALAMO WASH
Architects:
- WOLFARTH, KIM EDWARD
Contractors:
- BORDERLAND CONSTRUCTION COMPANY *C
Permit Reviews
Permit Number - T09BU01354
Permit Status: Final
Permit Description: GRADING: S/E CORNER & ALONG ALAMO WASH
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
02/02/2010 | RESUBMITTAL - GRADING | 02/02/2010 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T09BU01354
Permit Status: Final
Permit Description: GRADING: S/E CORNER & ALONG ALAMO WASH
Total Outstanding Activity Conditions - 1
Date | Name |
---|---|
09/10/2009 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Completed Inspections
Permit Status: Final
Permit Number: T09BU01354
Permit Description: GRADING: S/E CORNER & ALONG ALAMO WASH
Total Completed Inspections - 9
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
04/21/2010 | STORMWATER INSTALL OF CONTROLS | MRUSSO | Approved | THE MAJORITY OF TEMP SEDIMENT CONTROLS HAVE BEEN INSTALLED, SUPPLEMENTAL CONTROLS MAY BE ADDED AT THE INSPECTORS REQUEST. |
05/04/2010 | ENGINEERING PRE-CONSTRUCTION | MRUSSO | Approved | |
10/05/2010 | GRADING - FINAL | MRUSSO | Approved | 1) PRIOR TO FINAL APPROVAL BY ENGINNERING, CLEAN OUT SOIL FROM ALL EXISTING AND NEW CATCH BASINS. 2) PROVIDE A REVISED PLAN SHOWING CHANGES TO THE LOCATION/CONFIGURATION OF THE STORM DRAIN LINE AND TIE-IN TO RET/DET SYSTEM. 3) CONTRACTOR TO POUR CONCRETE COLLAR CONNECTION ON 24" STORM DRAIN LINE AT MH #1, #2 AND THE FLORR FOR MH#3. 4) 24" AND 15" CATCH BASINS (NYOPLAST) INSTALLED AT NE CORNER OF BLDG. 5) PICTURES TAKEN OF EACH CONNECTION, WE RE-INSPECT. 6) NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME. 7) ALL CHANGES TO STORM DRAINAGE CONFIGURATION, LOCATION, PIPE SIZES, MUST BE SHOWN ON AN APPROVED REVISED PLAN. |
12/23/2011 | STORMWATER FOLLOW-UP INSP | MRUSSO | Approved | CHANGES MADE TO STORM DRAIN PIPING AT STREET CROSSING ALONG NE CORNER OF SITE. HAVE DRAWING FROM THE ENGINEER OF RECORD SHOWING THE CHANGES MADE AND HOW THE DIFFER FROM THE CITY APPROVED PLAN. WILL ASK REVIEWER IF CONTRACTOR NEEDES TO SUBMIT A REVISION TO THE CITY. NO STORM WATER CONCERNS AT THIS TIME |
12/23/2011 | GRADING - TIER REV | MRUSSO | Approved | CHANGES MADE TO STORM DRAIN PIPING AT STREET CROSSING ALONG NE CORNER OF SITE. HAVE DRAWING FROM THE ENGINEER OF RECORD SHOWING THE CHANGES MADE AND HOW THE DIFFER FROM THE CITY APPROVED PLAN. WILL ASK REVIEWER IF CONTRACTOR NEEDES TO SUBMIT A REVISION TO THE CITY. NO STORM WATER CONCERNS AT THIS TIME |
12/23/2011 | GRADING - INTERMEDIATE | MRUSSO | Approved | CHANGES MADE TO STORM DRAIN PIPING AT STREET CROSSING ALONG NE CORNER OF SITE. HAVE DRAWING FROM THE ENGINEER OF RECORD SHOWING THE CHANGES MADE AND HOW THE DIFFER FROM THE CITY APPROVED PLAN. WILL ASK REVIEWER IF CONTRACTOR NEEDES TO SUBMIT A REVISION TO THE CITY. NO STORM WATER CONCERNS AT THIS TIME |
11/30/2012 | SWPPP CORRECTION NOTICE | RLEDONNE | Approved | CONCRETE WASHOUT HAS BEEN STALLED. |
11/27/2013 | GRADING - REBAR | DROBERTS | Approved | |
11/27/2013 | GRADING - CHECK FOR ACTIVITY | DROBERTS | Approved |