Permit: T09BU01243
Permit Details
Apply Date:
08/20/2009
Applicant:
N/A
Description:
GRADING FOR NEW OFFICE
Contractors:
- EPSTEIN CONSTRUCTION L L C
Permit Reviews
Permit Number - T09BU01243
Permit Status: Final
Permit Description: GRADING FOR NEW OFFICE
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 08/20/2009 | PLANS OK TO SUBMIT - GRADING | 08/20/2009 | COMPLETED |
| 08/20/2009 | GRADING | 09/14/2009 | COMPLETED |
| 10/01/2009 | RESUBMITTAL - GRADING ALL | 10/14/2009 | COMPLETED |
| 10/29/2009 | RESUBMITTAL - GRADING | 07/19/2010 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T09BU01243
Permit Status: Final
Permit Description: GRADING FOR NEW OFFICE
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 08/20/2009 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Completed Inspections
Permit Status: Final
Permit Number: T09BU01243
Permit Description: GRADING FOR NEW OFFICE
Total Completed Inspections - 7
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/21/2010 | ENGINEERING PRE-CONSTRUCTION | MRUSSO | Approved | MET W/ SUPINTENDENT ON SITE. CONTRACTOR HAS AN APPROVED GRADING PERMIT AND GRADING PLAN ON SITE. SITE IS < 1 ACRE THEREFORE A SWPPP IS NOT REQUIRED HOWEVER CONTRACTOR MUST PROTECT THE REGULATED WASH LOCATED TO THE SOUTH OF THE PROJECT. FOOTINGS FOR THE PERIMETER WALL ALONG THE SOUTH HAS BEEN INSTALLED AND THE WALL WILL BE COMPPLETED NEXT WEEK. CONTRACTOR MUST SWEEP UP ANY TRACKED MATERIAL OFF ROADWAYS ROUTINELY. CALL FOR RE-INSPECTION AS NEEDED. |
| 12/10/2010 | GRADING - INTERMEDIATE | MRUSSO | Approved | MAJORITY OF SITE WORK COMPLETED, WAITING FOR LANDSCAPING, AND RAILING FOR PEDESTRIAN ACCESS RAMPS. PARKING, ACCESS, DRAINAGE AND TRASH ENCLOSURE HAS BEEN COMPLETED PER THE APPROVED PLAN. |
| 04/29/2011 | GRADING - TIER REV | MRUSSO | Approved | |
| 04/29/2011 | GRADING - CHECK FOR ACTIVITY | MRUSSO | Approved | |
| 04/29/2011 | GRADING - FINAL | MRUSSO | Approved | ELAVATION CERTIFICATE HAS BEEN SUBMITTED AND APPROVED, AN AS-BUILT PLAN HAS BEEN COMPLETED, AND A STORM DRAINAGE CERTIFICATION STATEMENT FROM THE ENG. OF RECORD HAS BEEN ARCHIVED |
| 04/29/2011 | LANDSCAPE INSPECTION | MRUSSO | Approved | |
| 06/28/2019 | GRADING - REBAR | RLEDONNE | Approved |