Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Number: T09BU01243
Parcel: 11204370H

Review Status: Completed

Review Details: GRADING

Permit Number - T09BU01243
Review Name: GRADING
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
09/03/2009 MICHAEL ST. PAUL ZONING REVIEW Denied September 3, 2009

Development Services Department
Zoning Review Section

Michael St.Paul
Planning Technician

T09BU01243 Grading Plans for T09CM00695


Comments:

1. The grading plan has been reviewed by Zoning Review Section but cannot approve the plan until it has been approved by the Engineering, and Landscape Review Sections and until all zoning comments or concerns have been addressed.

2. We cannot verify that the grading plan is in compliance with an approved site plan for this site. Please provide one copy of the stamped approved site plan with your next submittal.

3. Zoning will re-review the grading plan on the next submittal to ensure compliance with the approved site plan. Additional comments may be forthcoming.
09/08/2009 BIANCA RAMIREZ ENGINEERING REVIEW Denied DATE: September 8, 2009
SUBJECT: Grading
TO: Jeff Stanley
LOCATION: 3038 E Fort Lowell Rd, T13S, R13E, Section 34, Ward 1
REVIEWERS: Bianca Ramirez, CFM
ACTIVITY: T09BU01243 (First Review)


RESUBMITTAL REQUIRED: Grading Plan

SUMMARY: Engineering Division of Development Services Department has received and reviewed the proposed grading plan for the above referenced property. Engineering Division does not recommend approval of the grading plan at this time. Please address the following review comments prior to the next submittal.

Please include a response letter to the comments along with the corrected copies of the grading plan.

Please provide a drainage report with the next submittal.

Grading Plan Comments:

1. Please identify limits of gradable area and indicate boundary symbol in legend.
2. Call out surface paving material.
3. Show details of all surface materials.
4. A permit or a private improvement agreement will be necessary for any work performed within the Right-of-way. Contact Permits and Codes at (520) 791-5100 for permit information.
5. Delineate 100-year water surface elevations and cross sections.
6. Cut or fill slopes require a 2' minimum setback from property line.
7. Provide the Federal Emergency Management Agency, Flood Insurance Rate Map information and Zone designation on the site plan. Acknowledge that entire property is located within special flood hazard area, Zone: AE.
8. All walls should have openings, in order to permit the entry and exit of floodwaters.
9. Provide documentation from COT Transportation stating that there will be no intersection widening. D.S. 2-02.2.1.A.19. It does not appear that the future right-of-way (ROW) is shown correctly. Per the MS&R map the intersection widening width is 130'.
10. The existing ingress/egress parking & pedestrian easement will need to be modified to include the entire PAAL located south of the Wintrode Office. This comment must be addressed prior to approval of this site plan. D.S. 2-02.2.1.A.20 The sidewalk shown along the west side of the Wintrode Office building is part of the required continuous pedestrian circulation /accessible route a pedestrian access easement is required to allow access to and from the proposed office building.
11. DS Sec.2-02.2.1.A.19: Label the future sidewalk and curb area on the site plan to verify that all improvements are located outside of the future ROW.
12. DS Sec.2-02.2.1.A.19: Label the future sidewalk and curb area on the site plan to verify that all improvements are located outside of the future ROW.
13. Verify that all easements of record have been graphically shown on the plan together with recording docket and page per D.S. 2-02.2.1.20.
14. A permit or a private improvement agreement will be necessary for any work performed within the Right-of-way. Contact Permits and Codes at (520) 791-5100 for permit information.
15. D.S. 2-02.2.1.A.20 The sidewalk shown along the west side of the Wintrode Office building is part of the required continuous pedestrian circulation /accessible route a pedestrian access easement is required to allow access to and from the proposed office building.
16. D.S. 2-02.2.1.A.21 Show the location of future curb along Fort Lowell Road.
17. Correct Far side SVT to 125' from PAAL.
18. Verify that all keynotes have been called out correctly.
19. Additional comments may be forthcoming.

Drainage Report:

1. Erosion set back within Drainage Report indicated 47.54' and site plan is calling out 10' erosion setback. Please note that the rip rap must tie into any existing adjacent rip rap or additional erosion protection for upstream and downstream portion of property needs to be provided.
2. Complied.
3. Complied.
4. Additional comments may be forthcoming.


If you have any questions, I can be reached at Bianca.ramirez@tucsonaz.gov or 837-4928.

Bianca Ramirez
Engineering Associate
City of Tucson/Development Services Department
201 N. Stone Avenue
P.O. Box 27210
Tucson, Arizona 85726-7210
(520) 837-4928 office
(520) 879-8010 fax
09/09/2009 ANDREW CONNOR NPPO REVIEW Denied Submit a copy of the approved site and landscape plans for reference. The application will be reviewed for compliance when the approved documents are included in the submittal. Revise grading plans as necessary to comply with Engineering comments and concerns.

Final Status

Task End Date Reviewer's Name Type of Review Description
09/14/2009 SUE REEVES OUT TO CUSTOMER Completed
09/14/2009 SUE REEVES REJECT SHELF Completed