Inspection History: GRADING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/29/2011 | GRADING - FINAL | Approved | ELAVATION CERTIFICATE HAS BEEN SUBMITTED AND APPROVED, AN AS-BUILT PLAN HAS BEEN COMPLETED, AND A STORM DRAINAGE CERTIFICATION STATEMENT FROM THE ENG. OF RECORD HAS BEEN ARCHIVED | |
| 04/14/2011 | GRADING - FINAL | Partial Approval | CONTRACTOR PROVIDED A COPY OF A COMPLETED ELEVATION CERTIFICATION. PROVIDE A DRAINAGE CERT STATEMENT FROM THE ENGINEEER AND AN APPROVED PLAN FOR FINAL INSPECTION THAT SHOWS WHAT WAS CONSTRUCTED. COMPLETE ALL LANDSCAPING. |
|
| 03/24/2011 | GRADING - FINAL | Continued | 1) PROVIDE AN ELEVATION CERTIFICATE ASSURING THE FINISHED FLOOR ELEVATION OF THE NEW BLDG. 2) PROVIDE A CERTIFICATION STATEMENT FROM THE ENG OF RECORD STATING THAT ALL DRAINAGE WAYS AND SITE WORK WAS COMPLETED PER THE APPROVED PLAN. 3) PROVIDE A PLAN SHOWING WHAT WAS BUILT - WALL OPENINGS ALONG EAST WALL AND NEW FIRE HYDRANT 4) COMPLETE LANDSCAPING PER PLAN. 5) MAY NEED TO RE - VEGITATE SLOPE ALONG WASH TO PRE-CONSTRUCTION CONDITION. |
|
| 01/14/2011 | GRADING - FINAL | Continued | NO ONE ON SITE, NO ACTIVITY. MAJORITY OF SITE WORK COMPLETED PER PLAN. |