Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: T08CM03401
Permit Details
Apply Date:
10/16/2008
Applicant:
N/A
Description:
NEW MEDICAL BLDG
Architects:
- GANSLINE, WILLIAM ROYAL
Contractors:
- LLOYD CONSTRUCTION COMPANY INC ,
Permit Reviews
Permit Number - T08CM03401
Permit Status: C of o
Permit Description: NEW MEDICAL BLDG
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
01/08/2009 | POST 3RD PARTY REVIEW | 01/13/2009 | COMPLETED |
01/13/2009 | RESUBMITTAL | 01/14/2009 | COMPLETED |
04/30/2009 | REVISION - - 1ST | 04/30/2009 | COMPLETED |
04/30/2009 | REVISION - - 1ST | 05/21/2009 | COMPLETED |
05/27/2009 | REVISION - - 1ST | 06/08/2009 | COMPLETED |
06/12/2009 | REVISION - - 2ND | 06/23/2009 | COMPLETED |
06/23/2009 | REVISION - - 3RD | 08/13/2009 | COMPLETED |
08/12/2009 | REVISION - - 4TH | 08/13/2009 | COMPLETED |
10/16/2008 | PLANS OK TO SUBMIT - 3RD PARTY | 10/17/2008 | COMPLETED |
10/17/2008 | 3RD PARTY REVIEW-COMMERCIAL | 01/08/2009 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T08CM03401
Permit Status: C of o
Permit Description: NEW MEDICAL BLDG
Total Outstanding Activity Conditions - 1
Date | Name |
---|---|
10/16/2008 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Completed Inspections
Permit Status: C of o
Permit Number: T08CM03401
Permit Description: NEW MEDICAL BLDG
Total Completed Inspections - 44
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
06/15/2009 | ELECTRIC - UFER | DSANTACR | Approved | IVRS - Inspection :* |
06/26/2009 | STEM WALL/RETAINING WALL | AQUIROZ | Approved | IVRS - Inspection :* 1) GL D.1-M.1-H.8, D.8/B 6.5/B.1-A.4 |
08/12/2009 | PLUMBING - ROUGH, SOIL | RMYERS | Approved | IVRS - Inspection :* 1) OK FOR CONCRETE S.T.O.I. |
08/12/2009 | ELECTRIC - UNDERGROUND | DSANTACR | Approved | IVRS - Inspection :* 1) OK REMAINDER OF INSIDE BLDG BELOW SLAB |
08/12/2009 | PLUMBING - PRE SLAB | RMYERS | Approved | IVRS - Inspection :* |
08/17/2009 | BUILDING PRE-SLAB | JBURGE | Approved | IVRS - Inspection :* 1) EAST PORTION OF BLDG-COLUMN LINE 3.5-8 2) OK TO POUR PROGRESS AREA |
08/26/2009 | ELECTRIC - CABLE DROP | DSANTACR | Approved | IVRS - Inspection :* 1) OK CONTINUE SECONDARYS TO CORNER OF BLDG AND PHONE 2) OK SECONDARYS AND PHONE CONDUITS FOR 2396 |
11/12/2009 | REINFORCED MASONRY PRE-GROUT | AQUIROZ | Approved | IVRS - Inspection :* 1) TOP OUT ON ARCHES |
11/13/2009 | PLUMBING - SEWER HCS CONNECT | RMYERS | Approved | IVRS - Inspection :* |
11/18/2009 | EXCAVATION/LAYOUT REBAR & ZON | JBURGE | Approved | IVRS - Inspection :* 1) 2-C3/F8 COLUMN FOOTINGS (STAIRWELL FOOTINGS)-OK TO POUR FOOTINGS |
11/25/2009 | PLUMBING - ABOVE CEILING | BBENEDON | Approved | IVRS - Inspection :* 1) HELD OVER OK 8 AM MIKE D |
12/04/2009 | ROOF NAILING | JBURGE | Approved | IVRS - Inspection :* 1) SINGLE MEMBRANE SYSTEM-OK TO COVER PORCHES AND MAIN BODY |
12/11/2009 | PLUMBING - YARD WTR LINE/TEST | RMYERS | Approved | IVRS - Inspection :* 1. PLASTIC PIPE MAY NOT BE TESTED WITH AIR 2. FILL ALL ROOF DRAINS |
12/14/2009 | PLUMBING - ROOF DRAINS | BBENEDON | Approved | IVRS - Inspection :* |
12/17/2009 | PLUMBING - INTERMEDIATE | RMYERS | Approved | IVRS - Inspection :* 1) UNDERFLOOR PIPING FOR RESTROOM 2) OK TO COVER-WILL RECHECK WHEN WALLS ARE ERECTED 3) 2ND FLOOR EAST SIDE OK TO COVER ? FOR RESTROOM #2 & 3 |
12/21/2009 | SHEET ROCK NAILING | AQUIROZ | Approved | IVRS - Inspection :* 1) PROGRESS AREA 1ST FLOOR |
12/29/2009 | MECHANICAL - INTERMEDIATE | MRAMBER | Approved | IVRS - Inspection :* 1) 1ST FLOOR RESTROOM EXHAUST (X5) OK |
12/29/2009 | STUCCO MESH | JBURGE | Approved | IVRS - Inspection :* 1) EAST, WEST AND SOUTH WALLS OK TO STUCCO |
12/29/2009 | FRAMING | JBURGE | Approved | IVRS - Inspection :* 1) MAIN ENTRY CANOPY WELDS-BUTTON PUNCH-WELDS |
12/30/2009 | ELECTRIC - INTERMEDIATE | DSANTACR | Approved | IVRS - Inspection :* 1) OK 2ND FLOOR WALLS-PANELS NOT IN YET |
12/30/2009 | MECHANICAL - ABOVE CEILING | MRAMBER | Approved | IVRS - Inspection :* |
02/19/2010 | TEP CLEARANCE - AM | JWEATHER | Approved | TEC CLEARED FOR BLDG 2 FOR #100 & OWNERS METER PER D. SANTACRUZ |
03/01/2010 | EXT METAL CLIPS/EXT SHEATHING | AQUIROZ | Approved | IVRS - Inspection :* |
03/08/2010 | ELECTRIC - ABOVE CEILING | DSANTACR | Approved | IVRS - Inspection :* |
04/05/2010 | MECHANICAL - FINAL | MRAMBER | Approved | IVRS - Inspection :* |
04/06/2010 | RIGHT OF WAY - FINAL | MOTERO | Approved | |
04/06/2010 | ELECTRIC - FINAL | DSANTACR | Approved | IVRS - Inspection :* |
04/06/2010 | SIGN - FINAL | JYBARRA | Approved | IVRS - Inspection :* |
04/08/2010 | FIRE SPKLR - FINAL | CSCHULTZ | Approved | |
04/08/2010 | FIRE - ALARM FINAL | CSCHULTZ | Approved | |
04/08/2010 | FIRE - FINAL | CSCHULTZ | Approved | |
04/08/2010 | U VALUE FOR WINDOW | JBURGE | Approved | IVRS - Inspection :* |
04/08/2010 | BUILDING ABOVE CEILING | JBURGE | Approved | IVRS - Inspection :* |
04/23/2010 | ENGINEERING - FINAL | MRUSSO | Approved | SEE GRADING PERMIT #T08BU01907 FOR INSPECTION NOTES |
04/28/2010 | NPPO - FINAL | MRUSSO | Approved | |
04/28/2010 | LANDSCAPE - FINAL | MRUSSO | Approved | |
05/05/2010 | OUTDOOR LIGHTING FINAL | DSANTACR | Approved | IVRS - Inspection :* |
05/07/2010 | PERMIT FINALED | JWEATHER | Approved | |
05/07/2010 | BUILDING - FINAL | AQUIROZ | Approved | IVRS - Inspection :* 1) OK C OF O |
05/07/2010 | ZONING - FINAL | JLINVILLE | Approved | |
05/07/2010 | ELECTRIC - TEMP POWER FOR TEST | LHANLY | Approved | |
05/07/2010 | PLUMBING - FINAL | LHANLY | Approved | |
05/07/2010 | PLUMBING - BACK WATER VALVE | LHANLY | Approved | |
05/07/2010 | ELECTRIC - OUTDOOR LIGHTING | LHANLY | Approved |