Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Address Search: 2404 E RIVER RD
Search
Annexations & Original City Zoning (OCZ)
Address: 2404 E RIVER RD
Date - 11/22/2024 11:45 a.m.
Total Number Of Annexations & Original City Zoning (1)
Rezoning Cases
Date - 11/22/2024 11:45 a.m.
Total Number Of Rezone Cases - (1)
Case No. | Description | New Zone | Status | Status Date |
---|---|---|---|---|
C9-04-04 | Elks Club - River Road | O-2 | Effectuated | 03/01/2006 |
Special Development Requests & Requirements
Address: 2404 E RIVER RD
Date - 11/22/2024 11:45 a.m.
Total Number Of Special Development Permits - (3)
Activity Number | Status | Apply Date | Expired Date | Unit | Type | Description |
---|---|---|---|---|---|---|
T05SA00116 | CLOSED | 03/10/2005 | N/A | Board of Adjustment | ||
T05SA00238 | APPROVED | 06/15/2005 | N/A | Overlay Zone | ||
T22SA00210 | COMPLETE | 04/29/2022 | N/A | Zoning Adminstration Letter | Zoning compliance letter for Medical Service - Outpatient use |
Permits
Address: 2404 E RIVER RD
Date - 11/22/2024 11:45 a.m.
Total Number Of Permits - (53)
Permit | Status | Apply Date | Expired Date | Unit | Type | Description |
---|---|---|---|---|---|---|
TF-FCP-1123-01328 | Complete | 11/20/2023 | 06/12/2024 | Fire Construction Permit | Tenant Improvement | |
TF-FOP-0523-01037 | Complete | 05/19/2023 | 05/23/2024 | BLDG 1 | Fire Operational Permit | Pima Heart and Vascular outpatient |
TF-FOP-0523-01038 | Complete | 05/19/2023 | 05/23/2024 | BLDG 2 UNIT 100 | Fire Operational Permit | Pima Heart and Vascular outpatient |
TC-COM-0523-01284 | Complete | 05/16/2023 | 09/21/2024 | BLDG 2 UNIT 100 | Commercial Building | This project consists of a 879 sq.ft. remodel in an existing medical building for the installation of a Biograph Horizon equipment |
T21FC00365 | Expired | 05/10/2021 | 06/26/2022 | 02 | Fire Construction Permit | Fire Alarm & Detection Systems - INSTALLATION OF NEW CELLULAR DIALER STARLINK FIRE; Fire Alarm Systems - Monitor Only |
TR-UTL-0523-01521 | Complete | 05/09/2023 | 07/19/2023 | BLDG 1 | Right-of-Way (ROW) - Utility | P.124502-2: ACCESS OF EX MH 19977 FOR SPLICING |
TR-UTL-0523-01522 | Complete | 05/09/2023 | 07/19/2023 | BLDG 1 | Right-of-Way (ROW) - Utility | P.124502-3: ACCESS OF EX MH 20825 FOR SPLICING |
T05AN00609 | ISSUED | 06/03/2005 | N/A | ADDRNEW | ||
T05BU01344 | EXPIRED | 05/27/2005 | 11/09/2020 | GRADING | GRADING 5000CU 10000FI | |
T05CM02765 | WITHDRWN | 06/16/2005 | N/A | COMBO | NEW SFR -TOWNHOMES | |
T05OT02705 | WITHDRWN | 11/01/2005 | 05/02/2006 | SITE | SITE: | |
T05OT02707 | FINAL | 11/01/2005 | N/A | FLOODPLN | FLOODPLAIN USE PERMIT | |
T05OT03129 | WITHDRWN | 12/16/2005 | N/A | FLOODPLN | FLOODPLAIN USE PERMIT | |
T08CM03401 | C OF O | 10/16/2008 | 11/03/2010 | 02 | COMBO | NEW MEDICAL BLDG |
T08CM03674 | C OF O | 11/13/2008 | 09/25/2010 | 01 | COMBO | NEW:MEDICAL OFFICE BLDG |
T09AN00625 | ISSUED | 12/03/2009 | N/A | 02 | ADDRNEW | |
T09BU01158 | FINAL | 08/06/2009 | 02/10/2010 | 01 | SPKLR | SPRINKLER - 120 LF OF 4" UG |
T09CM01693 | C OF O | 06/30/2009 | 11/14/2010 | 02 | COMBO | TI and CofO: MEDICAL OFFICE |
T10CM00457 | FINAL | 02/24/2010 | 10/12/2010 | 01 | COMBO | ADDITION: PARKING SHADE STRUCTURE-BUILDING "A" |
T10CM01518 | C OF O | 06/03/2010 | 05/28/2012 | 01 | COMBO | TI and C of O: HEALTH BAR |
T10OT02123 | FINAL | 09/30/2010 | 05/08/2011 | 02 | SIGN | 18957 |
T10OT02125 | FINAL | 09/30/2010 | 05/15/2011 | 02 | SIGN | BANNER: 45 DAY, 9/30/10 - 11/14/2010 |
T10OT02327 | FINAL | 10/28/2010 | 05/22/2011 | 02 | SIGN | 19061 |
T11BU01579 | FINAL | 11/30/2011 | 05/30/2012 | 01 | SPKLR | Add 7 fire sprinklers |
T11CM00993 | C OF O | 04/05/2011 | 11/05/2011 | 02 | COMBO | TI: MEDICAL OFFICE |
T11OT00915 | EXPIRED | 05/10/2011 | 11/08/2011 | 02 | SIGN | 19592 |
T11OT00916 | FINAL | 05/10/2011 | 12/26/2011 | 02 | SIGN | BANNER; 45 DAY, FROM 05/10/11 - 06/24/11 |
T11OT01413 | FINAL | 07/18/2011 | 02/12/2012 | 01 | SIGN | 19783 |
T12CM08062 | FINAL | 12/20/2012 | 01/08/2014 | 02 | COMBO | TI: MEDICAL OFFICE |
T12OT00556 | FINAL | 04/05/2012 | 07/22/2013 | SIGN | 1- DP SIGN WITHIN SCZ 20394 | |
T13BU00441 | FINAL | 04/11/2013 | 12/28/2013 | 02 | SPKLR | FIRE SPRINKLER |
T13BU00572 | FINAL | 05/16/2013 | 12/28/2013 | BUILD | FIRE ALARM (FOR WHOLE BUILDING) | |
T14OT00179 | FINAL | 02/10/2014 | 08/27/2014 | 02 | SIGN | 1- METAL WALL SIGN |
T15BU00662 | FINAL | 06/12/2015 | 01/06/2016 | 02 | SPKLR | FIRE SPRKL |
T15CM02532 | C OF O | 04/15/2015 | 01/06/2016 | 02 | COMBO | OFFICE |
T15CM08279 | C OF O | 11/24/2015 | 07/09/2016 | 01 | COMBO | OUT PATIENT CLINIC |
T17CM03447 | FINAL | 05/03/2017 | 12/20/2017 | 02 | COMBO | TI: MEDICAL OFFICE |
T17FC00460 | FINAL | 06/01/2017 | 12/19/2017 | FIRECONS | RELOCATE 3. | |
T18CM06772 | L OF C | 08/28/2018 | 07/30/2019 | 01 | COMBO | TI: REMODELING EXISTING MEDICAL OFFICE |
T18FC00778 | FINAL | 09/21/2018 | 07/17/2019 | FIRECONS | Relocate 20 and Add 20 Pendant Sprinklers | |
T18FO00662 | FINAL | 08/09/2018 | 03/31/2019 | 01 | FIREOPER | CARDIAC REHAB |
T19FC00083 | FINAL | 01/29/2019 | 07/30/2019 | 01 | FIRECONS | TAKE OVER CELLULAR MONITORING. INSTALL NEW DSC 4010LE CF FIRE COMMUNICATOR. |
T19RW01496 | FINAL | 03/21/2019 | 05/24/2019 | ROW | Continuing From Pima ROW, ( 2404 E River Rd) 50' overlash SE, continuing 587' overlash , riser down and begin 50' trench/bore continuing SW, place 3x3 pothole and place new COX cabinet | |
T19RW07411 | FINAL | 12/04/2019 | 04/08/2020 | ROW | STARTING AT COX EXISTING PED, TRENCH/BORE WEST 65' SOUTH 10' TO OUT OF ROW. 02/06/2020: Starting in front of 2450 E. River Rd at Cox existing PED, trench/bore North 30' West 65' then South 10' to out of row | |
T20CM07303 | L OF C | 10/23/2020 | 11/15/2021 | COMBO | WORK CONSISTS OF A 3719 SQ FT MED OFFICE REMODEL ON 2ND FLOOR OF BLDG 2 SUITE 210 | |
T20OT00846 | FINAL | 12/30/2020 | 08/15/2021 | SIGN | 2- non illum wall signs | |
T21CM02927 | FINAL | 04/05/2021 | 02/16/2022 | 100 | COMBO | 813 sq.ft. remodel & CT Scan installation in an existing 3,601 sq.ft. medical office. This 2nd floor work is an extension of the first floor therefore it is listed under Suite 100. |
T21CM04373 | FINAL | 05/24/2021 | 06/07/2022 | 132 | COMBO | Remodel of an existing 5,229 sq.ft. office. Business office remodel is existing 5229 sf... Vein center-minor remodel to add 291 sf stg. |
T21FC00002 | FINAL | 01/04/2021 | 11/08/2021 | FIRECONS | STE #210 - Relocate/add/adjust 27 pendent sprinklers to accomodate new TI | |
T21FC00566 | FINAL | 07/19/2021 | 02/14/2022 | FIRECONS | SUITE 210 - RELOCATE 8 | |
T21OT00173 | FINAL | 03/09/2021 | 01/02/2022 | SIGN | 1-non illum wall sign building 2 | |
T22FO00256 | FINAL | 03/16/2022 | 11/12/2022 | 01 | FIREOPER | PIMA HEART & VASCULAR - OUTPATIENT |
T22FO00257 | FINAL | 03/16/2022 | 11/12/2022 | 02 | FIREOPER | COMBINED WITH BLDG 2 #100 - PIMA HEART & VASCULAR - OUTPATIENT |
Plans
Address: 2404 E RIVER RD
Date - 11/22/2024 11:45 a.m.
Total Number Of Plans - (3)
Plan Number | Status | Application Date | Exp Date | Unit | Type | Description |
---|---|---|---|---|---|---|
S04-141 | Approved | 10/05/2004 | 07/30/2015 | -- Subdivision/Plats | RIVER WALK | |
C9-04-04 | EFFECTED | 03/01/2006 | N/A | REZONING PROCEDURES -- REZONE | The preliminary development plan is for 140 residential units and 15,000 square feet of office on 12.2 acres. | |
C9-07-02 | CLOSED | 01/29/2007 | N/A | REZONING PROCEDURES -- REZONE | The preliminary development plan dated 1/26/07 proposes construction of 22,550 square feet of mixed use development in three, two-story structures for a neighborhood market, restaurant, local services and offices on 2 acres. |
Record Requests
Address: 2404 E RIVER RD
Date - 11/22/2024 11:45 a.m.
Total Number Of Requests - (4)
Request Number | Status | Request Date | Completed Date | Type | Description |
---|---|---|---|---|---|
REQ-0224-01108 | Denied | 02/08/2024 | N/A | Requests | This Project is not complete all conditions need to be satisfied special inspection certificate needs to be submitted and approved for Epoxy Anchors. Please re-request LofC/CofO once the special inspection certificate is approved. This project consists of a 879 sq.ft. remodel in an existing medical building for the installation of a Biograph Horizon equipment |
REQ-0324-02152 | Denied | 03/18/2024 | N/A | Requests | This project (TC-COM-0523-01284) Is not yet complete. 1. This Project is not yet complete. All conditions need to be satisfied. A special inspection certificate needs to be submitted and approved for Epoxy Anchors. Please re-request LofC/CofO once the special inspection certificate is approved. If you have any questions, please contact building_official@tucsonaz.gov This project consists of a 879 sq.ft. remodel in an existing medical building for the installation of a Biograph Horizon equipment |
REQ-0324-02189 | Denied | 03/19/2024 | N/A | Requests | This Project is not complete all Reviews/Revision need to be approved and or completed. Please re-request once the review is approved and complete. This project consists of a 879 sq.ft. remodel in an existing medical building for the installation of a Biograph Horizon equipment |
REQ-0424-02546 | Complete | 04/01/2024 | 04/01/2024 | Requests | This project consists of a 879 sq.ft. remodel in an existing medical building for the installation of a Biograph Horizon equipment |