Permit Details

Status:
Final
Type:
COMMERCIAL OTHER
Address:
4040 N ORACLE RD
Address NEW:
4040 N ORACLE RD
Apply Date:
05/30/2008
Applicant:
N/A
Description:
GRADING: CATALINA VIEW CENTER - CUT 1,500CY FILL 30,000
Contractors:
  • A P SOUTHWEST L L C

Permit Reviews

Permit Number - T08BU01010
Permit Status: Final
Permit Description: GRADING: CATALINA VIEW CENTER - CUT 1,500CY FILL 30,000
Start Date Submittal Complete Date Status  
01/29/2009 REVISION - GRADING 01/29/2009 COMPLETED Review Details
05/30/2008 PLANS OK TO SUBMIT - GRADING 05/30/2008 COMPLETED Review Details
05/30/2008 GRADING 08/15/2008 COMPLETED Review Details
09/08/2009 REVISION - GRADING 09/08/2009 COMPLETED Review Details
09/08/2009 REVISION - GRADING 01/14/2010 COMPLETED Review Details
11/06/2008 RESUBMITTAL - GRADING ALL 12/16/2008 COMPLETED Review Details

Outstanding Activity Conditions

Permit Number - T08BU01010
Permit Status: Final
Permit Description: GRADING: CATALINA VIEW CENTER - CUT 1,500CY FILL 30,000
Total Outstanding Activity Conditions - 1
Date Name
05/30/2008 PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION.

Completed Inspections

Permit Status: Final
Permit Number: T08BU01010
Permit Description: GRADING: CATALINA VIEW CENTER - CUT 1,500CY FILL 30,000
Total Completed Inspections - 9
Date Description Inspector Results Comments
01/08/2009 ENGINEERING PRE-CONSTRUCTION MRUSSO Approved 1) INSTALL PERIMETER SEDIMENT CONTROLS PER YOUR SWPPP AS SOON AS ASPHALT MILLING BEGINS.
2) INSTALL STABILIZED CONSTRUCTION ENTRANCES FOR INGRESS/EGRESS OF SITE IN ORDER TO REDUCE TRACKING ONTO PUBLIC ROADWAYS.
3) POSTA A COPY OF YOUR NOI W/AZPDES AUTHORIZATION NUMBER AT CONSTRUCTION TRAILER.
4) IDENTIFY RESPOSIBLE PARTY'S FOR SWPPP COMPLIANCE.
5) PERFORM STORM WATER MAINTENANCE INSPECTIONS AS PRESCIBED IN YOUR PLAN AND DOCUMENT THEM.
6) CONTINUE TO PROTECT ALL CATCH BASIN INLETS ON SITE DURING CONSTRUCTION.
7) SWEEP UP TRACKING OFF OF PARKING LOT AND PUBLIC ROADWAYS DAILY.
01/15/2009 STORMWATER INSTALL OF CONTROLS MRUSSO Approved 1) WADDLE WAS ADDED TO PERIMETER OF STOCKPILES LOCATED ALONG THE NE CORNER OF THE SITE.
2) CONCRETE WASH OU SYSTEM ON SITE
3) MAY NEED TO PROTECT STORM DRAIN ALONG NORTH SIDE OF SITE UNTIL CONSTRUCTION BEGINS ON NEW STORM DRAIN PIPE.
4) SEDIMENT CONTROLS WILL BE MOVED BASED ON PHASES OF CONSTRUCTION
5) CONTINUE TO FOLLOW YOUR SWPPP
6) NOI HAS BEEN POSTED IN CONSTRUCTION TRAILER
08/07/2009 GRADING - TIER REV ELEIBOLD Approved Richard Macias inquired about what would be needed for a Temp Cof O. I stated that Final Revised Grading Plan would need to be submitted for final inspections and that safety-related improvements such as traffic improvements would need to be completed prior to CofO for public use. I referred him to Jim Femling for further info.
09/14/2009 GRADING - INTERMEDIATE MRUSSO Approved
09/14/2009 GRADING - CHECK FOR ACTIVITY MRUSSO Approved
09/14/2009 STORMWATER FOLLOW-UP INSP MRUSSO Approved
09/14/2009 GRADING - FINAL MRUSSO Approved HAVE CERT FROM ENG OF RECORD.
AS-BUILT SUBMITTED TO RECORDS.
09/23/2009 LANDSCAPE INSPECTION ACONNOR Approved Approved per Joe Linville
09/30/2009 PERMIT FINALED KMEDINA Approved