Inspection History Details
Inspection Status: Approved
Inspection History: STORMWATER INSTALL OF CONTROLS
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/15/2009 | STORMWATER INSTALL OF CONTROLS | Approved | 1) WADDLE WAS ADDED TO PERIMETER OF STOCKPILES LOCATED ALONG THE NE CORNER OF THE SITE. 2) CONCRETE WASH OU SYSTEM ON SITE 3) MAY NEED TO PROTECT STORM DRAIN ALONG NORTH SIDE OF SITE UNTIL CONSTRUCTION BEGINS ON NEW STORM DRAIN PIPE. 4) SEDIMENT CONTROLS WILL BE MOVED BASED ON PHASES OF CONSTRUCTION 5) CONTINUE TO FOLLOW YOUR SWPPP 6) NOI HAS BEEN POSTED IN CONSTRUCTION TRAILER |
|
| 01/08/2009 | STORMWATER INSTALL OF CONTROLS | Partial Approval | WALKED SITE WITH PROJECT MANAGER |