Inspection History Details
Inspection Status: Approved
Inspection History: STORMWATER FOLLOW-UP INSP
Permit Number - T08BU01010
Inspection Description - STORMWATER FOLLOW-UP INSP
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/14/2009 | STORMWATER FOLLOW-UP INSP | Approved | ||
07/28/2009 | STORMWATER FOLLOW-UP INSP | Continued | NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME. SITE IS UNDER A SWPPP UNTIL THE SITE IS 100% STABILIZED AND AN NOT IS FILED WITH ADEQ. | |
06/17/2009 | STORMWATER FOLLOW-UP INSP | Continued | NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME | |
06/05/2009 | STORMWATER FOLLOW-UP INSP | Continued | NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME | |
06/04/2009 | STORMWATER FOLLOW-UP INSP | Continued | NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME | |
05/08/2009 | STORMWATER FOLLOW-UP INSP | Continued | 1) SELF INSPECTIONS HAVE BEEN PERFORMED AND DOCUMENTED. 2) REMOVE MATERIAL OFF OF PERIMETER SEDIMENT CONTROLS ALONG SOUTH SIDE. 3) TRACKING MUST CONTINUE TO BE SWEPT UP ROUTINELY UNTIL SITE IS PAVED |
|
05/07/2009 | STORMWATER FOLLOW-UP INSP | Continued | SWEEP UP TRACKING OFF OF RODGER ROAD. | |
04/22/2009 | STORMWATER FOLLOW-UP INSP | Correction Required | 1) CLEAN OUT STORM DRAIN CATCH BASIN LOCATED ON NW CORNER OF AZ BEAUTY BLDG. 2) SWEEP UP TRACKED SOIL OF OFF RODGER RD. 3) PROVIDE SITE DETAIL ON CONNECTION BETWEEN BLDG ROOF DRAINS AND STORM DRAIN PIPING. DETAIL MUST BE STAMPED BY THE ENG OF RECORD AND APPROVED BY THE CITY OF TUCSON. |
|
04/13/2009 | STORMWATER FOLLOW-UP INSP | Continued | NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME | |
04/09/2009 | STORMWATER FOLLOW-UP INSP | Continued | NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME | |
04/08/2009 | STORMWATER FOLLOW-UP INSP | Continued | NO SIGNIFICANT STORM WATER CHANGES | |
03/26/2009 | STORMWATER FOLLOW-UP INSP | Continued | NO CHANGES | |
03/23/2009 | STORMWATER FOLLOW-UP INSP | Continued | CONTINUE TO SWEEP DAILY UNTIL SITE IS STABILIZED. REPLACE PERIMETER CONTROLS AS NEEDED. NO OTHER SIGNIFICANT STORM WATER CONCERNS AT THIS TIME. |
|
03/17/2009 | STORMWATER FOLLOW-UP INSP | Continued | ||
03/12/2009 | STORMWATER FOLLOW-UP INSP | Continued | NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME | |
03/09/2009 | STORMWATER FOLLOW-UP INSP | Continued | NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME | |
03/04/2009 | STORMWATER FOLLOW-UP INSP | Continued | NO CHANGES | |
02/26/2009 | STORMWATER FOLLOW-UP INSP | Continued | SWEEPER IS BEING USED SEDIMENT CONTROLS ARE MOVED AND ADJUSTED AS NEEDED ON SITE |
|
02/19/2009 | STORMWATER FOLLOW-UP INSP | Correction Required | SWEEP UP TRACKING OFF OF PUBLIC ROADWAY (RODGER RD). RE-ESTABLISH SEDIMENT CONTROLS AS NEEDED. |
|
02/18/2009 | STORMWATER FOLLOW-UP INSP | Continued | NO STORM WATER CONCERNS AT THIS TIME | |
02/12/2009 | STORMWATER FOLLOW-UP INSP | Continued | NO STORM WATER CONCERNS AT THIS TIME. | |
02/10/2009 | STORMWATER FOLLOW-UP INSP | Continued | NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME. | |
02/06/2009 | STORMWATER FOLLOW-UP INSP | Continued | ENSURE ALL STORM WATER CONTROLS ARE MAINTAINED AND IN PLACE. CONTINUE TO SWEEP UP TRACKED MATERIAL DAILY. RAIN FORCAST FOR SUNDAY 2/8/09 |
|
02/05/2009 | STORMWATER FOLLOW-UP INSP | Partial Approval | NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME | |
02/03/2009 | STORMWATER FOLLOW-UP INSP | Continued | NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME. | |
01/29/2009 | STORMWATER FOLLOW-UP INSP | Partial Approval | NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME. | |
01/26/2009 | STORMWATER FOLLOW-UP INSP | Continued | CONTRACTOR NEEDS TO PERFORM SELF-INSPECTION - RAIN DAY NO ACTIVITY - SEDIMENT CONTROLS IN-PLACE | |
01/23/2009 | STORMWATER FOLLOW-UP INSP | Correction Required | RAIN <.05"/SWEEP UP TRACKED MUD AND DEBRIS RE-ESTABLISH SEDIMENT CONTROLS AS NEEDED MAY NEED ROCK ENTRANCE AT EACH WORKING AREA |
|
01/22/2009 | STORMWATER FOLLOW-UP INSP | Partial Approval | NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME | |
01/21/2009 | STORMWATER FOLLOW-UP INSP | Correction Required | SEDIMENT CONTROLS HAVE BEEN PLACED AROUND THE PERIMETER OF THE SITE AND IN AREAS AROUND STOCKPILED MATERIAL. ADD FILTER FABRIC TO EXISTING STORM DRAIN SND CLEAN OUT DRAIN AT NE CORNER OF MICHAEL'S. SEDIMENT CONTROLS ARE REQUIRED UNTIL THE DRAINAGE SYSTEM IS REPLACED. CONTINUE TO PERFORM STORM WATER SELF INSPECTION AND DOCUMENT THEM. CONTINUE TO SWEEP UP TRACKED MATERIAL OFF OF PARKING AREA ROUTINELY. |