Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING PRE-CONSTRUCTION
Permit Number - T08BU01010
Inspection Description - ENGINEERING PRE-CONSTRUCTION
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
01/08/2009 | ENGINEERING PRE-CONSTRUCTION | Approved | 1) INSTALL PERIMETER SEDIMENT CONTROLS PER YOUR SWPPP AS SOON AS ASPHALT MILLING BEGINS. 2) INSTALL STABILIZED CONSTRUCTION ENTRANCES FOR INGRESS/EGRESS OF SITE IN ORDER TO REDUCE TRACKING ONTO PUBLIC ROADWAYS. 3) POSTA A COPY OF YOUR NOI W/AZPDES AUTHORIZATION NUMBER AT CONSTRUCTION TRAILER. 4) IDENTIFY RESPOSIBLE PARTY'S FOR SWPPP COMPLIANCE. 5) PERFORM STORM WATER MAINTENANCE INSPECTIONS AS PRESCIBED IN YOUR PLAN AND DOCUMENT THEM. 6) CONTINUE TO PROTECT ALL CATCH BASIN INLETS ON SITE DURING CONSTRUCTION. 7) SWEEP UP TRACKING OFF OF PARKING LOT AND PUBLIC ROADWAYS DAILY. |
|
01/07/2009 | ENGINEERING PRE-CONSTRUCTION | Partial Approval | MET WITH CONTRACTOR (ADOLPHSON PETERSEN) TO DISCUSS SWPPP REQUIREMENTS DURING DEMO WORK. DEMO OF OUTER BLDGS TAKING PLACE, TARGET DUE TO BE CLOSED ON FEB 5TH. WADDLE HAS BEEN PLACED AROUND EXISTING CATCH BASINS, ADDITIONAL SEDIMENT CONTROLS WILL BE INSTALLED PRIOR TO ASPHALT DEMO AND DIRT WORK. |