Permit: T08BU01010
Permit Details
Apply Date:
05/30/2008
Applicant:
N/A
Description:
GRADING: CATALINA VIEW CENTER - CUT 1,500CY FILL 30,000
Contractors:
- A P SOUTHWEST L L C
Permit Reviews
Permit Number - T08BU01010
Permit Status: Final
Permit Description: GRADING: CATALINA VIEW CENTER - CUT 1,500CY FILL 30,000
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
01/29/2009 | REVISION - GRADING | 01/29/2009 | COMPLETED |
05/30/2008 | PLANS OK TO SUBMIT - GRADING | 05/30/2008 | COMPLETED |
05/30/2008 | GRADING | 08/15/2008 | COMPLETED |
09/08/2009 | REVISION - GRADING | 09/08/2009 | COMPLETED |
09/08/2009 | REVISION - GRADING | 01/14/2010 | COMPLETED |
11/06/2008 | RESUBMITTAL - GRADING ALL | 12/16/2008 | COMPLETED |
Outstanding Activity Conditions
Permit Number - T08BU01010
Permit Status: Final
Permit Description: GRADING: CATALINA VIEW CENTER - CUT 1,500CY FILL 30,000
Total Outstanding Activity Conditions - 1
Date | Name |
---|---|
05/30/2008 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Completed Inspections
Permit Status: Final
Permit Number: T08BU01010
Permit Description: GRADING: CATALINA VIEW CENTER - CUT 1,500CY FILL 30,000
Total Completed Inspections - 9
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
01/08/2009 | ENGINEERING PRE-CONSTRUCTION | MRUSSO | Approved | 1) INSTALL PERIMETER SEDIMENT CONTROLS PER YOUR SWPPP AS SOON AS ASPHALT MILLING BEGINS. 2) INSTALL STABILIZED CONSTRUCTION ENTRANCES FOR INGRESS/EGRESS OF SITE IN ORDER TO REDUCE TRACKING ONTO PUBLIC ROADWAYS. 3) POSTA A COPY OF YOUR NOI W/AZPDES AUTHORIZATION NUMBER AT CONSTRUCTION TRAILER. 4) IDENTIFY RESPOSIBLE PARTY'S FOR SWPPP COMPLIANCE. 5) PERFORM STORM WATER MAINTENANCE INSPECTIONS AS PRESCIBED IN YOUR PLAN AND DOCUMENT THEM. 6) CONTINUE TO PROTECT ALL CATCH BASIN INLETS ON SITE DURING CONSTRUCTION. 7) SWEEP UP TRACKING OFF OF PARKING LOT AND PUBLIC ROADWAYS DAILY. |
01/15/2009 | STORMWATER INSTALL OF CONTROLS | MRUSSO | Approved | 1) WADDLE WAS ADDED TO PERIMETER OF STOCKPILES LOCATED ALONG THE NE CORNER OF THE SITE. 2) CONCRETE WASH OU SYSTEM ON SITE 3) MAY NEED TO PROTECT STORM DRAIN ALONG NORTH SIDE OF SITE UNTIL CONSTRUCTION BEGINS ON NEW STORM DRAIN PIPE. 4) SEDIMENT CONTROLS WILL BE MOVED BASED ON PHASES OF CONSTRUCTION 5) CONTINUE TO FOLLOW YOUR SWPPP 6) NOI HAS BEEN POSTED IN CONSTRUCTION TRAILER |
08/07/2009 | GRADING - TIER REV | ELEIBOLD | Approved | Richard Macias inquired about what would be needed for a Temp Cof O. I stated that Final Revised Grading Plan would need to be submitted for final inspections and that safety-related improvements such as traffic improvements would need to be completed prior to CofO for public use. I referred him to Jim Femling for further info. |
09/14/2009 | GRADING - INTERMEDIATE | MRUSSO | Approved | |
09/14/2009 | GRADING - CHECK FOR ACTIVITY | MRUSSO | Approved | |
09/14/2009 | STORMWATER FOLLOW-UP INSP | MRUSSO | Approved | |
09/14/2009 | GRADING - FINAL | MRUSSO | Approved | HAVE CERT FROM ENG OF RECORD. AS-BUILT SUBMITTED TO RECORDS. |
09/23/2009 | LANDSCAPE INSPECTION | ACONNOR | Approved | Approved per Joe Linville |
09/30/2009 | PERMIT FINALED | KMEDINA | Approved |