Permit: T08BU00475
Permit Details
Status:
Final
Type:
COMMERCIAL OTHER
Address:
941 W FAIRVIEW BUSINESS PARK PL
Address NEW:
941 W FAIRVIEW BUSINESS PARK PL
Apply Date:
03/11/2008
Applicant:
DAN BROCK
Description:
GRADING:1756 CY CUT 0 CY FILL 941 W FAIRVIEW BUSINESS PARK PL Lots 3 and 4 only Refer to T06BU00777 for overall grading and drainage infrastructure of entire subdivision
Architects:
- BROCK, DANIEL WESLEY III
Contractors:
- WESLEY PROPERTIES L L C
Permit Reviews
Permit Number - T08BU00475
Permit Status: Final
Permit Description: GRADING:1756 CY CUT 0 CY FILL
941 W FAIRVIEW BUSINESS PARK PL Lots 3 and 4 only
Refer to T06BU00777 for overall grading and drainage infrastructure of entire subdivision
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 03/11/2008 | PLANS OK TO SUBMIT - GRADING | 03/12/2008 | COMPLETED |
| 03/12/2008 | GRADING | 05/28/2008 | COMPLETED |
| 05/28/2008 | RESUBMITTAL - GRADING ALL | 09/18/2008 | COMPLETED |
| 09/25/2008 | RESUBMITTAL - GRADING | 10/17/2008 | COMPLETED |
| 11/03/2008 | RESUBMITTAL - GRADING | 12/04/2008 | COMPLETED |
| 12/04/2008 | RESUBMITTAL - GRADING | 12/12/2008 | ACTIVE |
Outstanding Activity Conditions
Permit Number - T08BU00475
Permit Status: Final
Permit Description: GRADING:1756 CY CUT 0 CY FILL
941 W FAIRVIEW BUSINESS PARK PL Lots 3 and 4 only
Refer to T06BU00777 for overall grading and drainage infrastructure of entire subdivision
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 03/11/2008 | PLANS EXPIRE IN 180 DAYS FROM DATE OF SUBMITTAL. PERMITS EXPIRE IN 180 DAYS FROM DATE OF ISSUE OR LAST INSPECTION. |
Completed Inspections
Permit Status: Final
Permit Number: T08BU00475
Permit Description: GRADING:1756 CY CUT 0 CY FILL
941 W FAIRVIEW BUSINESS PARK PL Lots 3 and 4 only
Refer to T06BU00777 for overall grading and drainage infrastructure of entire subdivision
Total Completed Inspections - 6
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/18/2008 | GRADING - CHECK FOR ACTIVITY | MRUSSO | Approved | NO ACTIVITY |
| 08/11/2010 | ENGINEERING PRE-CONSTRUCTION | MRUSSO | Approved | 1) SITE IS NOT REGULATED BY A STORM WATER PERMIT, IT IS <1AC; HOWEVER THE CONTRACTOR MUST ENSURE THAT DISTURBED SOIL REMIANS ON SITE THROUGHOUT CONSTRUCTION. 2) PRIOR TO FINAL GRADING APPROVAL, PROVIDE A CERTIFICATION STATEMENT FROM THE EGINEER OF RECORD STATING THAT THE PROJECT WAS CONMPLETED PER THE APPROVED GRADING PLAN. 3) CALL FOR INSPECTION FOR ANY CHANGES TO APPROVED PLANS. |
| 10/27/2010 | GRADING - INTERMEDIATE | MRUSSO | Approved | |
| 10/27/2010 | STORMWATER FOLLOW-UP INSP | MRUSSO | Approved | |
| 10/28/2010 | LANDSCAPE INSPECTION | MRUSSO | Approved | |
| 11/08/2010 | GRADING - FINAL | MRUSSO | Approved | CONTRACTOR PROVIDED BASIN CERT LETTER AND AS-BUILT FOR SITE |