Inspection History: STORMWATER FOLLOW-UP INSP
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/27/2010 | STORMWATER FOLLOW-UP INSP | Approved | ||
| 10/25/2010 | STORMWATER FOLLOW-UP INSP | Continued | SITE BEING PAVED, WILL INSPECT AFTER COMPLETED. NO STORM WATER CONCERNS AT THIS TIME |
|
| 10/19/2010 | STORMWATER FOLLOW-UP INSP | Correction Required | 1) SWEEP UP TRACKED SOIL OFF OF PUBLIC ROADWAY. 2) PROTECT STORM WATER CATCH BASIN ADJACENT TO THE SITE W/ SEDIMENT CONTROLS - POTENTIAL FOR DISCHARGE OFF SITE. 3) CONTRACTOR MUST ENSURE AN APPROVED SET OF PLANS AND THE GRADING PERMIT IS AVAILABLE ON SITE. 4) PRIOR TO FINAL GRADING APPROVAL, PROVIDE A RET/DET BASIN CERT. STATEMENT FROM THE ENG OF RECORD. ROD SHEENAN 928-254-1602 SITE IN NON-COMPLIANCE W/ THE COT STORM WATER ORDINANCE - CORRECT BY FRI 10/22/10. NON-COMPLIANCE WILL RESULT IN A STOP WORK ORDER. |
|
| 10/07/2010 | STORMWATER FOLLOW-UP INSP | Continued | SITE IS ACTIVE, BASIN HAS BEEN CONSTRUCTED. SOME CURBING INSTALLED, SCREEN WALL INSTALLED, SOME SIDEWALKS INSTALLED. NO CONTACT W/ SUPERINTENDENT, NO GRADING PLAN ON SITE, NO PERMIT ON SITE. NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME. SIGNIFICANT RAIN >.5 " NO RUNOFF, MINIMAL TRACKING | |
| 08/11/2010 | STORMWATER FOLLOW-UP INSP | Continued | 1) SITE IS NOT REGULATED BY A STORM WATER PERMIT, IT IS <1AC; HOWEVER THE CONTRACTOR MUST ENSURE THAT DISTURBED SOIL REMIANS ON SITE THROUGHOUT CONSTRUCTION. 2) PRIOR TO FINAL GRADING APPROVAL, PROVIDE A CERTIFICATION STATEMENT FROM THE EGINEER OF RECORD STATING THAT THE PROJECT WAS CONMPLETED PER THE APPROVED GRADING PLAN. 3) CALL FOR INSPECTION FOR ANY CHANGES TO APPOCED PLANS. |